Ganson Building & Civil Engineering is one of Ireland’s most progressive building and civil engineering companies. We undertake projects throughout Ireland and the UK with offices in Dublin and Castlewellan and are a leading contractor in all sectors of Public and Private works.
With over 15 years experience, Ganson Building & Civil Engineering have built up significant resources and expertise with a current workload in excess of €80 million. Our primary activity is undertaking large, complex projects in commercial, retail, tourism, high-tech and institutional buildings, refurbishment and civil engineering works.
In addition to technical and plant resources, Ganson Building & Civil Engineering has a strong financial base, allowing execution of multiple large projects simultaneously. The company’s success over the years is based on sound financial and management principles. The company prides itself on having a 100% credit ratings which is unprecedented in the construction industry.
Ganson Building & Civil Engineering offers a full range of construction services including management contracting, design & build & partnerships in addition to traditional building arrangements. The range of work undertaken varies in type and size from multimillion Euro contracts up to €30 million to small and medium sized projects.
Ganson Building & Civil Engineering is fully committed to providing a quality service – completing projects to the highest standards, on time and within budget. The Company is certified to ISO 9001:2008 and to ISO 14001: 2004 standards.
The Company is also dedicated to maintaining a safe working environment for all employees and significant resources are deployed to ensure best practice in the areas of Health & Safety. In 2012 the Company was awarded Safe-T-Cert accreditation, recognised by the International Register of Certificated Auditors (IRCA).
COMPANY OVERVIEW
Regional Office:Ganson UK Ltd,Claremont Avenue,Castlewellan,BT31 9BX,
Tel: 048 437 71022E-Mail: info@gansonuk.co.uk
Bankers:Bank of Ireland,Drogheda,Co Louth.
Tel: 041 983 7653Contact: Eoghan Farrelly
Accountants:Francis J Woods & Company Limited,Balbriggan Business Campus, Balbriggan, Co. Dublin
Tel: 01 691 3500Contact: Eugene O’Callaghan
Solicitors:Keaveny Walsh & Co.Headfort Place,Kells, Co. Meath.
Tel: 046 924 0004Contact: Michael Keaveny
Solicitors:A & L Goodbody,North Wall Quay, Dublin 1, Ireland
Tel: 01 649 2000 Contact: Kevin Feeney
Insurance:Martin Insurance Brokers;Railway RoadCavan
Tel: 049 433 2944Contact: James Martin
COMPANY INFORMATIONHead Office:Unit 19 + 20,
Balbriggan Business Park,Balbriggan,Co Dublin.
Tel: 01 690 5716E-Mail: info@ganson.ieCompany Reg: 371334
VAT No: 6391334 S
Scoi l Mhuire, Lucan, Co. Dubl in
Client: Department of Education and Science
Architect: Henry J Lyons
Contract Sum: €3.4 Million
Contract Period: Jun 12’ – Nov 13’
Description:Construction of 16 classroom extension and sports hall and refurbishment of 8 classroom existing school. The existing school was live for the duration of the works and to facilitate this, the project was carried out in three phases.
Education
Education
Dundalk Grammer School
Client: Department of Education and Science
Architect: TODD Architects
Contract Sum: €6.8 million
Contract Period: November 2011 – May 2013
Description:Demolition of existing single and two storey buildings within the school site and the construction of a new two storey 25 classroom school building, multi purpose hall with associated car parking and landscaping.
Education
Holy Rosary National School, Tal laght, Co.Dubl in
Client: Holy Rosary National School, Tallaght, Co. Dublin
Architect: Mallon Architects
Contract Sum: €3.7 Million
Contract Period: April 2012 – July 2013
Description:Construction of a new two storey school building comprising 24 classroom school plus General Purpose Hall , special needs units, staff rooms and ancillary accommodation of 7562 sq m. External works included adjustments to and enlargement of the existing car park adjacent to the existing Church at Old Court Avenue to provide an additional 21 car parking spaces
Blanchardstown West Educate Together National School
Client: Department of Education & Science
Architect: TODD Architects
Contract Sum: €6.1 Million
Contract Period: April 2013 - August 2014
Description:Construction of a new 24 Primary School on a greenfield site in Hansfield, Dublin 15. The school is 4500m2 in size and caters for approximately 600 pupils.
