Revised Planning Brief for Choi Tak Estate and Choi Fook Estate (previously known as Choi Wan Road Sites 2, 3A and 3B)
Project Name: Choi Tak Estate and Choi Fook Estate (previously known as Choi Wan Road Sites 2, 3A and 2B)
with inclusion of Choi Fook Estate Phase 3 (Choi Wing Road Site)
Development Parameters
Approved Development Parameters
(KDPC Paper No. 03/2006)
Current HKPSG Standard
Current Proposal
Provision in Accordance
with HKPSG
Remarks
Development Phases
Choi Tak
Estate (Site 2 &
3A)
(A)
Choi Fook
Estate (Site 3B)
(B)
Total
(A)+(B)
Choi Tak Estate
(C)
Choi Fook Estate
Phs 1 & 2
(D)
Choi Fook Estate Ph 3
(Proposed Choi Wing Road Site)
(E)
Total (C)+(D)+(E)
1. Site Particulars District Location Kwun Tong Site Location Ngau Tau Kok
Existing Land Use PRH - PRH Temporary
Carpark under STT
- - STT no. KX 2892
Existing OZP Zoning R(A) - R(A) R(A)2 - - Based on draft OZP No. S/K13/28 Site Area (ha)
Gross Site Area:
4.56
2.38
6.94 -
5.18
(4.84 Note 1 plus 0.34)
4.14
2.31 Note 1
0.68
8.17
-
Additional 0.34ha in Choi Tak Estate is due to the inclusion of slope area in the north-eastern side as well as slope and footbridge area on the south-western side of Choi Hing Road HOS project (Plan 3). Note 1: The gross site areas have been updated according to the approved building plans.
Net Site Area:
-
-
-
-
2.15
0.68
6.97
-
2
Project Name: Choi Tak Estate and Choi Fook Estate (previously known as Choi Wan Road Sites 2, 3A and 2B)
with inclusion of Choi Fook Estate Phase 3 (Choi Wing Road Site)
Development Parameters
Approved Development Parameters
(KDPC Paper No. 03/2006)
Current HKPSG Standard
Current Proposal
Provision in Accordance
with HKPSG
Remarks
Development Phases
Choi Tak
Estate (Site 2 &
3A)
(A)
Choi Fook
Estate (Site 3B)
(B)
Total
(A)+(B)
Choi Tak Estate
(C)
Choi Fook Estate
Phs 1 & 2
(D)
Choi Fook Estate Ph 3
(Proposed Choi Wing Road Site)
(E)
Total (C)+(D)+(E)
2. Planning Parameters Existing Land Use PRH
Proposed No. of Flats 5,840 3,750 9,590 -
5,840
3,750
1,073 (incl. 148
1/2p flats)
10,663 - A ± 10% deviation is allowed subject to detailed design and further review. The existing flat nos. are as follows: - Choi Tak Estate:
5,752 flats incl.1,122 1/2p flats - Choi Fook Estate Phs 1 & 2:
3,439 flats incl. 694 1/2p flats
Design Population 14,700 9,600 24,300 - 14,700
9,600
2,563 26,863 - As at December 2014, the authorized population in Choi Tak Estate and Choi Fook Estate (Phs 1 & 2) are 14,078 and 8,854 respectively.
Maximum GFA (m2) Domestic
Non-domestic Total
Not specified Not specified Not specified
- -
310,500
- 372,600
161,250
- 193,500
51,000
- 61,200
522,750
- 627,300
-
-
3
Project Name: Choi Tak Estate and Choi Fook Estate (previously known as Choi Wan Road Sites 2, 3A and 2B)
with inclusion of Choi Fook Estate Phase 3 (Choi Wing Road Site)
Development Parameters
Approved Development Parameters
(KDPC Paper No. 03/2006)
Current HKPSG Standard
Current Proposal
Provision in Accordance
with HKPSG
Remarks
Development Phases
Choi Tak
Estate (Site 2 &
3A)
(A)
Choi Fook
Estate (Site 3B)
(B)
Total
(A)+(B)
Choi Tak Estate
(C)
Choi Fook Estate
Phs 1 & 2
(D)
Choi Fook Estate Ph 3
(Proposed Choi Wing Road Site)
(E)
Total (C)+(D)+(E)
Maximum Plot Ratio Domestic
Non-domestic Total
up to 7.5 up to 1.5
Not specified
- - -
7.5 -
9.0
7.5 -
9.0
7.5 -
9.0
7.5 -
9.0
- - -
As stipulated on the OZP.
