portfolio_hyunjong choi
TRANSCRIPT
PORTFOLIO
☞ HYUNJONG CHOI
☞ Suite #1304 - 5 Northtown Way,
North York, ON, M2N 7A1
☞ (647)866-7370
“Action is the foundational key to all success.”
- Pablo Picasso
TABLE OF CONTENTS
1. INTRODUCTION AND GOALS
2. RESUME
3. EDUCATION
4. WORK EXPERIENCE
5. CERTIFICATIONS
6. REFERENCES2 of 23
1. INRODUCTION AND GOALS
INTRODUCTION
I am glad to introduce by myself. My name is Hyunjong Choi who is enrolled in the Building Renova-
tion Technician Program at George Brown College in Toronto.
I am currently learning skills involved in the building construction, such as how to use various tools,
how to build efficiently. I also have good communications and teamwork skills through several group
projects; wall framing, roof framing, stairs, ceiling, and so on.
I intend to graduate April 2017. For practicing what I have learned at college, I have been working
at a construction site of Habitat for Humanity GTA as a volunteer since October 2016.
GOALS
1. Successfully graduating from college with good grades.
2. Continually self-develop skills.
3. By working with strong sense of responsibility, contributing to company success.
4. Taking construction managements program to achieve higher position in company.
5. Building my house by myself in the future.
3 of 23
2. RESUME
CAREER OBJECTIVE
To attain a position as responsible employee to utilize my skills and abilities in the field of Construc-
tion that offers professional growth while being active, creative, and innovative.
EDUCATION
Building Renovation Technician 2016 -
Present George Brown College Toronto, ON
Bachelor of Science 2001 -
2009 Chungbuk National University Chungbuk, Republic of Korea College of Natural Science Major : Earth and Environmental Sci-ence
WORK EXPERIENCE
Volunteer 2016 -
Present Habitat for Humanity GTA Scarborough, ON
Assistant Manager of Project Management 2012 –
2015 KTI Engineering & Construction Co., Ltd. Seoul, Republic of Korea
4 of 23
3. EDUCATION
Building Renovation Technician (T110) – George Brown College (for 2 years 2016 – 2017)
• Interior Millwork & Finishes
• Residential Building Renovation & Restore
• ICI Renovation & Restoration
• Associated Trades
Weeks Shops01 - 07 Hand Tools / Joinery & Trim / Kitchen Cabinet
09 - 15 Stairs Calculations & Assembly
Weeks Shops01 - 07 Wood Foundation / Walls / Ceiling / Sidings
09 - 15 Roofs / Shingles / Dormer
Weeks Shops01 - 07 Steel Frames / Drywalls / Mudding / Ceiling
09 - 15 Concrete Frameworks / Leveling
Weeks Shops01 - 07 Electrical / Plumbing
09 - 15 Masonry / HVAC5 of 23
3. EDUCATION
Interior Millwork & Finishes
◀ Trim
•Some tips for using hand tools
•Properly cutting and installing small-scaled mould-
ings
•Fundament construction rules
Kitchen Cabinet ▶
• Starting with basic furniture
• How to use power tools
• Layout cabinet
6 of 23
3. EDUCATION
Interior Millwork & Finishes
◀ Stairs Calculations & Assembly
•Interpreting layout of stairs
•Calculation of rise, run, tread, and
handrails
•Open and closing stringers
•Stair codes
•Assemble the stairs
7 of 23
3. EDUCATION
Residential Building Renovation & Restore
◀ Wood Foundation / Walls / Ceiling / Sidings
•Layouts for foundation, wall fames, and doors
•Assemble of walls and joists
•Calculation of door and wall sizes
Roofs / Shingles / Dormer ▶
• Layouts for roof rafters, shingles, and trusses
• Calculation of rafters, trusses, and dormers
• Equal roof framing
• Making dormers
• Theory of OBC (Ontario Building Codes)8 of 23
3. EDUCATION
ICI Renovation & Restoration
◀ Steel Frames / Drywalls / Mudding / Ceiling
•Unequal slope roof
•Steel framing
•Drywall
9 of 23
3. EDUCATION
ICI Renovation & Restoration
