curriculum vitae of the ldm group › wp-content › uploads › 2018 › 10 › ldm-company … ·...
Post on 26-Jun-2020
2 Views
Preview:
TRANSCRIPT
CURRICULUM VITAE OF THE LDM GROUP
Report Number: 14
Date of Preparation: 18 September 2018
Date of Issue: 18 September 2018
Reference: Curriculum Vitae
CURRICULUM VITAE OF THE LDM GROUP
DOCUMENT CONTROL SHEET
DOCUMENT REFERENCE
DISTRIBUTION AND COMMUNICATION
QUALITY CONTROL
QUERIES AND COMMENTS
All queries and comments in respect of this document must be addressed in writing to:
LDM Group
21 West Riding Row,
Sherwood,
Durban
4091
Telephone: +27 31 207 1340
Facsimile: +27 31 209 9441
E- Mail: trevor@LDM.co.za
For the attention of: Trevor Munian
REVISION NO. DESCRIPTION DATE OF PREPARATION (DD/MM/YYYY)
Rev.14 CURRICULUM VITAE OF THE LDM GROUP 18 SEPTEMBER 2018
NAME ORGANISATION DATE OF ISSUE (DD/MM/YYYY)
LDM HOLDINGS (PTY) LTD (TRADING AS LDM GROUP) 18 SEPTEMBER 2018
PREPARED BY: DESIGNATION SIGNATURE DATE (DD/MM/YYYY)
Seena Dhanraj Project Administrator
18 SEPTEMBER 2018
APPROVED FOR ISSUE BY: DESIGNATION SIGNATURE DATE (DD/MM/YYYY)
Trevor Munian Director 18 SEPTEMBER 2018
Page | 0
CURRICULUM VITAE OF THE LDM GROUP
INDEX
1. INTRODUCTION TO THE LDM GROUP ............................................................................................. 2
2. OUR SOUTH AFRICAN OFFICES ..................................................................................................... 2
3. OUR NOTABLE PROJECTS ............................................................................................................ 3
4. OUR MAJOR CLIENTS................................................................................................................. 3
5. RESOURCE CAPACITY (PERMANENT STAFF) ...................................................................................... 4
6. CORPORATE SOCIAL RESPONSIBILITY AND EMPOWERMENT .................................................................. 4
7. FINANCIAL HISTORY .................................................................................................................. 5
8. EXPERTISE WITHIN LDM ............................................................................................................ 6
9. WHERE TO FIND US .................................................................................................................. 8
10. OUR PROJECT EXPERIENCE ........................................................................................................ 10
ANNEXURE A – LDM GROUP BROCHURE
ANNEXURE B – ISO 9001 : 2015 ACCREDITATION CERTIFICATE
Page | 0
CURRICULUM VITAE OF THE LDM GROUP
1. INTRODUCTION TO THE LDM GROUP
The LDM Group is a Leading Built Environment Service Provider that focuses on TURNKEY BUILT ENVIRONMENT PROJECT DELIVERY SERVICES, which includes,Project Management, Quantity Surveying, Programme Management, EPCM Services, Town Planning, Urban Design, Built Environment Consulting Services, Valuation Services, Energy Management, Facilities Management, Property Services, Capacity Development and Training, IT Solutions, Public Private Partnerships Construction, Disaster Management , Infrastructure Master Plan, Architecture, Space Planning, Green Building and Sustainability, Property Valuations, Engineering Services, Management Consulting, Infrastructure Cost Management, Legal Services, Tenant Fit-Out, Transaction Advisory Services, Move Management, Occupational Health & Safety Management, Energy Management, Construction Auditing And Due Diligence, Etc. The Group aims to provide a ONE STOP SHOP, where clients are able to contract with a single entity for delivery on projects, thereby minimizing its risk exposure.
The company was established in Durban in 1984 and has grown organically to emerge as one of the leading consultancy firms in South Africa with offices in most major centres of the country and with strategic associations internationally.
LDM has the support of a large team of highly qualified and experienced professionals of diverse talents and considerable levels of management skills which we believe is the fundamental criteria for the successful delivery of every commission that they undertake.
Their approach to every project is simple - they take responsibility for its success. At every stage, the services that they offer will be directed exclusively and impartially towards achieving that goal.
LDM commits itself to work in partnership with the Clients from the outset to assess the scope of the project, address the risk, establish clear objectives and implement the strategy for achieving the defined objectives. They undertake to provide all the human and technical resources deemed essential to execute the commission through to a successful completion.
The Corporate Brochure of the LDM Group is in included in Annexure A.
LDM Group is committed to: 1. The definition and implementation of project objectives. 2. The adherence to targeted milestone dates. 3. The compliance with and continuing management of project deliverables. 4. The achievement of pre-determined quality assurance standards. 5. A philosophy of adding value through efficient planning and management.
Further information may be obtained by viewing the website: WWW.LDM.CO.ZA
2. OUR SOUTH AFRICAN OFFICES Cape Town Durban Johannesburg Pietermaritzburg Port Elizabeth Pretoria
Page | 2
CURRICULUM VITAE OF THE LDM GROUP
3. OUR NOTABLE PROJECTS
E-TV Studios Santam Offices Gautrain Rapid Rail Project King Shaka International Airport Durban SARS Siyakha Transformation Programme Sandton Convention Centre Nedcor Offices Sandton Investec Bank Offices Cape Town Monte Casino Gauteng Palazzo Hotel Sandton International Convention Centre Durban Cape Town International Convention Centre Old Mutual Head Office Gauteng BP Head Office Cape Town Gateway Shopping Centre Durban O.R. Tambo International Airport Pier Project Cape Town International Airport 2010 Upgrade SAA Offices O.R.Tambo and Cape Town International Airport Transnet Freight Rail Offices Nationally Moses Mabhida Stadium Durban Sibaya Casino Durban One & Only Hotel Cape Town
4. OUR MAJOR CLIENTS
Airports Company South Africa (ACSA) Anglo American Development Anglo Platinum Mines (AMPLATS) BOE Properties City of Cape Town City of Durban Colliers RMS Coega Development Corporation Crowie Projects Deloitte Department of Education, South Africa Department of Foreign Affairs, South
Africa Department of Public Works, South Africa Department of Transport, KwaZulu-Natal Development Bank of Southern Africa East Coast Radio Elgin Group Gauteng Gaming Board Industrial Development Corporation Intersite Property Management Investec Properties Johannesburg Metro Council KPMG Inc.
Liberty Life Properties Madisson Property Fund Metropolitan Life Nedcor (Pty) Ltd Old Mutual Properties One & Only Hotel Group OTEO Capital PQ Data Africa Passenger Rail Agency of South Africa
(PRASA) PricewaterhouseCoopers Redefine Properties SA Reit South African Petroleum Refineries
(SAPREF) South African Maritime Safety Authority
(SAMSA) South African Reserve Bank South African Revenue Service Southern Sun Hotel Interests Sun International South Africa Tourism KwaZulu-Natal Transnet World Bank
Page | 3
CURRICULUM VITAE OF THE LDM GROUP
5. RESOURCE CAPACITY (PERMANENT STAFF)
RESOURCE TYPE QUANTUM
Directors 15
Project Managers 12
Quantity Surveyors, Procurement Specialists & Contract Administrators 39
Facilities Managers 7
Construction Managers 2
Project Administrators 12
Finance Administrators 7
Training Consultants & Advisors 2
Support Staff & Trainees 16
TOTAL: 112
6. CORPORATE SOCIAL RESPONSIBILITY AND EMPOWERMENT
BLACK ECONOMIC EMPOWERMENT – LDM HOLDINGS (PTY) LTD
BBBEE STATUS LEVEL 1
BLACK EQUITY OWNERSHIP 100%
WOMAN EQUITY OWNERSHIP 10%
BLACK MANAGEMENT PARTICIPATION 100%
SKILLS DEVELOPMENT
The LDM Group Spends approximately 1% of its Payroll Annually on Skills Development of which approximately 90% is spent on Training Black Staff.
PROCUREMENT
The LDM Group affects approximately 90% of its Procurement Spend on Black Owned Businesses.
AWARDS
The LDM Group was placed first in the National Department of Public Works Roster of Service Providers, which rates and assesses Service Providers, primarily on Black Economic Empowerment.