Maximum Building Height (BH) in mPD
Not exceeding 185mPD
-
170mPD
or existing BH,
whichever is the
greater
170mPD
or existing BH,
whichever is the
greater
190mPD Note 2
-
-
As stipulated on the OZP. The existing BH of Choi Tak Estate and Choi Fook Estate (Phs 1 & 2) range from 136mPD to 175mPD. Note 2: Subject to TPB’s approval on the minor relaxation of building height restriction (BHR) of Choi Fook Estate Ph 3 from 170mPD to190mPD.
4
Project Name: Choi Tak Estate and Choi Fook Estate (previously known as Choi Wan Road Sites 2, 3A and 2B)
with inclusion of Choi Fook Estate Phase 3 (Choi Wing Road Site)
Development Parameters
Approved Development Parameters
(KDPC Paper No. 03/2006)
Current HKPSG Standard
Current Proposal
Provision in Accordance
with HKPSG
Remarks
Development Phases
Choi Tak
Estate (Site 2 &
3A)
(A)
Choi Fook
Estate (Site 3B)
(B)
Total
(A)+(B)
Choi Tak Estate
(C)
Choi Fook Estate
Phs 1 & 2
(D)
Choi Fook Estate Ph 3
(Proposed Choi Wing Road Site)
(E)
Total (C)+(D)+(E)
3. Planning Requirements
Education 1
0
1
730 half day and 250 full day places per 1,000 children aged 3 to under 6 Note 3
1
0
0 [2 CR] Note 3
1
-
Note 3: HKPSG requires 26 CRs for every 1,000 children aged 3 to under 6. Assuming 2.47% of total population in the age group 3-5, two CRs are required for Choi Fook Estate Ph 3. The demand is to be met by existing provision in the vicinity.
- No. of Kindergarten [No. of Classrooms (CR)]
Recreational Facilities - Badminton Court
2
1
3
1 per 8000
persons
2
1
0 Note 4
3
3
Note 4: There are badminton courts, basketball courts and table tennis rooms in the sports centre (SC) for public enjoyment.
- Basketball Court
2 1 3 1 per 10,000 persons
2 1 0 Note 4 3 3
- Table Tennis Court
2 1 3 1 per 7,500 persons
2 1 0 Note 4 3 3
5
Project Name: Choi Tak Estate and Choi Fook Estate (previously known as Choi Wan Road Sites 2, 3A and 2B)
with inclusion of Choi Fook Estate Phase 3 (Choi Wing Road Site)
Development Parameters
Approved Development Parameters
(KDPC Paper No. 03/2006)
Current HKPSG Standard
Current Proposal
Provision in Accordance
with HKPSG
Remarks
Development Phases
Choi Tak
Estate (Site 2 &
3A)
(A)
Choi Fook
Estate (Site 3B)
(B)
Total
(A)+(B)
Choi Tak Estate
(C)
Choi Fook Estate
Phs 1 & 2
(D)
Choi Fook Estate Ph 3
(Proposed Choi Wing Road Site)
(E)
Total (C)+(D)+(E)
Local Open Space (m2)
14,700 or more
9,600 or more
24,300 or more
1m2 per person
14,700 or more
12,163 or more
26,863 or more
26,863 or more
Sufficient open space will be provided for Choi Fook Estate (Phs 1, 2 & 3). The open space at podium will be easily accessible.
Children Play Area (m2)
1,176
768
1,944
400m2 per 5,000 persons
1,176 or more
973 or more
2,149 or more
2,149 or more
Included in area of open space.
