Abstract

• CSULA spends over $300,000 per month on electric bill

• CSULA’s is consider as schedule A-3 under LADWP’s electric rates

Goal:

User friendly interface, Online

Meter # Location kWh

Meter # 1 Parking Lot B 20

Meter # 2 Parking Lot C 20

Meter # 3 Fine Art 25

Meter # 4 King Hall 15

Meter # 5 E & T Building 10

Total 90

Equipments

Energy Consumption

Interval, hr Load, KW

12 AM - 4 AM 200

5 AM - 6 AM 500

6 AM - 9 AM 1000

9 AM -12 PM 1100

12 PM - 4 PM 1000

4 PM -8PM 800

8 PM - 10 PM 600

10 Pm - 11 PM 400

11 PM - 12 AM 200