Page | 4
CURRICULUM VITAE OF THE LDM GROUP
7. FINANCIAL HISTORY
The average annual turnover for the last three years is as follows:
2015 – R139 Million
2016 – R129 Million
2017 – R127 Million
Page | 5
CURRICULUM VITAE OF THE LDM GROUP
8. EXPERTISE WITHIN LDM
• Project and Programme Management • Construction Project Management • Project Leadership (Lead Consultancy) • Management of Consultant Team • Construction Management • Time Management
• Property Development • Legal and Financial Framework
Structuring • Risk Management • Value Engineering and Management • Human Resource Management • Due Diligence Investigations • Tourism Development and Planning • Strategic Planning • Public Private Partnerships and
Transaction Advisory Services • SMME Development • Mentoring
• Affirmative Procurement and Empowerment
• Infrastructure Procurement Assistance and Advice
• Procurement Policy Formulation • Supply and Logistics Management • BBBEE – Procurement • Procurement Objectives to Comply with
BBBEE Charters
• Property Development and Management • Property Valuations • Property Management and Facilities
Planning • Property Development • Legal and Financial Framework
Structuring
• Building Construction • Tenant Fit-Outs • Civil Engineering Construction
• Cost Planning • Preparation of Cost Estimates • Preparation of Feasibility Studies • Preparation of Tender Documentation • Contract Administration & Management • Preparation of Final Statement of
Accounts • Management / Negotiation of Variation/ Change Orders
• Facilities Management • Property Management and Facilities
Planning • Integration of multi-disciplinary activities Within the built environment • Management of buildings and services • Workspace design and implementation • Property Management and Facilities
Planning • Computerized Facilities Management
Systems
• Measurement of Key Performance Indicators
• Technical and Functional Deliverables • Empowerment and Socio-Economic
Objectives • Immovable Asset Management • Forensic Auditing • Due Diligence Assessment • Insurance Valuation Assessment
Construction
Page | 6
CURRICULUM VITAE OF LDM GROUP
• Cost Engineering • Process engineering Cost Control Services • Valuations of Plant and Equipment • Development Engineering and Management • Value Engineering
• Property Development Services • Property Finance and Management • Financial Risk Management • Financial Viability Studies • Property Lease and Tenant Negotiations
Page | 7
CURRICULUM VITAE OF LDM GROUP
9. WHERE TO FIND US
Cape Town: 2ND Floor, 25 Hope Street Cape Town 8001 Tel: (+27 21) 465 3294 Fax: (+27 21) 462 1619 E-mail: cpt@ldm.co.za
Durban: 21 West Riding Row Sherwood Durban 4091 Tel: (+27 31) 207 1340 Fax: (+27 31) 209 9441 E-mail: dbn@ldm.co.za
Johannesburg: Suite 13, 1ST Floor, Katherine & West 114 West Street Sandown 2196 Tel: (+27 11) 442 0754 Fax: (+27 11) 442 0759 E-mail: gp@ldm.co.za
Port Elizabeth: 120 Villiers Road Walmer Port Elizabeth 6070 Tel: (+27 41) 581 0547 Fax: (+27 41) 581 0328 E-mail: pe@ldm.co.za
Pretoria: 239 Lange Street Nieuw Muckleneuk Pretoria 0181 Tel: (+27 12) 346 8676 Fax: (+27 12) 346 7095 E-mail: pta@ldm.co.za
Pietermaritzburg: 410 Jabu Ndlovu Street Pietermaritzburg 3201 Tel: (+27 33) 342 6586 Fax: (+27 33) 342 6588 E-mail: pmb@ldm.co.za
Page | 8
CURRICULUM VITAE OF LDM GROUP
10. OUR PROJECT EXPERIENCE
EXPERIENCE IN PROVIDING PROJECT MANAGEMENT SERVICES (INCLUDES DESIGN MANAGEMENT, PROCUREMENT MANAGEMENT, FINANCIAL MANAGEMENT AND COST CONTROL, PROGRAM MANAGEMENT, TIME MANAGEMENT, QUALITY MANAGEMENT, CONSTRUCTION MONITORING, PROFESSIONAL TEAM MANAGEMENT, ETC.)
Employer / Employer’s Representative Details Description of Work Value of Project (Including
V.A.T) Project Period & Status
Employer: Ethekwini Municipality – Transport Authority Employer’s Representative: Thami Manyathi Contact No.: +27 82 081 0153
eThekwini Integrated Rapid Public Network Project R10 Billion On-going 2013 - 2018
Employer: Ethekwini Municipality – Housing Unit Employer’s Representative: John Devine Contact No.: +27 31 322 7022
Cornubia Integrated Housing Project R750 Million 36 Months – completed 2016
Employer: Transnet Freight Rail Employer’s Representative: John Basson Contact No.: +27 83 283 0508
Transnet Freight Rail Office Upgrade Program
R200 Million (R750 Million – Entire
Portfolio)
24 Months – Current Project (On-Going)
Employer: Oxygen Infrastructure Solutions Employer’s Representative: Simphiwe Shazi Contact No.: + 27 82 854 8638
Austerville: Refurbishment of Existing Apartments and Construction of New Units
- Phase 2
R 115 Million Current - Phase 2 – Construction Stage
Employer: COEGA Development Corporation Employer’s Representative: Nolundi Keti Contact No.: +27 31 584 1760
New & Upgrade of Existing Schools R 35 Million Various – Currently in
Procurement Stage
Employer: K2S Consulting on behalf of the IDT Employer’s Representative: Nkululeko Mchunu Contact No.: +27 31 765 1165
IDT Storm Disaster Program – 29 Schools R 35 Million Various – completed 2014
Employer: Oxygen Infrastructure Solutions Employer’s Representative: Simphiwe Shazi Contact No.: + 27 82 854 8638
Austerville: Refurbishment of Existing Apartments and Construction of New Units
– Phase 1
R 15 Million Phase 1 A completed 2013,
and Phase 1 B in Construction Stage
Page | 10
CURRICULUM VITAE OF LDM GROUP
Employer / Employer’s Representative Details Description of Work Value of Project (Including
V.A.T) Project Period & Status
Employer: Singatha Afrika Management Services (Pty) Ltd Employer’s Representative: Unathi Hoyana Contact No.: +27 83 799 8891
PRASA: National Station Improvement Programme:
Phase 2 Alterations and Additions to 10 No. Various Railway
Stations in KZN
R 25 Million Completed 2009
Employer: Oxygen Infrastructure Solutions Employer’s Representative: Simphiwe Shazi Contact No.: + 27 82 854 8638
Mariannridge Housing Project - Refurbishment
of 226 Units R 40 Million 24 Months –
Completed 2012
Employer Singatha Afrika Management Services (Pty) Ltd Employer’s Representative: Unathi Hoyana Contact No.: +27 83 799 8891
PRASA: National Station Improvement Programme:
Phase 1 Alterations and Additions to 10 No. Various Railway
Stations in KZN
R 18 Million Completed 2008
Employer: PRASA Crescent Employer’s Representative: Nathi Mbili Contact No.: +27 71 603 9224
PRASA – NSIP Phase 6 R 24 Million Completed 2013
Employer: Singatha Afrika Management Services (Pty) Ltd Employer’s Representative: Unathi Hoyana Contact No.: +27 83 799 8891
PRASA: National Station Improvement Programme: Phase 4 Alterations and
Additions to 7 No. Various Railway Stations in KZN
R 10 Million Completed 2010
Employer: Transnet Pipelines Employer’s Representative: Dumisile Mthalane Contact No.: +27 83 571 6603
Transnet Bundwalls & Manifold upgrade Magdala
& Kroonstad R 600 000.00 Completed 2016
Employer: University of Kwazulu - Natal Employer’s Representative: Logan Vandayer Contact No.: +27 84 526 2393
UKZN Howard College Refurbishment R1 Million Completed February 2014
Employer: Oxygen Infrastructure Solutions Employer’s Representative: Simphiwe Shazi Contact No.: + 27 82 854 8638
Marrianridge Housing Project – Construction of
500 New Units R 136 Million Current
Page | 11
CURRICULUM VITAE OF LDM GROUP
Employer / Employer’s Representative Details Description of Work Value of Project (Including
V.A.T) Project Period & Status
Employer: Oxygen Infrastructure Solutions Employer’s Representative: Simphiwe Shazi Contact No.: + 27 82 854 8638
Shallcross Housing Project – Refurbishment of
Existing Units 87 Million Current 2018
Employer: University of Kwazulu-Natal Employer’s Representative: Logan Vandeyar Contact No.: +27 31 260 1833