Green Coverage (% of Gross Site Area)
-
-
-
-
Min.20%
Min.20%
-
-
Choi Fook Estate Phs 1, 2 & 3 would be assessed together. HD would try to increase the percentage as far as practicable with 50% of the green coverage provided at grade. A minimum of 3 trees per 100m2 of the total green coverage would be provided.
6
Project Name: Choi Tak Estate and Choi Fook Estate (previously known as Choi Wan Road Sites 2, 3A and 2B)
with inclusion of Choi Fook Estate Phase 3 (Choi Wing Road Site)
Development Parameters
Approved Development Parameters
(KDPC Paper No. 03/2006)
Current HKPSG Standard
Current Proposal
Provision in Accordance
with HKPSG
Remarks
Development Phases
Choi Tak
Estate (Site 2 &
3A)
(A)
Choi Fook
Estate (Site 3B)
(B)
Total
(A)+(B)
Choi Tak Estate
(C)
Choi Fook Estate
Phs 1 & 2
(D)
Choi Fook Estate Ph 3
(Proposed Choi Wing Road Site)
(E)
Total (C)+(D)+(E)
Social Welfare/ Community Facilities
- Integrated Family Services Centre (IFSC) (535m2 NOFA)
0 0 0 1 per 100,000- 150,000 persons
0 0 0 0 0.18-0.27 One in Choi Ying Estate
- District Elderly Community Centre cum Home Care Services
0 1 1 - 0 1 0 1 - -
- Integrated Children and Youth Services Centre
- Neighbourhood Elderly Centre
1
0
0
0
1
0
1 per 12,000
persons in the 6-24
age group -
1
0
0
0
0
0
1
0
0.21 -
- One in Choi Ying Estate
7
Project Name: Choi Tak Estate and Choi Fook Estate (previously known as Choi Wan Road Sites 2, 3A and 2B)
with inclusion of Choi Fook Estate Phase 3 (Choi Wing Road Site)
Development Parameters
Approved Development Parameters
(KDPC Paper No. 03/2006)
Current HKPSG Standard
Current Proposal
Provision in Accordance
with HKPSG
Remarks
Development Phases
Choi Tak
Estate (Site 2 &
3A)
(A)
Choi Fook
Estate (Site 3B)
(B)
Total
(A)+(B)
Choi Tak Estate
(C)
Choi Fook Estate
Phs 1 & 2
(D)
Choi Fook Estate Ph 3
(Proposed Choi Wing Road Site)
(E)
Total (C)+(D)+(E)
Retail and commercial (IFA)
4,100 m2
80-100 m2
4,200 m2
Deter- mined by
HA
4,286 m2
Note 5 81 m2 Note 5 About
450m2
(Wet Market)
About 4,817 m2
- Note 5: The areas have been updated according to the approved building plans. Existing provisions for Choi Tak Estate and Choi Fook Estate are 4,286 m2 (shopping centre) and 81 m2 (convenience store and DC member’s office) respectively.
Sports Centre - - - - - 1
- The OZP stipulates the provision of an Indoor Recreation Centre, which is subsequently renamed to Sports Centre.
Parking Requirements - Private Car Parking
(for PRH)
211
(1 per 20 flats exclud- ing 1/2p flats)
137
(1 per 20 flats exclud-
ing 1/2p flats)
348
1 per
26-39 flats excluding 1/2p flats
198
115
0
(HKPSG Requirement: 24 nos. at 1 per 39 flats
excluding 1/2p flats)
313
213-319
Parking requirement for Choi Fook Estate Ph 3 (24 nos.) is to be addressed by existing provisions (313 nos.) in carparks of Choi Tak Estate and Choi Fook Estate which encountered low average letting rates.
