TRANSCRIPT

This Partition wall is still there

Wall broken to create Main Door

Concrete Shelves Broken

Small Windows converted into Big Windows

The area between the columns is now Chambers of DMS

This area today is the conference hallBut, without any Columns.

Columns , Columns every where but not a single column seen in the New Office

Today’s EDP Center

Lift Dismantled for EDP & Ledger Section

Op

en A

rea retained

for W

ind

ow

s

Condition of Earlier Warehouse

The same Warehouse Today

The same Warehouse Today

Earlier Today

Earlier Main Entrance Wall

Old used fire Bric

ks

Stone collected from Dismantled Structures

> 700 Flower Pots at Parel

Depot

Where is the Wall ?

Side Body Wall of Coach

Condition of Stock Material earlier

Today- The same Area

Every employee has a personal Locker

Every employee has a personal Locker

Earlier condition of Central Ward

during heavy Rains

How was it done ?

•Dream Big.•Strong desire for a change.•Belief that this is my workshop•Don’t look up or down for guidance. If guidance was available, things wouldn’t be the way they are today.•Be the traveler & the guide.•Initially people will say, Pagal ho gaya hai., Railway me kuch bhi change nahi hota hai. ,Stores ke liye to koi bhi taiyar nahi hoga.

•Your strong belief permeates up & down and laterally to all the departments.•Everyone will want to become a part of the change•Even civil & electrical contractors want to walk the extra mile for a perfect job done.•Supervise each tile laid, each false ceiling fitted, each cable installed, position of fans-----Everything.

The modus Operandi• Prepare the Civil & Electrical estimate

yourself. These departments are too busy & have no time.

• Civil Work.• Flooring- Big Tiles, small tiles, PVC flooring

or plain Cement Concrete• Brickwork: Sqm• Paneling: MDF or sunmica on plywood ?• False Ceiling: Brown or white ?• Convert brown to white.

• Revenue budget of Civil & Electrical is many time the plan Budget.

• Get the same utilized for your Office & Warehouses.

• Convince the CAO-Con. In HQ or Sr.DEn of Division

• Use variations in available contracts.• Use the zonal contracts.• Issue material to civil & use it back in your depot

like 19 mm plywood, Sunmica, Plastic Emulsion White, fevicol, Araldite, PVC.

• Use old wooden almirahs for framing of doors & other structures

Electrical• Get revenue indents generated for your

requirements like fans, switchboards, MCB, Power Panels, Cables , light fittings ---All this of your choice and make.

• Procure through Sr.DMM or Depot Officer.• Get a wiring contract operated on quotation

basis upto Rs 4 lakhs. The amount is more than enough for a building of 1000 Sqm.

• Supervise , guide the contractor while fitting the accessories, location of each item. Help the contractor in any way possible.