Refurbishment to the social space area at MTB
Howard College Campus
R 400 000.00 Completed in 2013
Employer: University of Kwazulu-Natal Employer’s Representative: Logan Vandeyar Contact No.: +27 31 260 1833
Refurbishment to the social space area at Dennis
Shepstone
Howard College Campus
R 400 000.00 Completed in 2013
Employer: University of Kwazulu-Natal Employer’s Representative: Logan Vandeyar Contact No.: +27 31 260 1833
Installation of new aluminium windows and
doors at chemical engineering building
Howard College Campus
R 350 000.00 Completed in 2013
Employer: University of Kwazulu-Natal Employer’s Representative: Logan Vandeyar Contact No.: +27 31 260 1833
Refurbishment of MTB Ablutions
Howard College Campus
R 1 Million (Estimated Budget) Completed 2017
Employer: University of Kwazulu-Natal Employer’s Representative: Logan Vandeyar Contact No.: +27 31 260 1833
Refurbishment of Dennis Shepstone
Howard College Campus
R 1 Million (Estimated Budget) Completed 2017
Employer: University of Kwazulu-Natal Employer’s Representative: Logan Vandeyar Contact No.: +27 31 260 1833
Refurbishment of Campbell House (VC Residence)
Howard College Campus
R 4.7 Million (Estimated Budget) Completed 2016
Employer: University of Kwazulu-Natal Employer’s Representative: Logan Vandeyar Contact No.: +27 31 260 1833
Re-roofing to QPA & Sports Admin Building
PMB Campus
R 2 Million (Estimated Budget) Completed 2017
Employer: University of Kwazulu-Natal Employer’s Representative: Musa Mfusi Contact No.: +27 31 260 2215
Refurbishment of M.H.Joosub Hall
Westville Campus
R 4.6 Million Completed in 2014
Page | 12
CURRICULUM VITAE OF LDM GROUP
Employer / Employer’s Representative Details Description of Work Value of Project (Including
V.A.T) Project Period & Status
Employer: University of Kwazulu-Natal Employer’s Representative: Stanley Govender Contact No.: +27 82 338 8897
New Sports Filed Lighting
Edgewood Campus
R 2 Million (Estimated Budget) Completed 2017
Employer: University of Kwazulu-Natal Employer’s Representative: Muzi Khumalo Contact No.: +27 31 260 7944
Admin Building Façade Refurbishment
Westville Campus
R 8.5 Million (Estimated Budget) Completed 2016
Employer: University of Kwazulu-Natal Employer’s Representative: Muzi Khumalo Contact No.: +27 31 260 7944
Admin Building HVAC Upgrade
Westville Campus
R 12 Million (Estimated Budget) Completed 2016
Employer: PRASA Crescent Employer’s Representative: Kavesh Singh Contact No.: +27 31 813 0479
PRASA Business Express Lounges – Pietermaritzburg
& Durban R14 Million 12 Months
June 2013 – March 2014
Employer: University of Kwazulu-Natal Employer’s Representative: Muzi Khumalo Contact No.: +27 31 260 7944
RSB Space Allocation
PMB Campus
R 10. Million (Estimated Budget)
Current – Stage 2
Employer: University of Kwazulu-Natal Employer’s Representative: Logan Vandeyar Contact No.: +27 31 260 1833
Refurbishment of 4 No. Sub-Stations
Howard College Campus
R 550 000.00 Completed 2016
Employer: Department of Public Works Employer’s Representative: Samual Jacobs Contact No.: +27 82 458 9449
Storm Damaged Schools Phase 11 R 147 Million 6 Months –
Project Completed 2012
Employer: Department of Public Works Employer’s Representative: Samual Jacobs Contact No.: +27 82 458 9449
Storm Damaged Schools Phase 13 R 236 Million 8 Months –
completed 2015
Employer: Department of Public Works Employer’s Representative: Samual Jacobs Contact No.: +27 82 458 9449
Storm Damaged Schools Phase 13A R 200 Million Completed 2012
Page | 13
CURRICULUM VITAE OF LDM GROUP
Employer / Employer’s Representative Details Description of Work Value of Project (Including
V.A.T) Project Period & Status
Employer: University of Kwazulu-Natal Employer’s Representative: Muzi Khumalo Contact No.: +27 31 260 2215
UKZN – New Civil Engineering Laboratory R 10 Million 22 Months -
completed April 2016
Employer: University of Kwazulu-Natal Employer’s Representative: Muzi Khumalo Contact No.: +27 31 260 2215
Edgewood Campus – New Teaching & Learning
Facilities R 45 Million 18 Months -
completed 2018
Employer: Transnet Pipelines Employer’s Representative: Natasha Pillay Contact No.: +27 84 601 2002
Site Depot Security Upgrades – Mooi River &
Howick R 40 Million Completed 2015
Employer: Department of Human Settlements Employer’s Representative: Walter Ngubane Contact No.: +27 78 801 4401
Krans Kloof Hostels R 15 Million Completed 2015
Employer: PRASA Crescent Employer’s Representative: Nathi Mbili Contact No.: +27 71 603 9224
PRASA – NSIP Phase 5 Upgrade of the following
Stations: Umkomaas, IlFracombe, Havenside, Poets Coner, Seaview, Westcliff, Island View,
Wentworth, Newcastle and Ladysmith
R 26 Million 12 Months – completed 2011
Employer: University of KwaZulu- Natal Employer’s Representative: Mary Tierney Contact No.: +27 82 444 4509
FOHS Projects R 12 Million 5 Months – Project Completed 2012
Employer: Durban University of Technology Employer’s Representative: Len Rosenburg Contact No.: +27 83 777 2900
S Block Construction R 88 Million 24 Months – Project Completed 2010
Employer: Durban University of Technology Employer’s Representative: Len Rosenburg Contact No.: +27 83 777 2900
Roof Refurbishment – City Campus R 30 Million 4 Months – Project
Completed 2010
Employer: Durban University of Technology Employer’s Representative: Len Rosenburg Contact No.: +27 83 777 2900
Bio-Tech R 21 Million 11 Months – Project Completed 2013
Page | 14
CURRICULUM VITAE OF LDM GROUP
Employer / Employer’s Representative Details Description of Work Value of Project (Including
V.A.T) Project Period & Status
Employer: Durban University of Technology Employer’s Representative: Len Rosenburg Contact No.: +27 83 777 2900
New Laboratories and Offices to IWWT Building R 42 Million Completed 2015
Employer: Durban University of Technology Employer’s Representative: Len Rosenburg Contact No.: +27 83 777 2900
Repairs and Renovations to Walsingham Residence R 12 Million January 2015 – August 2015
Employer: University of KwaZulu – Natal (UKZN) Employer’s Representative: Dr Derek Stretch Contact No.: +27 31 260 1064
Construction of New Civil Lab
Project Value – R10 Million Completed 2017
Employer: Vaal University of Technology (VUT) Employer’s Representative: Prof. Piet Swanepoel Contact No.: +27 16 950 9223
New Student Residences –300 Bed
(Principal Agency)
Project Value – R50 Million Current 2018
Employer: Vaal University of Technology (VUT) Employer’s Representative: Prof. Piet Swanepoel Contact No.: +27 16 950 9223
New Student Residences – 400 Bed
(Principal Agency)
Project Value – R60 Million Current 2018
Employer: Johannesburg Development Agency Employer’s Representative: Mr Zwakele Magagula Contact No.: +27 11 688 7857
BRT Bus Depots Project Value – R 554 Million
18 Months – Project Completed 2016
Company Name: Passenger Rail Association of South Africa Company’s Representative: Mr.L.Gantsho Contact No.: +27 11 773 1702 7
Philippi Station Upgrade Project Value – R 94 Million Completed 2018
Page | 15
CURRICULUM VITAE OF LDM GROUP
Employer / Employer’s Representative Details Description of Work Value of Project (Including
V.A.T) Project Period & Status
Employer: Durban University of Technology Employer’s Representative: Len Rosenberg Contact No.: +27 31 373 2836
S Block Upgrade Project Value – R 70 Million Completed 2016
Employer: Transnet Freight Rail Employer’s Representative: John Basson Contact No.: +27 83 283 0508
Transnet 138 Eloff Street Office Upgrade
Project Value – R 90 Million Completed 2016
Employer: Oxygen Infrastructure Solutions Employer’s Representative: Ridwaan Khan Contact No.: + 27 84 701 1443
New Student Residence – 800 Bed
Project Value – R 155 Million Completed 2017