8
Project Name: Choi Tak Estate and Choi Fook Estate (previously known as Choi Wan Road Sites 2, 3A and 2B)
with inclusion of Choi Fook Estate Phase 3 (Choi Wing Road Site)
Development Parameters
Approved Development Parameters
(KDPC Paper No. 03/2006)
Current HKPSG Standard
Current Proposal
Provision in Accordance
with HKPSG
Remarks
Development Phases
Choi Tak
Estate (Site 2 &
3A)
(A)
Choi Fook
Estate (Site 3B)
(B)
Total
(A)+(B)
Choi Tak Estate
(C)
Choi Fook Estate
Phs 1 & 2
(D)
Choi Fook Estate Ph 3
(Proposed Choi Wing Road Site)
(E)
Total (C)+(D)+(E)
- Hourly Private Car Parking (retail and commercial)
- Hourly Private Car Parking Space (for Sports Centre)
34 (1 per
200m2
of Com-
mercial
GFA)
0
0
0
34
0
1 per 200-300m2 commercial
GFA -
60
0
11 (14
minus 3 Note 6)
0
0 (not required
for wet market)
2 (1 for office
use and 1 accessible car parking space for the public)
71
2
27-41
0
Note 6: three hourly private car spaces in Choi Fook Carpark will be converted to motorcycle parking for PRH, subject to the Traffic Impact Assessment (TIA) and the conversion. Besides the two parking spaces as stated, according to the TIA, provision of 12 nos. hourly car parking spaces is required for SC users. Having considered the utilization rate of the existing carparks in the Three-Choi Area, the congested site conditions and LCSD’s views, TD has no comment on HD’s proposal of making use of the existing hourly parking spaces therein for addressing the hourly parking
9
Project Name: Choi Tak Estate and Choi Fook Estate (previously known as Choi Wan Road Sites 2, 3A and 2B)
with inclusion of Choi Fook Estate Phase 3 (Choi Wing Road Site)
Development Parameters
Approved Development Parameters
(KDPC Paper No. 03/2006)
Current HKPSG Standard
Current Proposal
Provision in Accordance
with HKPSG
Remarks
Development Phases
Choi Tak
Estate (Site 2 &
3A)
(A)
Choi Fook
Estate (Site 3B)
(B)
Total
(A)+(B)
Choi Tak Estate
(C)
Choi Fook Estate
Phs 1 & 2
(D)
Choi Fook Estate Ph 3
(Proposed Choi Wing Road Site)
(E)
Total (C)+(D)+(E)
demand. - Light Goods
Vehicle (LGV) (for PRH)
- Motorcycle Parking
(for PRH)
23 (1 per
180 flats
exclud-
ing 1/2p
flats)
21 (5-10%
of residen- tial car parking spaces)
15 (1 per
180 flats
exclud-
ing 1/2p
flats)
14 (5-10%
of residen- tial car parking spaces)
38
35
1/200-400 flats
excluding 1/2p flats
1 per 110 flats
excluding 1/2p flats
20
37
18 (15 plus 3
Note 7)
51
(32 plus 19 Note 8)
0 (3 nos.
required at 1 per 400 flats
excluding 1/2p flats)
0 (19 nos
required at 1 per 50 flats
excluding 1/2p flats)
38
88
21-42
75
Note 7: Subject to the TIA, 3 additional LGV parking spaces will be provided in carparks of Choi Tak Estate and Choi Fook Estate. Having considered the congested site conditions of Choi Fook Ph 3, TD has no comments on HD’s proposal of off-site provisioning. Note 8: Having considered the congested site conditions of Choi Fook Ph 3, TD has no comment on HD’s proposal of off-site provisioning. Subject to the TIA and TD’s requirement, 19 additional motorcycle parking spaces at 1 per 50 flats excluding 1/2p flats will be converted from 3 existing hourly car parking spaces in carpark of Choi Fook Estate.