The school building encompassed a 24 Classrooms school. Administrative Offices, Library, General Purpose Room, Special Needs Unit, Plant Rooms, Lift, Sanitary Facilities and all ancillary areas. The external works include 3 play areas; ball courts traffic circulation areas and associated developments such as car parking areas, sensory garden, primary SNU play area, soft landscaping, fencing and boundary treatments.
Education
Education
Dundalk Inst i tute of Technology
Client: Dundalk Institue of Technology
Architect: McGahon Architects
Contract Sum: €1.2 Million
Contract Period: July 2007 – September 2007
Description:Construction of 5 new science rooms and offices at Dundlak IT. This work included all mechanical and electrical works, demoltion and refurbishment of existing kitchen area and building and provision of new. All of the work was carried out in a live environment. Installation of 2. all weather playing pitches and associated builders work.
Education
Loreto Dalkey
Client: Loreto Abbey Dalkey
Architect: Quinn Barnwell Buggy Architects
Contract Sum: €2.3 Million
Contract Period: Dec 2013 - Feb 2015
Description:Construction of New Sports Hall Building at Loreto Abbey Secondary.
Commercial
Casement Aerodrome, Baldonnel l , Co. Dubl in
Client: Department of Defence
Architect: RPS Ltd
Contract Sum: €1.2 million
Contract Period: September 12’ – May 13’
Description:Construction of 1550m2 aircraft hangar, at Casement Aerodrome. The building is a steel portal framed building to accommodate aircraft, offices, storage, administration, and associated areas.
Commercial
Expert Retai l , Tul lamore, Co. Offaly
Client: Expert Retail
Architect: Doherty Finnegan Kelly
Contract Sum: €2.1 million
Contract Period: Oct 2008 - July 2009
Description:This project consists of the demolition of an existing Warehouse and the construction of a new 2,528m² retail store including a mezzanine level. The works consisted of a shell and core building and then the complete fit out package as a turn key operation.
Commercial
McCloskeys Bakery
Client: McCloskey’s Bakery
Architect: Emmet Finnegan
Contract Sum: €350,000
Contract Period: Sept 2012 – Dec 2012
Description:Fit out of unit 3 at McCloskeys bakery and alteration work to existing unit 2. Works included all Mechanical and Electrical Works. External works included the installation of new drainage system, site lighting and yard slab.
Commercial
AIBP Gui ldford, Surrey
Client: AIBP Meats
Architect: Mitchell Evans LLP, Anchor House,Station Row, Shalford, Guildford,Surrey, GU4 8BY
Contract Sum: £200,000.00
Contract Period: June 2010 – Sept 2010
Description:Construction of a new waste water building on existing treatment facility. Works included the installation of a 5 metre sump chamber and associated drainage, raft slab foundation, steel frame and cladding. Installation of water treatment equipment to newly constructed building.
Commercial
Maxol Fi l l ing Stat ion
Client: Seamus Kane
Contract Sum: €1.9 Million
Contract Period: September 2009 - November 2009
Description:This project involved the construction of Maxol’s. The works included demolition, excavation works, external site works and new surface finishes. The project also included the installation of three new 40,000 litre underground fuel tanks, underground fuel lines, 8 fuelling dispensers and a new forecourt canopy structure. The works were completed within an extremely stringent 13 week construction programme, the works were also completed within the client’s budget.
Talbot Lodge Nursing Home, Malahide, Co. Dubl in
Client: Kinsealy Property Limited Extention
Architect: Kevin Brady Architects
Contract Sum: €2.6m
Contract Period: Aug 13’ – Aug 14’
Description:Construction of eight single storey extensions at the existing Talbot Lodge Nursing Home. This included a new main entrance area, small cafe for residents and visitors, additional day/dining rooms, activity area, 32 bedroom extensions, bathrooms and additional staff facilities. The new bedrooms are all single rooms with en-suite bathrooms. The existing dining room was divided up internally to provide a link corridor to improve the fire escape route from the existing kitchen area.