Employer: Transnet Freight Rail Employer’s Representative: John Basson Contact No.: +27 83 283 0508
Transnet Salkor Office Upgrade
Project Value – R 50 Million Completed 2016
Employer: Transnet Freight Rail Employer’s Representative: John Basson Contact No.: +27 83 283 0508
Transnet Isando Office Upgrade
Project Value – R 60 Million Completed 2016
Employer: Durban University of Technology Employer’s Representative: Len Rosenberg Contact No.: +27 31 373 2286
DUT 233 - Repairs and Renovations to Walsingham
Residence
Project Value – R 13 Million Completed 2017
Employer: Durban University of Technology Employer’s Representative: Len Rosenberg Contact No.: +27 31 373 2286
Proposed New Student Residence at the Steve Biko
Campus for the Durban University of Technology
Project Value – R 125 Million Completed 2017
Employer: Durban University of Technology Employer’s Representative: Len Rosenberg Contact No.: +27 31 373 2286
IWWT Building Project Value – R 40 Million Completed 2017
Employer: Durban University of Technology Employer’s Representative: Len Rosenberg Contact No.: +27 31 373 2836
New Drama Facility Project Value – R 25 Million
Current Project
Page | 16
CURRICULUM VITAE OF LDM GROUP
Employer / Employer’s Representative Details Description of Work Value of Project (Including
V.A.T) Project Period & Status
Employer: PRASA Employer’s Representative: Anita Govender Contact No.: + 27 72 437 8418
Moses Mabhida Rail Commuter Station
Project Value – R 140 Million Completed 2010
Employer: University of KwaZulu-Natal Employer’s Representative: Musa Mfusi Contact No.: +27 31 260 2215
Urban Renewal & M.H. Joosub Hall
Project Value – R 5 Million Completed - 2014
Employer: Transnet Freight Rail Employer’s Representative: John Basson Contact No.: +27 83 283 0508
Transnet City Deep Office Upgrade
Project Value – R 30 Million Completed - 2013
Employer: University of KwaZulu-Natal Employer’s Representative: Mary Tierney Contact No.: +27 31 260 7036
New Health Science Facility Project Value – R 8 Million Completed - 2012
Employer: Vaal University of Technology Employer’s Representative: Prof. Piet Swanepoel Contact No.: 016 950 9223
Life & Physical Sciences Building
Project Value – R110 Million Current
Employer: Vaal University of Technology Employer’s Representative: Pinzi Zingitwa Contact No.: +27 16 950 9924
VUT New IT Registration Building
Project Value – R 32 Million Completed - 2012
Employer: Amaru Projects Employer’s Representative: Prakash Doolabh Contact No.: +27 83 414 5075
Empangeni Prison Project Value – R 180 Million
24 Months (Jan 2005 – Dec 2006) – Project Completed
Employer: Amaru Projects Employer’s Representative: Prakash Doolabh Contact No.: +27 83 414 5075
Malmesbury Prison Project Value – R 150 Million
24 Months (Jan 2002 – Dec 2006) – Project Completed
Employer: South African Revenue Service Employer’s Representative: Ingrid Yegappen Contact No.: +27 82 880 3070
SARS Carlton Centre – Level 200
Project Value – R 120 Million
12 Months (May 2005 – April 2006) – Project Complete
Page | 17
CURRICULUM VITAE OF LDM GROUP
Employer / Employer’s Representative Details Description of Work Value of Project (Including
V.A.T) Project Period & Status
Employer: South African Revenue Service Employer’s Representative: Ingrid Yegappen Contact No.: +27 82 880 3070
SARS Albany House Offices Project Value – R 110 Million
12 Months (Jan 2007 – Jan 2008) – Project Completed
Employer: South African Revenue Service Employer’s Representative: Ingrid Yegappen Contact No.: +27 82 880 3070
SARS Megawatt Park Offices
Project Value – R 153 Million
12 Months (May 2005 – April 2006) – Project Completed
Employer: Transnet Freight Rail Employer’s Representative: John Basson Contact No.: +27 83 283 0508
Transnet Ermelo Office Upgrade
Project Value – R17.5 Million Completed Project 2014
Employer: Ibhola Lethu Consortium Employer’s Representative: George Chetty Contact No.: +27 83 626 8837
Moses Mabhida 2010 Stadium
Project Value – R500 Million
(Overall Project R 2.5 Billion)
30 Months – Project Completes 2010
Employer: University of KwaZulu-Natal Employer’s Representative: Mary Tierney Contact No.: +27 31 260 7036
Block J New IT Facility Project Value – R 12 Million Completed 2010
Employer: University of Zululand Employer’s Representative: Mike Smythe Contact No.: +27 82 654 2557
New Richards Bay City Campus Phase 1
Project Value – R 60 Million Project Completed - Dec 2009
Employer: South African Revenue Service Employer’s Representative: Ingrid Yegappen Contact No.: +27 82 880 3070
SARS P166 Enforcement Centre
Project Value – R 150 Million
12 Months (May 2005 – April 2006) – Project Completed
Employer: South African Revenue Service Employer’s Representative: Ingrid Yegappen Contact No.: +27 82 880 3070
SARS Ashlea Gardens Project Value – R 50 Million
12 Months (May 2005 – April 2006) – Project Completed
Page | 18
CURRICULUM VITAE OF LDM GROUP
Employer / Employer’s Representative Details Description of Work Value of Project (Including
V.A.T) Project Period & Status
Employer: South African Revenue Service Employer’s Representative: Ingrid Yegappen Contact No.: +27 82 880 3070
SARS Trescon Building Project Value – R 100 Million
12 Months (May 2005 – April 2006) – Project Completed
Employer: South African Revenue Service Employer’s Representative: Ingrid Yegappen Contact No.: +27 82 880 3070
SARS Alberton Offices Project Value – R 200 Million
12 Months – Project Completed July 2006
Employer: Amaru Projects Employer’s Representative: Prakash Doolabh Contact No.: +27 83 414 5075
Empangeni Prison R 180 Million 24 Months (Jan 2005 – Dec 2006) – Project Completed
Employer: Department of Public Works Employer’s Representative: Mr. Nelson Nair Contact No.: +27 83 252 3623
Bergville & Ncome Prisons Upgrade R 181 Million 36 Months – Completed 2015
Employer: Transnet Pipelines Employer’s Representative: Nathi Ndlovu Contact No.: +27 84 601 2002
Site Depot Security Upgrades – Kroonstad &
Klerksdorp R 10 Million 15 Months (March 2014 – July
2015) – Project Completed
Page | 19
CURRICULUM VITAE OF LDM GROUP
EXPERIENCE IN PROVIDING PROGRAMME MANAGEMENT SERVICES
EMPLOYER / EMPLOYER’S REPRESENTATIVE DETAILS DESCRIPTION OF WORK (SERVICE)
VALUE OF WORK (I.E. THE SERVICE PROVIDED)
INCLUSIVE OF VAT (RAND) DATE COMPLETED
Employer: South African Revenue Service Employer’s Representative: Ingrid Yegappen Contact No.: +27 82 880 3070
SARS Siyakha Programme:
The provision of new and the upgrading of new offices, cash
halls, training centres, etc. throughout South Africa to support SARS programme of improving its work efficiency
Project Value – R 1.6 Billion
36 Month (Jan 2004 – Dec 2006) – Project Completed
Employer: South African Revenue Service Employer’s Representative: Ingrid Yegappen Contact No.: +27 82 880 3070
SARS Border Control Improvement Programme:
The provision of new and the upgrading of existing facilities
at the land ports of entry.
Project Value – R 229 Million
36 Month (Jan 2004 – Dec 2006) – Project Completed
Employer: Focus Project Management Employer’s Representative: Kevin McGill Contact No.: +27 84 580 9678
UKZN Merger Projects:
The provision of new and the upgrading of existing facilities to accommodate the merger
of University of Natal, University of Durban Westville
and Howard College.
Project Value – R 400 Million
24 Month (May 2004 – Apr 2008) – Project Completed
Employer: Department of Public Works Employer’s Representative: Sassa Subban Contact No.: +27 82 447 0925
DPW : Transfer of Mortuaries Project:
The provision of new and the upgrading of existing facilities to transfer mortuaries from
SAPS to the provincial departments of health.
