City CouncilFebruary 5, 2013

River Improvements ProjectFebruary 5, 2013

River Improvements Project

River Improvements Project• Construction Manager at Risk: Templeton Construction, Inc.• Time Summary

• Contract Date: October 1, 2011• Completion Date: August 2013

• Budget Summary• Project Budget = $9,899,321.79• Total Change Orders to date = $599,321.79• Billed to Date (Gross) = $7,918,778.91• Retainage Held to Date (3%) = $234,122.70• Billed to Date (Less Retainage) = $7,684,656.21• % Complete = 78%

River Improvements Project• Funding Sources: Half-Cent Sales Taxes and nearly

$2,000,000 in grants including 2 from Texas Parks and Wildlife, San Angelo Health Foundation, Texas Commission on Environmental Quality and National Endowment for the Arts.

• Improvements to Include: stabilization of the banks from Oakes Street upriver to the vicinity of Sulphur Draw, additional trails and trail improvements, new lighting, an outdoor exercise area, public art, shaded sitting areas, water features and other special elements.

• Work outside of contract includes trail section on SAHF property and some existing trail renovation.

• Note: dredging of the river occurred in 2009 from Sulphur Draw upriver to 14th Street at a cost of about $1,500,000.

River Improvements Project• Bank stabilization complete, including extended area.

May do additional stabilization below Visitors’ Center.• Most initial art installed (less sculpture panels).• Work continues at Irving Street and Games area.• Landscaping discussion with City Council.• High pedestrian bridge update.

River Improvements Project

Bank stabilization below Central High School

River Improvements Project

Bank stabilization just down river from Pecos Bridge

River Improvements Project

Bank stabilization between Pecos and Beauregard Bridges

River Improvements Project

Bank stabilization down river from Beauregard Bridge

River Improvements Project

Bank stabilization, before and after

River Improvements Project

High pedestrian bridge, refurbishment to follow

River Improvements Project

Public space between high pedestrian bridge and South Abe

River Improvements Project

Public space between high pedestrian bridge and South Abe

River Improvements Project

Small “amphitheater” area east of South Abe

River Improvements Project

Mosaic panel below South Abe

River Improvements Project

Bank stabilization below “Kids’ Kingdom” Park

River Improvements Project

Curbing and pavestone work at Meza Fountain

River Improvements Project

Area to be considered for additional stabilization

River Improvements Project

Mosaic cars below Koenigheim

River Improvements Project

Exercise Area below Koenigheim

River Improvements Project

LED lights below Koenigheim

River Improvements Project

Ramp east of Koenigheim

River Improvements Project

Columns with openings for limestone panels and lights at Irving

River Improvements Project

Trail crossing at Irving

River Improvements Project

River crossing at Irving Ramp to new trail on SAHF property

River Improvements Project

Stonework at Irving

River Improvements Project

Columns, stonework and trail light at games area

River Improvements Project

Fossils in stone at columns

River Improvements Project

Restrooms at games area near Irving

River Improvements Project

Refurbished fountain at games area

River Improvements Project

Art work below Chadbourne

River Improvements Project

Trail lights below Neff’s area

River Improvements Project

Main fountain testing

River Improvements Project

Shade structures near main fountain

River Improvements Project

Mosaic panel west of Oakes

River Improvements Project

Pumping station west of Oakes

River Improvements Project

Refurbished fountain west of Oakes

River Improvements Project

Interpretive area below Oakes

River Improvements Project

Interpretive area below Oakes

River Improvements Project

River Improvements Project

River Improvements Project

River Improvements Project

River Improvements Project