◀ Steel Frames / Drywalls / Mudding / Ceiling
•Openings (Door / Window / Skylight / Arch opening)
•Bulkhead with steel material
•Mud coating
•Ceiling layout & framing
10 of 23
3. EDUCATION
ICI Renovation & Restoration
Concrete Frameworks
▶
•Layout foundations & footings
•Label & square
•Concrete forms for footings, stairs, and flat-
form
11 of 23
4. WORK EXPERIENCE
Block A
Habitat for Humanity GTA Volunteer - Build Site
•Location : 140 Pinery Trail, Scarborough, ON
•3 three-stories buildings for total fifty residential
units
- Block A (3 stories / 15 units)
- Block B (3 stories / 15 units)
- Block C (3 stories / 20 units)
•On December 2016, it is currently under construc-
tion
since August as phase 1. 12 of 23
4. WORK EXPERIENCE
•Education for safety
•Floor joists on 1st floor
•Installation particle wall frames
•Fastening door frames
•Installation insulations between basement & 1st floor
13 of 23
4. WORK EXPERIENCE
•Teamwork : Moving LVL beams on place
•Cutting & installation LVL beams prop-
erly
14 of 23
4. WORK EXPERIENCE•Production of simple tables, benches, & shelves
•Assemble scaffoldings
15 of 23
4. WORK EXPERIENCE
•Using variety power tools for cutting & fastening LVL beams;
reciprocating saws, nailing guns, & pneumatic staple guns
• Layout LVL beams & floor joists for 2nd floor
• Working at height safely
• Installation guardrails on 2nd floor
16 of 23
4. WORK EXPERIENCE
KTI Engineering & Construction Co., Ltd. - Head office
•Location : Gangnam, Seoul, South Korea
•Tel : +82-2-574-8886
•Homepage : http://www.ktienc.co.kr
•Position : Assistant Manager
•Department : Overseas Business Division
•Employment Period : 2012 - 2015 (for 3 years)
•Responsibilities
- Project management : 12 projects in the world
- Analyzing daily, weekly, & monthly reports of
sites
- Management of progress payment
- Management of manpower for projects
- Purchase and delivery of materials
- Quality & environment management system
(ISO 9001 & 14001) 17 of 23
4. WORK EXPERIENCE
• Projects in charge
Ain Arnat 1200MW CCPP Project
•Country : Algeria
•Owner : CEEG. Spa
•Period : Jul. 2013 ~ Feb. 2016
•Work Scope : Equip’ Installation & Piping Work
•Value (US$) : 11,489,624
A’seeb Sewage Treatment Plant Project-OCU Installation
• Country : Oman
•Owner : Haya Water
•Period : Nov. 2011 ~ Feb. 2013
•Work Scope : Equip’ Installation & Piping Work
•Value (US$) : 5,867,000
18 of 23
4. WORK EXPERIENCE
• Projects in charge
New Haripur Power Plant Development Project
• Country : Bangladesh
•Owner : EGCB
•Period : Oct. 2011 ~ Jul. 2013
•Work Scope : Equip’ Installation & Piping Work
•Value (US$) : 6,793,326
Habshan-5 Utility & Offsites Project
• Country : UAE
•Owner : GASCO
•Period : May. 2010 ~ Sep. 2012
•Work Scope : Steel Structure, Equip’ Installation &
Piping Work
• Value (US$) : 14,259,89919 of 23
5. CERTIFICATIONS
•Working at Heights
- Theory & Fundamentals of Fall Prevention
•Driver License (G)
•Carpentry Certification (will be updated soon)
20 of 23
5. CERTIFICATIONS
•Employment Certificate of KTI E&C
•Graduation Certificate of Chungbuk National Univer-
sity
•Microsoft Office Specialist Master
21 of 23
6. REFERENCES
Study plan
2016 Winter 2016 Spring 2016 Fall 2017 Winter
Architectural Plan Interpretation I
Residential Building Renovation &Restoration
ICI Renovation & Restoration Associated Trades
Applied Theory & ApplicationBuilding Science &
EnvironmentInterior Millwork &
FinishesMethods of
Measure
Site Management & Construction
Safety
Architectural Plan Interpretation II
DeconstructionMethods
Estimating
ConstructionLayout & Rigging
Math for BuildingTechnologies 2 Portfolio
Professional Communication
for BuildingTechnologies
22 of 23
THANK YOU