Project Value – R 245 Million
24 Month (Jan 2006 – Dec 2007) – Project Completed
Employer: Amaru Projects Employer’s Representative: Prakash Doolabh Contact No.: +27 83 414 5075
DPW : Expedite of Expenditure For DPW Kwazulu
Natal Regional Office Projects:
The provision of assistance to
the Department of Public Works to fast track
expenditure on various projects.
Project Value – R 100 Million
12 Month (Jan 2006 – Dec 2006) – Project Completed
Employer: Durban University of Technology Employer’s Representative: Morgan Thambiran Contact No.: + 27 31 373 5481
Department of Education Funded Projects
Project Value – R 80 Million
24 Months – Current Project
Employer: Transnet Freight Rail Employer’s Representative: Johan Basson Contact No.: +27 83 283 0508
Transnet Freight Rail Space Planning and Office Upgrade
Programme
Project Value – R 250 Million Completed 2015
Employer: Transnet Freight Rail Employer’s Representative: Johan Basson Contact No.: +27 83 283 0508
Transnet Freight Rail Capital Works Programme
Project Value – R 220 Million Completed 2016
Page | 20
CURRICULUM VITAE OF LDM GROUP
EMPLOYER / EMPLOYER’S REPRESENTATIVE DETAILS DESCRIPTION OF WORK (SERVICE)
VALUE OF WORK (I.E. THE SERVICE PROVIDED)
INCLUSIVE OF VAT (RAND) DATE COMPLETED
Employer: Ethekwini Municipality Employer’s Representative: Thami Manyathi Contact No.: +27 31 311 73158
New Integrated Rapid Public Transport Network (IRPTN)
within the Ethekwini Municipality
Project Value – R 10 Billion 36 Months – 2018
Employer: Department of Public Works Employer’s Representative: Sassa Subban Contact No.: +27 82 447 0925
DPW : Expedite of Expenditure For SAPS
Projects:
The provision of assistance to the Department of Public
Works to fast track expenditure on SAPS projects.
Project Value – R 240 Million
24 Month (Jan 2006 – Dec 2007) – Project Completed
Employer: ABAKALI Employer’s Representative: George Ngwenya Contact No.: +27 31 279 3400
Stations Improvement Programme : Phase 6
Project Value – R 50 Million
5 Months – Completed 2016
Employer: PRASA Employer’s Representative: Nathi Mbili Contact No.: +27 31 305 8765
Stations Improvement Programme: Phase 6
Project Value – R 100 Million
5 Months – Completed 2016
Employer: Department of Public Works Employer’s Representative: Samuel Jacobs Contact No.: + 27 33 555 4000
Repairs and Renovations to Storm Damaged Schools
Throughout the Province of KwaZulu Natal - Phase 13
Project Value – R 400 Million
10 Months - Completed 2015
Employer: Singatha Africa Management Services Employer’s Representative: Unathi Hoyana Contact No.: +27 83 799 8891
Intersite Station Improvement Programme:
The upgrade of various rail station for 2010 and beyond
Project Value – R 100 Million 15 Months - Completed 2009
Employer: Singatha Africa Management Services Employer’s Representative: Unathi Hoyana Contact No.: +27 83 799 8891
Department of Housing Social Amenities Projects:
The provision of social
amenities on various housing developments.
Project Value – R 100 Million 18 Months - Completed 2009
Employer: Department of Public Works Employer’s Representative: Samuel Jacobs Contact No.: + 27 33 555 4000
Repairs and Renovations to Storm Damaged Schools
Throughout the Province of KwaZulu Natal - Phase 11
Project Value – R 200 Million Completed 2013
Page | 21
CURRICULUM VITAE OF LDM GROUP
EXPERIENCE IN PROJECT LEADERSHIP I.E. PRINCIPAL AGENCY (LDM)
Name of Project Project Description
Project Type
Approximate Project Value
Service Provided
Project Location
Project Timescale
Project Status
New Durban Stadium New Durban Stadium
New Stadium Facility R 2.5 Billion
Principal Agency & Construction
Project Management
Durban, Kwazulu - Natal 29 Months Complete -
2010
SARS Alberton Regional Offices
SARS Alberton Regional Offices Offices R 280 Million
Principal Agency & Construction
Project Management
Alberton, Gauteng 12 Months Complete –
2007
University of Zululand, Proposed New Richards Bay
City Campus
New Education Facility
Offices & Lecture Theatres
R 60 Million Lead Consultant Richards Bay, Kwazulu- Natal 11 Months Complete -
2009
SARS Albany House Project (P1 & 2)
Upgrade of Existing Offices Offices R 110 Million
Principle Agency and Construction
Project Management
Durban, Kwazulu - Natal 7 Months Complete -
2007
SARS Megawatt Park Project
Upgrade of Existing Offices Offices R 153 Million
Principle Agency and Construction
Project Management
Sandton, Gauteng 7 Months Complete –
2005
SARS Outlying Offices – Western Cape & Gauteng
Upgrade of Existing Offices
Various Offices R 100 Million
Principle Agency and Construction
Project Management
Western Cape, Gauteng 7 Months Complete –
2005
East London Mail Centre
New East London Mail Centre
Specialist Building R 80 Million
Principle Agency and Construction
Project Management
East London 12 Months Planning Stage
Empangeni Prison New Empangeni Prison
Specialist Building R 180 Million Principle
Agency Empangeni,
Kwazulu - Natal 24 Months Complete - 2006
Malmesbury Prison New Malmesbury Prison
Specialist Building R 150 Million Principle
Agency Malmesbury, Cape Town 24 Months Complete –
2006
New Thokoza Fire station New Fire Station Offices R25 Million Principle
Agency JHB 4 Months Complete – 2014
New Wakkerstroom Clinic New clinic Specialist
Building R9.4 Million Principle Agency JHB TBC Complete –
2014
Ekurhuleni Maintenance Programme
Various Various Hourly Rates as
and when required
Principle Agency JHB 36 Months Complete –
June 2014
Maintenance of Public Transport Facilities
Maintenance of Public Transport
Facilities Various R9.3 Million Principle
Agency JHB 6 Months Complete – 2014
Limpopo Schools New/Upgrade - Schools Various R15 Million Principle
Agency Limpopo TBC Complete – 2014
Sundry Works Sundry Works Various R22 Million Principle Agency Various TBC Complete –
2014
Page | 22
CURRICULUM VITAE OF LDM GROUP
EXPERIENCE IN QUANTITY SURVEYING
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Transnet Capital Projects Employer’s Representative: Rajen Chetty Contact No.:
Eastern Cape Infrastructure Joint
Venture, Port of Ngqura Upgrade
Quantity Surveying R6.3 Billion 60 Months – Current
Employer: Emfuleni Resorts (Pty) Ltd Employer’s Representative: Philip de Wet Contact No.: +27 11 283 1500
Extension to The Boardwalk Quantity Surveying R 1 Billion Completed 2012
Employer: Nedbank Employer’s Representative: K. Reynolds Contact No.: +27 11 294 1649
Extension to the existing Nedbank office
building in Sandton Quantity Surveying R 670 Million Completed 2011
Employer: Airports Company South Africa Employer’s Representative: R. Swanepoel Contact No.: +27 11 944 6127
Extension to the existing offices Quantity Surveying R 343 Million Completed 2010
Employer: Coega Development Corporation Employer’s Representative: Philisa Ndzamela - Qaba Contact No.: +27 41 403 0474
Emergency Repairs and Renovations to
classrooms, construction of
additional ablution facilities, general site works and fencing (13
Schools in Cacadu District Municipality)
Quantity Surveying R 249 Million Current
Employer: First National Bank Employer’s Representative: B. Baker Contact No.: +27 82 446 1550
New FNB Ferndale Contact Centre & IT