10
Project Name: Choi Tak Estate and Choi Fook Estate (previously known as Choi Wan Road Sites 2, 3A and 2B)
with inclusion of Choi Fook Estate Phase 3 (Choi Wing Road Site)
Development Parameters
Approved Development Parameters
(KDPC Paper No. 03/2006)
Current HKPSG Standard
Current Proposal
Provision in Accordance
with HKPSG
Remarks
Development Phases
Choi Tak
Estate (Site 2 &
3A)
(A)
Choi Fook
Estate (Site 3B)
(B)
Total
(A)+(B)
Choi Tak Estate
(C)
Choi Fook Estate
Phs 1 & 2
(D)
Choi Fook Estate Ph 3
(Proposed Choi Wing Road Site)
(E)
Total (C)+(D)+(E)
- Loading/Unloading (PRH)
- Loading/Unloading (non-domestic)
8
9
4
0
12
9
1 per
domestic block
Wet market
required: 1 per
20-30 large stalls and 1 per 40-60
small stalls,
subject to min. of 2
bays
8
9
4
0
1
4Note 9
13
13
13
-
- Note 9: Loading/Unloading facilities are:
- 1 bay for Sports Centre in accordance with LCSD’s Schedule of Accommodation;
- 2 bays for wet market; and
- 1 bay for refuse collection vehicle.
11
Project Name: Choi Tak Estate and Choi Fook Estate (previously known as Choi Wan Road Sites 2, 3A and 2B)
with inclusion of Choi Fook Estate Phase 3 (Choi Wing Road Site)
Development Parameters
Approved Development Parameters
(KDPC Paper No. 03/2006)
Current HKPSG Standard
Current Proposal
Provision in Accordance
with HKPSG
Remarks
Development Phases
Choi Tak
Estate (Site 2 &
3A)
(A)
Choi Fook
Estate (Site 3B)
(B)
Total
(A)+(B)
Choi Tak Estate
(C)
Choi Fook Estate
Phs 1 & 2
(D)
Choi Fook Estate Ph 3
(Proposed Choi Wing Road Site)
(E)
Total (C)+(D)+(E)
- Requirement of
Bus/GMB lay-by Lay-bys on public road
outside Estates - Lay-bys on public road
outside Estates A new lay-by on Choi Wing Road adjacent to the Site Note
10
- - Note 10: A new lay-by for two taxis will be provided on the east of the Site. Besides, the existing bus layby on the north of the Site will be modified to accommodate an additional minibus stop for two minibuses.
4. Technical Considerations/Constraints Environmental
- Noise No insurmountable problem is envisaged. Based on the preliminary findings of the Environmental Assessment Study (EAS).
- Air No insurmountable problem is envisaged.
- Pedestrian Wind Environment
No insurmountable problem is envisaged. Microclimate Study will be conducted at the detailed design stage
12
Project Name: Choi Tak Estate and Choi Fook Estate (previously known as Choi Wan Road Sites 2, 3A and 2B)
with inclusion of Choi Fook Estate Phase 3 (Choi Wing Road Site)
Development Parameters
Approved Development Parameters
(KDPC Paper No. 03/2006)
Current HKPSG Standard
Current Proposal
Provision in Accordance
with HKPSG
Remarks
Development Phases
Choi Tak
Estate (Site 2 &
3A)
(A)
Choi Fook
Estate (Site 3B)
(B)
Total
(A)+(B)
Choi Tak Estate
(C)
Choi Fook Estate
Phs 1 & 2
(D)
Choi Fook Estate Ph 3
(Proposed Choi Wing Road Site)
(E)
Total (C)+(D)+(E)
Infrastructure
- Drainage and Sewerage
No insurmountable problem is envisaged. A Sewerage Impact Assessment would be submitted to EPD for approval.
- Water Supply No insurmountable problem is envisaged.
-
- Electricity, Telephone, Gas
No insurmountable problem is envisaged. -
Urban design, visual and landscape
Design of the PRH cum SC development at Choi Fook Estate Phase 3 will take into account the surrounding built environment to minimize its visual intrusion. To assess the impact of the new development on the air ventilation performance in the surroundings, HD will conduct an initial study of Air Ventilation Assessment (AVA) in accordance with HPLB/ETWB Technical Circular No. 1/06. The AVA will be included in the s.16 application for minor relaxation of BHR. Proper mitigation measures would be incorporated in the scheme design, if required.