Healthcare
Healthcare
Stamul len, Neuro Rehab
Client: Redwood Neurobehavioural Services Limited
Architect: Kevin Brady Architects
Contract Sum: €2.6m
Contract Period: Aug 13’ – Aug 14’
Description:New build construction of a Neuro-Rehabilitation centre comprising of a 19 bedroom acquired brain injury residential care unit, 4 no 7 bedroom residential care units, resource centre, training complex, auditorium with shop & café.
Church of Immaculate Conception,Termonfeckin
Client: Father Aiden Murphy and the Parish Committee, Church of Immaculate Conception, Termonfeckin, Drogheda
Architect: Doherty Finnegan Kelly Consulting Engineers
Contract Sum: €400,000
Contract Period: June 11’ – August 11’
Description:Renovations and upgrade of Mechanical and Electrical services of The Church of immaculate Conception which was built in 1883 to the Designs of William Hague, a prolific designer of churches, who designed or altered up to 50 Roman Catholic churches. The church at Termonfeckin was built at a time that Hauge was architect to Armagh Cathedral. The Church is a protected structure.
Restorat ion& Conservat ion
Poor Clares Monastery, Simmonscourt, Co. Dubl in
Client: Mother Abbess the Poor Clare Monastery
Architect: Paul O’Daly & Associates
Contract Sum: €300,000
Contract Period: Oct 2013 – Nov 2013
Description:Refurbishment of Monastery
Restorat ion& Conservat ion
37 Grafton Street, Co.Dubl in
Client: Aviva Insurance
Architect: Fitzgerald Kavanagh & Partners
Contract Sum: €595,000.00
Contract Period: April ’11 – Aug ‘12
Description:Refurbishment of a 4 storey office building at 37 Grafton Street. The project involved demolition and strip out works internally to allow for a full upgrade internally including new M&E upgrade, joinery, repointing and roof works.
Restorat ion& Conservat ion
110 Grafton Street, Co.Dubl in
Client: Aviva Investors
Architect: Fitzgerald Kavanagh Partners
Contract Sum: €220,000
Contract Period: Oct 2011 – Jan 2012
Description:The project consists of the refurbishment of the existing 110 Grafton Street. This existing building was a 4 storey office building requiring extensive renovation throughout.
Restorat ion& Conservat ion
Corpus Christ i Church, Griff i th Avenue
Client: Church of Corpas Christi
Architect: Downes Meehan Robson
Contract Sum: €300,000
Contract Period: June 2011 – July 2012
Description:Refurbishment of Church
Restorat ion& Conservat ion
Restorat ion& Conservat ion
Dundalk Grammer School
Client: Department of Education and Science
Architect: TODD Architects
Contract Sum: €6.8 million
Contract Period: November 2011 – May 2013
Description:Demolition of existing single and two storey buildings within the school site and the construction of a new two storey 25 classroom school building, multi purpose hall with associated car parking and landscaping.
Phi l ipstown CommunityCentre
Client: Philipstown Community Centre
Architect: Denis Williams
Contract Sum: €1 Million
Contract Period: Feb 13’ – Aug 13’
Description:Construction of a New Community Centre, Inc 2 dressing rooms, Sports Hall, Meeting rooms
Leisure& Social
Seapoint Golf Club Termonfeckin Co Louth
Client: Termonfeckin Ltd
Architect: Brendan G Cashell
Contract Sum: €3.0 million
Contract Period: Mar 11’ – Mar 12’
Description:Demolition and refurbishment of existing club house and construction of new clubhouse bar and restaurant. New changing rooms, offices, toilet blocks and pro shop.
Leisure& Social
Louth GAA Centre of Excel lence
Client: Louth GAA
Architect: Denis Williams
Contract Sum: €4 million Contract Period: February 2008 – September 2010
Description:Development of new Centre of Excellence at Darver, Co.Louth comprising of 5 floodlit grass playing pitches, 1 floodlit artificial surface pitch and 2 storey clubroom building incorporating 18000 sq. ft of changing rooms, conference facilities and administration offices on a 35 acre site.