Support Building Quantity Surveying R 562 Million Current Project
Employer: Ibhola Lethu Consortium Employer’s Representative: Laura Khwela Contact No.: +27 73 219 7966
Moses Mabhida 2010 Stadium Quantity Surveying
R 500 Million (Overall Project
R 2.5 Billion)
Completed 2010
Page | 23
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Durban University of Technology Employer’s Representative: Len Rosenberg Contact No.: +27 31 204 2286
Various Lecture Venues, Tutorial Buildings,
Offices, etc. Quantity Surveying R 100 Million Completed 2007
Employer: University of Western Cape Employer’s Representative: Jacob Thampi Contact No.: +27 21 959 3399
UWC Life Sciences Building - Construction of New Laboratories, Teaching Facilities,
Offices
Quantity Surveying R 263 Million Completed 2010
Employer: Johannesburg Development Agency Employer’s Representative: Mr Zwakele Magagula Contact No.: +27 11 688 7857
BRT Bus Depots Quantity Surveying R 554 Million
18 Months – December 2013 – December 2016-
Project Completed
Employer: South African Revenue Service Employer’s Representative: Ingrid Yegappen Contact No.: +27 82 880 3070
SARS Alberton Offices Quantity Surveying R 200 Million Completed 2006
Employer: South African Revenue Service Employer’s Representative: Ingrid Yegappen Contact No.: +27 82 880 3070
SARS Albany House Offices Quantity Surveying R 110 Million Completed 2008
Employer: South African Revenue Service Employer’s Representative: Ingrid Yegappen Contact No.: +27 82 880 3070
SARS Megawatt Park Offices Quantity Surveying R 153 Million Completed 2006
Employer: South African Revenue Service Employer’s Representative: Ingrid Yegappen Contact No.: +27 82 880 3070
SARS P166 Enforcement Centre Quantity Surveying R 150 Million Completed 2006
Page | 24
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: South African Revenue Service Employer’s Representative: Ingrid Yegappen Contact No.: +27 82 880 3070
SARS Carlton Centre – Level 200 Quantity Surveying R 120 Million Completed 2006
Employer: Amaru Projects Employer’s Representative: Prakash Doolabh Contact No.: +27 83 414 5075
Malmesbury Prison Quantity Surveying R 150 Million Completed Project - 2006
Employer: Coega Development Corporation Employer’s Representative: Bruno Ponzo Contact No.: +27 41 403 0491
New Factory for Faurecia Quantity Surveying R 75 Million Completed 2009
Employer: Coega Development Corporation Employer’s Representative: Bruno Ponzo Contact No.: +27 41 403 0491
New Factory for Rehau Quantity Surveying R 90 Million Completed 2009
Employer: Coega Development Corporation Employer’s Representative: Maria van Zyl Contact No.: +27 41 403 0479
New Production Facility Quantity Surveying R 57 Million Completed 2010
Employer: South African Revenue Service Employer’s Representative: Ingrid Yegappen Contact No.: +27 82 880 3070
SARS Trescon Building Quantity Surveying R 100 Million Completed 2006
Employer: Transnet Freight Rail Employer’s Representative: Johan Basson Contact No.: +27 83 283 0508
Transnet Isando Office Upgrade Quantity Surveying R 60 Million Current Project
Page | 25
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Transnet Freight Rail Employer’s Representative: Johan Basson Contact No.: +27 83 283 0508
Transnet 138 Eloff Street Office Upgrade Quantity Surveying R 90 Million Current Project
Employer: South African Revenue Service Employer’s Representative: Ingrid Yegappen Contact No.: +27 82 880 3070
SARS Ashlea Gardens Quantity Surveying R 50 Million Completed 2006
Employer: University of Zululand Employer’s Representative: Mike Smythe Contact No.: +27 82 654 2557
New Richards Bay City Campus – Phase 1 Quantity Surveying R 60 Million Completed Project –
Dec 2009
Employer: Durban University of Technology Employer’s Representative: Len Rosenburg Contact No.: +27 31 204 2286
New Student Accommodation Quantity Surveying R 150 Million Current Project
Employer: University of Zululand – Richards Bay Campus Employer’s Representative: Mike Smythe Contact No.: +27 82 654 2557
New City Campus – Phase 2 Quantity Surveying R 300 Million Current – Estimate and
Concept Complete
Employer: University of Western Cape Employer’s Representative: Andre Smit Contact No.: +27 21 950 2101
UWC Chemical Sciences Building – Construction of New Laboratories, Teaching Facilities &
Offices
Quantity Surveying R 100 Million Current Project
Employer: Coega Development Corporation Employer’s Representative: Bruno Ponzo Contact No.: +27 41 403 0491
Bentler Automotive Quantity Surveying R 160 Million Completed 2010
Page | 26
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: National Department of Public Works Employer’s Representative: Etienne Oosthuizen Contact No.: +27 41 403 2045
Expanded Public Works Programme – Contractor
Development Programme
Quantity Surveying R 60 Million Completed 2007
Employer: Transnet Freight Rail Employer’s Representative: Johan Basson Contact No.: +27 83 283 0508
Transnet Salkor Office Upgrade Quantity Surveying R 50 Million Current Project – End
Mid 2014
Employer: University of KwaZulu Natal – Edgewood & Howard College Campus Employer’s Representative: Fred Pietersen Contact No.: +27 82 827 1325
New Student Accommodation Quantity Surveying R 50 Million Current Project –
Concept Stage
Employer: Nelson Mandela Bay Municipality Employer’s Representative: Andrew Treasure Contact No.: +27 41 506 2236
New Science Laboratory Quantity Surveying R 60 Million Current
Employer: Independent Development Trust Employer’s Representative: O. Makhobane Contact No.: +27 12 845 2000
New Plettenberg Bay Magistrate Court Quantity Surveying R 200 Million 18 Months - Current
Employer: Ekurhuleni Metropolitan Municipality (UWP) Employer’s Representative: Z. Lotter Contact No.: +27 11 709 8420
Ekurhuleni IRPTN Quantity Surveying R 488 Million Current Project 2014 – On hold
Employer: Independent Development Trust Employer’s Representative: O. Makhobane Contact No.: +27 12 845 2000
New Booysens Magistrate Court Quantity Surveying R 200 Million 18 Months – Current
Project
Page | 27
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Coega Development Corporation Employer’s Representative: Bruno Ponzo Contact No.: +27 41 403 0491
ASIDI Schools in the Eastern Cape – Demolish & Additions to 3 Schools
Quantity Surveying R 78 Million Current Project
Employer: Department of Public Works Employer’s Representative: A. Nedzamba Contact No.: +27 11 713 6124
Rehabilitation of 85 Anderson Street Quantity Surveying R 234 Million
Current Project - December 2013 –
June 2016
Employer: Ekurhuleni Metropolitan Municipality Employer’s Representative: Naas Rautenbach Contact No.: +27 11 999 6568
The establishment of a new fire station in
Thokoza Quantity Surveying
R 2080 192.00 (excluding vat) Current
Employer: Coega Development Corporation Employer’s Representative: Marie van Zyl Contact No.: +27 41 403 0479
New Skills Training Centre Quantity Surveying R 65 Million Current – Project on
Hold
Employer Department of Public Works Employer’s Representative: Samuel Jacobs Contact No.: +27 33 355 5400
Storm Damaged Schools – Phase 13 A Quantity Surveying R 58 Million 10 Months – B.O.Q.