Visual Impact Assessment (VIA) will be conducted to support the s.16 application for minor relaxation of BHR from 170mPD to 190mPD. An Air Ventilation Assessment (AVA) in accordance with HPLB/ETWB Technical Circular No. 1/06 will be conducted.
13
Project Name: Choi Tak Estate and Choi Fook Estate (previously known as Choi Wan Road Sites 2, 3A and 2B)
with inclusion of Choi Fook Estate Phase 3 (Choi Wing Road Site)
Development Parameters
Approved Development Parameters
(KDPC Paper No. 03/2006)
Current HKPSG Standard
Current Proposal
Provision in Accordance
with HKPSG
Remarks
Development Phases
Choi Tak
Estate (Site 2 &
3A)
(A)
Choi Fook
Estate (Site 3B)
(B)
Total
(A)+(B)
Choi Tak Estate
(C)
Choi Fook Estate
Phs 1 & 2
(D)
Choi Fook Estate Ph 3
(Proposed Choi Wing Road Site)
(E)
Total (C)+(D)+(E)
5. Development Programme − Piling & Building
Commencement Date
- Completed Completed 12/2016 - Subject to review
− Piling & Building Completion Date
- Completed Completed 7/2020 - Subject to review
6. Attachments 6.1 Location Plan (Plan 1) 6.2 Development Concept Plan of Choi Fook Estate Phase 3 (Plan 2) 6.3 Revision on the Development Boundary (Plan 3)
14
Notes
1. NET SITE AREA (NSA): In accordance with the Hong Kong Planning Standards and Guideline (HKPSG), the NSA should exclude:
(a) district and public open space, public recreation facilities, free-standing schools and community facilities (including those on the podium), open-air public transport terminal /
interchange;
(b) internal roads; and
(c) natural vegetated slopes and man-made slopes (for the latter, except slopes regraded to form developable area).
2. NUMBER OF FLAT AND DESIGN POPULATION: To allow flexibility in the design ±10% adjustment will be allowed for the number of flats and design population together with
corresponding adjustment to ancillary facilities in line with HKPSG or the requirement of client department. If a project remains within the 10% allowance, no revision to PB and
no-submission to DipCon is necessary subject to no adverse comments from client department on the corresponding adjustments to ancillary facilities.
3. GROSS FLOOR AREA (GFA): Covered public transport terminal/interchanges should be accountable for GFA calculation.
4. PLOT RATIO (PR): PR should be calculated on the basis of net site area.
5. MAXIMUM GFA, PR AND NUMBER OF STOREYS OR BUILDING HEIGHT: OZP restrictions have to be specified under the Remarks column. The maximum GFA, PR and No. of
storeys or building height for the current proposal should be based on the optimal development intensities of the site with reference to relevant planning studies or proposal by PlanD, or HD,
with justifications instead of blanket adoption of the maximum development restrictions stipulated in the OZP.
6. MAXIMUN NUMBER OF STOREYS OR BULIDING HEIGHT in mPD: Should there be variations in height limits across the site, the different maximum heights in mPD at main roof
level or number of storeys permitted should be indicated on a plan.
7. PLANNING REQUIRMENTS: The District Planning Officer will check compliance with the HKPSG where appropriate.
8. SOCIAL WEFARE AND COMMUNITY FACILITES: District and territorial welfare/community facilities are determined by client departments (SWD, HAD, etc) and any site area
involved in free standing facilities should be excluded from site area and GFA calculation.
9. RETAIL AND COMMERCIAL FACILITIES: HD will determine the amount of retail floor space required in the development.
10. PEDESTRAIN WIND ENVIRONMENT: HPLB / ETWB Technical Circular on Air Ventilation Assessments to be referred, if appropriate.
11. DEPARTMENTAL COMMENTS: Following circulation, a summary of comments with response should be included in the appendix for submission of the draft planning brief for
endorsement by DipCon.