CHATSWORTH HIGH SCHOOL

LOCN SNAM TASK_NAME

8583 CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD

1858301 CHATSWORTH HS Chatsworth HS - Baseball Netting

8583CHATSWORTH SH (B LETTER) SHADE FAB/PADDING/BLEACHERS (B LTR)

8583 CHATSWORTH SH (JOC) BASEBALL NETTING (JOC)

8583CHATSWORTH SH (M&O WORK) RPR/REN ADMIN/PE BLDGS RR-POT (M&O)

• NO DETAILED DESCRIPTION• NO SPACE IDENTIFICATION• NEED FIELD CLARIFICATION• NEED PROJECT COST

LOCN SNAM TASK_NAME

8583 CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD

NO NEW BUILDINGSAT SOFTBALL FIELDSINCE INITIAL SURVEY

LOCN SNAM TASK_NAME

1858301 CHATSWORTH HS Chatsworth HS - Baseball Netting

8583 CHATSWORTH SH (JOC) BASEBALL NETTING (JOC)

NETTING IS NOT CAPTURED, WHAT ABOUT STEEL POSTS?

LOCN SNAM TASK_NAME

8583 CHATSWORTH SH (B LETTER)SHADE FAB/PADDING/BLEACHERS (B LTR)

SHOULD THESE COMPONENTS BE SURVEYED?

WE’RE ASSUMING THIS IS A RESTROOM RENOVATION WITHIN THE ADMINISTRATION AND PE BUILDING.

ASSUMING “POT” MEANS PATH OF TRAVEL, WHAT ADDITIONAL INFORMATION WILL BE NEEDED TO BE VALIDATED?

ADA FIXTURE VALIDATION.

LOCN SNAM TASK_NAME

8583 CHATSWORTH SH (M&O WORK)RPR/REN ADMIN/PE BLDGS RR-POT (M&O)

THERE ARE 12 RESTROOMS IN BOTH THE ADMINISTRATION AND PE BUILDING

24016ADMINISTRATION 1 116203TOILET

24016ADMINISTRATION 1 115221TOILET

24016ADMINISTRATION 1 115137TOILET

24016ADMINISTRATION 1 116653TOILET

24016ADMINISTRATION 1 116650TOILET

23677PHYSICAL EDUCATION 1 116043TOILET

23677PHYSICAL EDUCATION 1 115883TOILET

23677PHYSICAL EDUCATION 1 113930TOILET

23677PHYSICAL EDUCATION 1 114037TOILET

23677PHYSICAL EDUCATION 1 113541TOILET

23677PHYSICAL EDUCATION 1 113540TOILET

23677PHYSICAL EDUCATION 1 112524TOILET

• LIGHT FIXTURE COMPONENT HAS BEEN MODIFED FROM ORIGINAL SURVEY.• FREQUENCY FOR GLUE UP CEILING TILE IS NOW 6. SHOULD THE RSL BE UPDATED GLOBALLY?

SAME AS 1 OF 12

SAME AS 1 OF 12

• NEW SINK - RSL NEEDS TO BE UPDATED FROM 10 TO 30.• NEW TOILET - COMPONENT NEEDS TO BE CHANGED FROM 22369 TO 22895, WITH AN RSL OF 30.

• NEW SINK, TOILET, FLOOR COVERING, AND PAINT.• UPDATE RSL FOR THE GLUE UP CEILING TILE TO 0.

• NEW CERAMIC WALL TILE, CERAMIC FLOOR TILE, TOILETS, URINALS, SINKS, PARTITIONS, AND HAND DRYER.• TWO T-12 FIXTURES HAVE BEEN REPLACED WITH THREE T-8 FIXTURES.

• NEW PAINT ON THE WALLS.• NO URINAL COMPONET IN CURRENT DATA.

• UPDATE CERAMIC WALL TILE RSL FROM 5 TO 35.• UPDATE CERAMIC FLOOR TILE RSL FROM 10 TO 30.• 2 MISSING 3.5 WATER CLOSET COMPONENTS IN CURRENT DATA.

• UPDATE CERAMIC WALL TILE RSL FROM 5 TO 25.• UPDATE CERAMIC FLOOR TILE RSL FROM 20 TO 35.• UPDATE URINAL RSL FROM 2 TO 8.• UPDATE INTERIOR DOORS FROM 5 TO 20.

DRY TOILET TRAPS TYPICAL WITHIN CLOSED BATHROOM

NO SIGNIFICANT CHANGES

NO SIGNIFICANT CHANGES

• NEW CERAMIC WALL TILE, CERAMIC FLOOR TILE, TOILETS, SINKS, PARTITIONS, LIGHTING FIXTURES, AND HAND DRYER.

NEW LOCKER ROOMCOMPONENTS

NEW SOLAR PANELS

NEW DRINKING FOUNTAINS

NEW ROOF COVERING OVER ADMINISTRATION BUILDING

NEW COACH’S OFFICE

WHY AREN’T OTHER PROJECTS ON THE LIST?

SHOULD THESES OTHER PROJECTS BE VALIDATED?

WHAT ARE OUR TIME CONSTRAINTS?WHAT PROCESS IS REQUIRED TO ADD

NEW BUILDINGS? REDLINE SURVEYS FOR ALL CRAFTS

SERVICE CALLS A SINGLE BARD UNIT CAN BE REPLACED WITH

A SERVICE CALL. UNITS COST BETWEEN $9,500 TO $13,000.

INSTALLED COSTS CAN BE $28,000 OR MORE. SERVICE CALLS ARE UP TO 100 HOURS.

UNIT CHANGE- OUTS REQUIRE HVAC, CARPENTRY, ELECTRIC, WELDING, ETC.

TO DATE 24 HOURS OF TIME HAS BEEN SPENT VALIDATING THESE 5 PROJECTS.

UPDATES HAVE YET TO BE MADE TO THE DATA WITH WHAT HAS BEEN FOUND.

IN ADDITION TO THE GIVEN PROJECTS LIST, WE NEED A COMPONENT REPORT OF THE ORIGINAL SURVEY SORTED BY BUILDING AND SPACE.