Stage
Employer: G ft F Architecture CC Representing Zelph 1762 (Pty) Ltd. Employer’s Representative: Edgardo Gameleri Contact No.: (041) 365 – 1202
New Aspen Spar Shopping Centre
Quantity Surveying
R 3 Million
3 Months Completed
(2007)
Employer: G ft F Architecture CC Representing Zelph 1762 (Pty) Ltd. Employer’s Representative: Edgardo Gameleri Contact No.: (041) 365 – 1202
New Mercado Shopping
Centre
Quantity Surveying
R 20 Million
6 Months - Completed
2007
Page | 28
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Coega Development Corporation Employer’s Representative: Bruno Ponzo Contact No.: (041) 403 - 0491
New Factory for Rehau
Quantity Surveying
R 90 Million
9 Months Completed
2010
Employer: Coega Development Corporation Employer’s Representative: Bruno Ponzo Contact No.: (041) 403 – 0491
New Factory for Faurecia
Quantity Surveying
R 75 Million
9 Months Completed
2010
Employer: Coega Development Corporation Employer’s Representative: Maria van Zyl Contact No.: (041) 507 - 7343
New Cape Concentrate Production Facility
Quantity Surveying
R 57 Million
9 Months Completed
2010
Employer: Airports Company South Africa Employer’s Representative: Jackie Perkins Contact No. (041) 403 – 0479
Renovations to the Port Elizabeth International
Airport
Quantity Surveying
R 4 Million
10 Months - Completed 2010
Employer: Nelson Mandela Bay Municipality Employer’s Representative: Sthembile Magwaca Contact No.: (041) 585 – 9711
New Kwa-Dwesi Sports Facility
Quantity Surveying
R 7 Million
12 Months -
Completed 2010
Employer: Nelson Mandela Bay Municipality Employer’s Representative: Mark Radue Contact No.: (041) 508 – 2326
New Health & Wellness Centre
Quantity Surveying
R 23 Million
16 Months - Completed 2010
Page | 29
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Nelson Mandela Bay Municipality Employer’s Representative: Mark Radue Contact No.: (041) 508 – 2326
Alterations & Renovations of 8th
Avenue Clinic
Quantity Surveying
R 4 Million
6 Months - Completed 2011
Employer: Nelson Mandela Bay Municipality Employer’s Representative: Armien Madatt Contact No.: (041) 506 – 1655
Renovations to Various Floors of Offices of the
Lilian Diedericks Building (Previously
Brister House)
Quantity Surveying
R 9 Million
24 Months - Completed 2011
Employer: Nelson Mandela Metropolitan University Employer’s Representative: Graham Gouws (041) 504 – 3385
Renovations & Redecorations to the
Health Science Building
Quantity Surveying
R 17 Million
6 Months - Completed 2012
Employer: Department of Roads & Public Works (DRPW) Employer’s Representative: Pat Melani Contact No.: (043) 604 – 4078
New Libraries
Quantity Surveying
R 2 Million
6 Months - Completed 2013
Employer: Emfuleni Resorts (Pty) Ltd. Employer’s Representative: Philip de Wet Contact No.: (011) 283 – 1500
Extension to the Boardwalk Casino
Quantity Surveying
R 1 Billion
24 Months - Completed 2013
Employer: Airports Company South Africa Employer’s Representative: Jackie Perkins Contact No.: (041) 403 – 0479
Renovations to the Port Elizabeth International
Airport departure lounge
Quantity Surveying
R 4.2 Million
6 Months - Completed 2014
Page | 30
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Airports Company South Africa Employer’s Representative: Jackie Perkins Contact No.: (041) 403 – 0479
Construction of New Emergency Control
Centre
Quantity Surveying
R 3.5 Million
6 Months - Completed 2014
Employer: Coega Development Corporation Employer’s Representative: Bruno Ponzo Contact No.: (041) 403 – 0491
Various Extensions to Coega Dairy
Quantity Surveying & Project
Management
R 83 Million
6.5 Months - Completed 2015
Employer: East Cape Parks & Tourism Agency Employer’s Representative: Mcebisi Diniso Contact No.: (043) 705 – 4400
Upgrade of various campsites
Quantity Surveying
R 6 Million
6 Months - Completed 2016
Employer: Buffalo City Municipality Employer’s Representative: Lulama Mashiya Contact No.: (043) 705 – 2894
New King William’s Town Fire Station
Quantity Surveying
R 12 Million
9 Months - Completed 2016
Employer: Hume International Employer’s Representative: Fred Hume Contact No.: (041) 369 - 7161
Construction of new Greenbushes Cold Storage Warehouse
Quantity Surveying &
Project Management
R 25 Million
9 Months - Completed 2016
Employer: Hume International Employer’s Representative: Fred Hume Contact No.: (041) 369 – 7161
Renovations & Additions to Hume International
Office Block
Quantity Surveying &
Project Management
R 5.5 Million
6 Months - Completed 2017
Page | 31
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Department of Roads & Public Works Employer’s Representative: Collette Schonborn Contact No.: (041) 390 – 9135
New Early Childhood Development centre for
Bhongweni School
Quantity Surveying
R 7 Million
8 Months - Completed 2017
Employer: Department of Roads & Public Works Employer’s Representative: Collette Schonborn Contact No.: (041) 390 – 9135
New Early Childhood Development centre for
Emzomncane School
Quantity Surveying
R 7 Million
8 Months - Completed 2017
Employer: Transnet National Port Authority Employer’s Representative: Benedict Isaacs Contact No.: 071 681 7707
Construction of new TNPA Administration
Building
Quantity Surveying
R 279.85 Million
36 Months - Completed 2017
Employer: South Cape TVET College Employer’s Representative: Deslin Kohler Contact No.: (044) 884 - 0359
Construction of New Mossel Bay Student
Residence
Quantity Surveying
R 7 Million
10 Months Current
Employer: Coega Development Corporation Employer’s Representative: Thembeka Kolele Contact No. (041) 408 - 2126
Extension to the Dairy Factory for a Cheese
Making Facility
Quantity Surveying & Principal
Agent
R 20 Million
10 Months Current
Employer: Development Bank of Southern Africa Employer’s Representative: Tshepang Sentlela Contact No. (011) 313 – 3902
ASIDI Phase-2: Cluster D: Construction
of 3 Schools in the Eastern Cape
Quantity Surveying &
Principal Agent
R 130 Million
12 Months Current
Page | 32
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: NDPW Employer’s Representative: Thembeka Kolele Contact No.: (041) 408 – 2126
Repairs and Renovations to Gelvandale Police
Station
Quantity Surveying
R 34 Million
18 Months Current
Employer: Royal Haskonings DHV Employer’s Representative: Stefan Kaffka Contact No.: (043) 707 – 3000
Renovations, upgrading & new facilities at the
King Williams Town Taxi Rank for Buffalo City
Municipality
Quantity Surveying
R 80 Million
24 Months Current
Employer: Department of Rural Development & Land Reform Employer’s Representative: Nomathamsanqa Gobozi Contact No.: (043) 700 – 7000
Construction of Mnqumashe High
thoughput cattle and sheep Abattoir in
Butterworth
Quantity Surveying &
Principal Agent
R 60 Million
30 Months Current
Employer: NDPW Employer’s Representative: Zinzi Ntanjana Contact No.: (041) 408 - 2012
Repairs and Renovations to Grahamstown Police
Station
Quantity Surveying
R 60 Million
30 Months Current
Employer: NDPW Employer’s Representative: Frank Carolus Contact No. (041) 408 - 2083
Repairs and Renovations to Kwazakhele Police
Station
Quantity Surveying
R 40 Million
30 Months Current
Employer: DRPW (EC) Employer’s Representative: Siyabonga Hlangwana Employer’s Representative: (041) 390 – 9164
Repairs, Renovations
and Additions to Asherville Public School
Quantity Surveying
R 77 Million
30 Months Current
Page | 33
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: DRPW (EC) Employer’s Representative: Siyabonga Hlangwana Contact No.: (041) 390 - 9164
Construction of Lingcom Primary
Quantity Surveying
R 75 Million
30 Months Current
Employer: Perpendicular Property Investments (Pty) Ltd Employer’s Representative: Dennis Fabian Contact No.: +27 21 418 9500
Portico Apartments - Construction of a double basement
parking, ground & first floor & 11 storeys of apartments above
Quantity Surveying
R 70 Million
13 Months – Project Start January 2006 - Completed February
2007
Employer: Spearhead Property Group Employer’s Representative: Xander Rau Contact No.: +27 21 425 1000
CTX Freight Park – Phase 1 Construction of Multi-Unit Industrial and
office building associated civil,
electrical & external works
Quantity Surveying
R 29.4 Million
13 Months – Project Start October 2006 - Completed November
2007
Employer: Brickfield Joint Venture Employer’s Representative: Justin Betts Contact No.: +27 21 462 2046
Upper East Side Apartments -
Refurbishment of an existing building into an
apartment, etc. Complex
Quantity Surveying
R 55 Million
15 Months – Project Start October 2006 - Completed November
2007
Employer: Brickfield Joint Venture Employer’s Representative: Justin Betts Contact No.: +27 21 462 2046
Upper East Side Parking Garage - Construction of a four level parking
garage
Quantity Surveying
R 16 Million
9 Months – Project Start March 2007 - Completed
November 2007
Employer: Spearhead Property Holdings Group Limited Employer’s Representative: Lance Hoffman Contact No.: +27 21 425 1000
Convention Towers Offices at CTICC -
Construction of Single Basement Parking,
Ground Floor retail & Exhibition Space, 4 Levels of Structured Parking & 8 Levels of
