north-south corridor
northern connector
Mark Elford
6 June 2012
north-south corridor78km non-stop from Gawler to Old Noarlunga• completed projects:
• Gallipoli underpass• Northern Expressway• Glenelg Tram Overpass
• current priorities:• South Road Superway• Regency Road to Torrens
River• duplication of Southern
Expressway• Northern Connector
6/6/2012
north south corridor - northern connector
• new multi-mode (road and rail)
transport corridor
• currently listed as a project with
‘real potential’ by Infrastructure
Australia (June 2011)
• part of the north-south corridor
between Gawler and Old
Noarlunga, linking the north with
Adelaide, and its major port
6/6/2012
north south corridor - northern connector
UNDER CONSTRUCTION
COMPLETE
northern connector
project of national significance
• improves road and rail freight access into Adelaide and South Australia’s major port from intrastate regions and interstates
• in accordance with the 30-Year Plan for Greater Adelaide, highly demanded for:• increasing productivity • developing residential land use• linking Southern and Northern industry• reducing greenhouse emissions • separating urban passenger rail services from interstate rail freight
services
• an integral part of Adelaide’s north-south corridor committed to by both State and Federal governments
6/6/2012
north south corridor - northern connector
6/6/2012
north south corridor - northern connector
links vital economic regions
• freight connections between Port
Adelaide and Adelaide Airport to
every other mainland state
• links the premier wine and tourism
regions of the Barossa, Clare Valley
and the Riverland
• the Virginia food bowl – agribusiness
• primary and horticultural industries
• key mining and regional centres
• key SA grain ports and silos
6/6/2012
north south corridor - northern connector
links vital economic regions
• key industrial areas with automotive
($1.7b*), defence ($10b*) and
electronics
• new strategic employment lands -
Greater Edinburgh Parks (to attract
between 25-50% of new demand)
• manufacturing - 28% of state share
• cater for 118,000 new jobs and 270,000
people in the Northern and Barossa
Regions to 2038
6/6/2012
north south corridor - northern connector
overview - road
• 12 km north of Adelaide CBD
• 15km expressway, 3+3 lanes, 110 km/h
• managed motorway (ITS backbone,
VMS, VSL, incident management etc)
• connects Sturt Hwy and Northern
Expressway with the Port River
Expressway and South Road Superway
• includes staging considerations for
interchange access as traffic demand
grows
6/6/2012
north south corridor - northern connector
overview – rail
• 21 km freight rail link between NExy and the Port, overall the new rail
track is approx. 30.9km in length.
• single track with two passing loops, standard gauge
• 6 grade separations in total to facilitate a non-stop road and rail
corridor, including 2 rail overpasses, and 4 road overpasses
• potentially, up to 11 rail crossings can be removed from the existing
rail network
• links with the Adelaide to Perth, Darwin and Sydney rail lines
• growing national export task, particularly mining, requires efficient
link to the Port
6/6/2012
north south corridor - northern connector
concept design of the northern connector
6/6/2012
north south corridor - northern connector
typical cross sections of the northern connector
6/6/2012
north south corridor - northern connector
interchanges – north, south and waterloo corner
• the northern interchange connects in with the recently completed
Northern Expressway
• southern interchange connects with the south road superway
• connecting the South Road Superway to the Nothern Expressway the
northern connector completes almost 45km of the 78km non-stop north-
south corridor (NEXY (24km), connector (15km), superway (4.8km)
6/6/2012
north south corridor - northern interchange with northern expressway
6/6/2012
north south corridor – southern interchange with south road superway
6/6/2012
northern connector – waterloo corner
waterloo corner
• the interchange at
waterloo corner
creates east-west and
north-south access
• exit and enter here for
St Kilda, Waterloo
Corner, Burton,
Salisbury, Elizabeth
etc.
6/6/2012
northern connector – waterloo corner interchange
6/6/2012
north south corridor - northern connector
bolivar interchange
6/6/2012
north south corridor - northern connector
development of northern connector
• The preferred option delivers:
• vital link to the Port of Adelaide with intermodal facilities, industrial
clusters and the National Road Network for key intra and interstate
freight movements
• direct contribution to the national objective of addressing freight
capacity constraints
• better use of existing road asset (refer road traffic demand
information – next slide)
• minimisation of impacts on public transport patronage
6/6/2012
north south corridor - northern connector
forecast traffic volumes on northern connector
• the Northern Connector will cater for 55,000 vehicles per day near
Northern Expressway (northern end), and 78,700 vehicles per day near
South Road Superway (southern end) by 2031
• it is predicted that 39,000 north-south trips will be on the existing
network to the east leading to better use of existing road assets and
improved level of service for the Northern Connector
6/6/2012
north south corridor - northern connector
projected project timeframes
if funding obtained: -
land acquisition and pre-construction works 2013-2014
detailed design and construction 2014-2017
open northern connector to public 2017