Leisure& Social
Skerr ies Harps GAA Clubhouse
Client: Skerries Harps
Architect: Mark Kelly Architects
Contract Sum: €1.1 Million Contract Period: March 2014 – January 2015
Description:Demolition of the existing clubhouse at Skerries Harps GAC and construction of a new 2 storey clubhouse with a gross floor area of 800m2. The new facility includes 4no changing rooms with showers, toilets, entrance foyer, club shop, bar, external balcony area with glass balustrades and 3no meeting rooms. The works included new Mechanical, Electrical and Lift installation works. External works included the installation of new utility services to the building, bitmac surfacing to car parking area and entrance, fencing, new floodlighting system to the main pitch and training pitch and all associated drainage and landscaping works.
Leisure& Social
Rathbourne Apartments, Ashtown, Dubl in 15
Client: Mazars Ireland
Architect: O’Mahony Pike
Contract Sum: €4.3 million
Contract Period: Sept 13’ – Oct 14’
Description:Completion of 60 apartments consisting of fit-out and remedial works to existing structure, completion of basement Carpark, external landscaping , roads and footpaths.
Resident ial
Valhal la Sheltered Housing Development, Clondalkin Dubl in
Client: South Dublin County Council/ Clanmill Housing Association
Architect: South Dublin County Council
Contract Sum: €1.8m
Contract Period: September 2011 – October 2012
Description:Construction of a Sheltered Housing Development for Clanmill Housing Association to provide fully accessible living accommodation for up to 24 persons with varying levels physical disability. The building embraces environmental responsibility and sustainable technology with the aim of achieving a carbon neutral building.
Resident ial
Mil l Lane, Mountrath,Co. Laois
Client: Customeade Developments Ltd
Architect: John Madden and Associates
Contract Sum: €3.5 Million
Contract Period: January ’06 – May ‘07
Description:16 Number house residential project in Mountrath, Co. Laois.Detached three bedroom semi-detached and four bedroomdetached houses in a private development with highspecification finishes throughout.
Resident ial
Cherry Orchard Day Care Faci l i ty
Client: Andy Burton
Architect: Burdon Craig Dunne Henry Architects
Contract Sum: €1.9 Million
Contract Period: Sept 2008 – November 2009
Description:Construction of new single storey 1500m2 creche facility in Croftwood Crescent in Dublin 12. The building and grounds engage with the large public open space left at the heart of Cherry Orchard, which has been masterplanned by Dublin City Council.
Chi ldcare
Whitehal l Creche, Swords Road, Drumcondra, Dubl in 9
Client: City of Dublin VEC
Architect: Ann Blackwell Associates
Contract Sum: €600,000
Contract Period: June 2010 – February 2011
Description:Construction of a single storey New Creche facility in the grounds of Whitehall college.
Chi ldcare
Accenture Off ice Fit-Out
Client: Accenture Grand Canal Plaza 6th Floor Level
Architect: Colman Stack - Rogerson and Reddan
Contract Sum: €120,000
Contract Period: Feb 2010 – Apr 2010
Description:Complete fit-out of office
Fit-out
McCloskeys Bakery
Food
Client: McCloskey’s Bakery
Architect: Emmet Finnegan
Contract Sum: €350,000
Contract Period: Sept 2012 – Dec 2012
Description:Fit out of unit 3 at McCloskeys bakery and alteration work to existing unit 2. Works included all Mechanical and Electrical Works. External works included the installation of new drainage system, site lighting and yard slab.
Food
AIBP Gui ldford, Surrey
Client: AIBP Meats
Architect: Mitchell Evans LLP, Anchor House,Station Row, Shalford, Guildford,Surrey, GU4 8BY
Contract Sum: £200,000.00
Contract Period: June 2010 – Sept 2010
Description:Construction of a new waste water building on existing treatment facility. Works included the installation of a 5 metre sump chamber and associated drainage, raft slab foundation, steel frame and cladding. Installation of water treatment equipment to newly constructed building.
Industr ial Units, Tul lamore, Co Offaly
Client: Seamus Kane
Architect: Kenny Lyons Architects
Contract Sum: €3 Million
Contract Period: August 2010 – June 2011
Description:Construction of 4 commercial units and the fit out of the Flat bread factory, which included all plant and equipment.
Industr ial