Offices above
Quantity Surveying
R 170 Million
21 Months – Project Start March 2005 -
Completed December 2007
Page | 34
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: City of Cape Town Employer’s Representative: Craig Hinde Contact No.: +27 21 400 3763
Athlone Stadium Phase 3 - Alterations &
Additions to Existing Stadium
Quantity Surveying
R 51 Million
12 Months – Project Start April 2007 -
Completed April 2008
Employer: Spearhead Property Group Employer’s Representative: Xander Rau Contact No.: +27 21 425 1000
China City - Construction of Multi-
Unit Industrial buildings incl. associated civil, electrical & external
works
Quantity Surveying
R 38 Million
14 Months – Project Start April 2007 -
Completed June 2008
Employer: University of Cape Town Employer’s Representative: Jan Bester Contact No.: +27 21 650 3587
UCT Menzies – Additional Floor & Refurbishment of
Existing
Quantity Surveying
R 11 Million
6 Months Project Start June 2008 Completed November
2008
Employer: Metropolitan Life Limited Employer’s Representative: Stuart Shaw Contact No.: +27 21 940 6060
Parc du Cap Building No. 9 -Construction of a
four level parking garage, One Office level
Quantity Surveying
R 52 Million
19 Months Project Start May 2007 Completed December
2008
Employer: Metropolitan Life Limited Employer’s Representative: Stuart Shaw Contact No.: +27 21 940 6060
Plattekloof Offices Blocks C & D -
Construction of one level Semi-basement,
three office levels
Quantity Surveying
R 65 Million
19 Months Project Start May 2007 -
Completed Dec 2008
Employer: Metropolitan Life Limited Employer’s Representative: Vuyani Hako Contact No.: +27 21 940 6060
The Refurbishment of Metropolitan Life
Centre - Refurbishment & renovation of 3
parking left lobbies, the ground floor area & 9 office level storeys
above
Quantity Surveying
R 14 Million
10 Months Project Start Feb 2008 Completed Dec 2008
Page | 35
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Precious Prospects 9 Employer’s Representative: Mark Saacks Contact No.: +27 21 447 5689
Harbour Bridge Hotel - Construction of double storey basement , Semi
Basement & Multi Storey Residential /
Hotel Units & Associated Site Works &
Landscaping
Quantity Surveying
R 151 Million
23 Months Project Start April 2007 Completed March 2009
Employer: University of Cape Town Employer’s Representative: Jan Bester Contact No.: +27 21 650 3587
UCT PD Hahn – Alterations &
Refurbishment to Existing Building
Quantity Surveying
R 17 Million
10 Months Project Start July 2008 Completed April 2009
Employer: City of Cape Town Employer’s Representative: Craig Hinde Contact No.: +27 21 400 3763
Athlone Stadium Phase 4 – North Stand (Stage 1) & West & East Stand
Suites Fit Out
Quantity Surveying
R 56 Million
13 Months Project Start July 2008 Completed July 2009
Employer: University of Western Cape Employer’s Representative: Andre Smit Contact No.: +27 21 950 2101
UWC Gatehouse – Construction of New
East Entrance
Quantity Surveying
R 4 Million
3 Months Project Start June 2009 Completed August 2009
Employer: Paramount Property Fund Employer’s Representative: Arnold Maresky Contact No.: +27 21 674 5130
Paramount Centre - Construction of single
basement parking, ground floor, 5 levels of above ground parking, 7 levels of offices, incl. 2 levels of Virgin Active
gym & 5 levels of apartments
Quantity Surveying
R 294 Million
23 Months Project Start Dec 2007-Completed
Dec 2009
Employer: University of Western Cape Employer’s Representative: Jacob Thampi Contact No.: +27 21 959 3399
UWC Life Sciences Building - Construction of 5 Storey Building -
New Laboratories, Teaching Facilities,
Offices
Quantity Surveying
R 392 Million
24 Months Project Start Jan 2008
Completed January 2010
Page | 36
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: University of Western Cape Employer’s Representative: Andre Smit Contact No.: +27 21 950 2101
UWC Dental Faculty – Refurbishment of the Existing First Floor of
the UWC Dental Faculty – Mitchells Plain
Quantity Surveying
R 5.6 Million
5 Months Project Start Sept 2009
Completed January 2010
Employer: ACSA Employer’s Representative: Bharat Bhikha Contact No.: +27 21 937 1200
CTIA – Integrated Terminal Construction
of New Integrated Terminal & Alterations to Existing Terminals
Quantity Surveying
R 1.3 Billion
38 Months Project Start April 2007 Completed June 2010
Employer: Prasa Employer’s Representative: Pierre Cronje Contact No.: +27 21 440 5567
Cape Town Station – Construction of
Buildings, Platforms, Concourses, etc.
Quantity Surveying
R 550 Million
24 Months Project Start June 2008 Completed June 2010
Employer: Nike South Africa Employer’s Representative: Lynette Molette Contact No.: +27 21
Nike House of Football - Construction of a new multi-storey clubhouse
including peripheral siteworks, parking, etc.
Quantity Surveying
R 52 Million
8 Months Project Start Dec 2009 Completed July 2010
Employer: Metropolitan Life Limited Employer’s Representative: Stuart Shaw Contact No.: +27 21 940 6067
108 Fox Street -Refurbishment of Existing Building
Quantity Surveying
R 46 Million
13 Months Project Start Aug 2009 Completed Sept 2010
Employer: Quarry Hill Developments (Pty) Ltd Employer’s Representative: Dennis Fabian Contact No.: +27 21 418 9500
Quarry Hill Apartment Complex - Construction of 2 levels of basement
with 4 levels of residential apartments
above
Quantity Surveying
R 30 Million
10 Months – Project Start Feb 2010 Completed November
2010
Page | 37
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Metropolitan Life Ltd Employer’s Representative: Stuart Shaw Contact No.: +27 21 940 6067
Refurbishment of Parktown Pellmeadow & Rivonia – Johannesburg
- Construction of 2 levels of basement with 4 levels of residential
apartments above
Quantity Surveying
R 58 Million
10 Months Project Start April 2010
Completed January 2011
Employer: Ingenuity Employer’s Representative: John Bielich Contact No.: +27 21 674 5130
33 Martin Hammerschlag –
Alterations & Additions to Offices
Quantity Surveying
R 14 Million
11 Months Project Start July 2010 Completed August 2011
Employer: Faircape Employer’s Representative: Mike Vietri Contact No.: +27 21 815 5740
Wembley Phase 2 – Office Block - New Parking & Offices
Quantity Surveying
R 217 Million
20 Months Project Start Aug 2009 Completed Nov 2011
Employer: Victoria & Alfred Hotel (Pty) Ltd Employer’s Representative: Neil Markowitz Contact No.: +27 21 430 3311
Queen Victoria Hotel -Alterations & Additions to Existing building for conversion into hotel
accommodation
Quantity Surveying
R 43 Million
10 Months Project Start Feb 2011 Completed Nov 2011
Employer: Stor-age Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Bloemfontein Phase 1 Construction of new
storage facility
Quantity Surveying
R 17 Million
8 Months Project Start April 2011 Completed November
2011
Employer: Stor-age Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – M2 Johannesburg -
Alterations of new storage facility
Quantity Surveying
R 21 Million
8 Months Project Start May 2011 Completed December
2011
Page | 38
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: University of Western Cape Employer’s Representative: Andre Smit Contact No.: +27 21 959 2101
Chemical Science Building – Piling
Installation
Quantity Surveying
R 4.3 Million
3 Months Project Start November
2011 Completed January
2012
Employer: Department of Transport & Public Works (PG) Employer’s Representative: Zandile Felani Contact No.: +27 21 483 4605
Westlake Primary School – Construction of primary school including electrical installation &
associated external works
Quantity Surveying
R 20 Million
26 Months Project Start January
2010 – March 2012
Employer: Andreas & Sue Struengman Foundation Employer’s Representative: Mica Naumann Contact No.: +27 21 419 3383
Imizamo Yethu Primary School – Construction of
new primary school incl. playground area
and tennis courts
Quantity Surveying
R 41 Million
13 Months – Project Start Feb 2011 -
Completed March 2012
Employer: Stor-age Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Killarney - Construction of new
storage facility
Quantity Surveying
R 41 Million
10 Months Project Start Aug 2011 Completed May 2012
Employer: Redefine Properties Ltd Employer’s Representative: Daryl Sher Contact No.: +27 21 425 1000
CTX Freight Park – Phase 2 – Construction
of new warehouse including associated site
works
Quantity Surveying
R 26 Million
13 Months Project Start April 2011
Completed May 2012
Employer: Faircape Property Develop Employer’s Representative: Izak Burger Contact No.: +27 21 462 0170
Wembley Phase 3 – New Offices & Parking
Quantity Surveying
R 52 Million
9 Months Project Start Nov 2011 Completed July 2012
Page | 39
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Cape Peninsula University of Technology Employer’s Representative: Alex Honhaar Contact No.: +27 21 959 6277
Extensions to the Mechanical Engineering
Building (Bellville Campus)
Quantity Surveying
R 35 Million
8 Months Project Start Dec 2011 -
Completed July 2012
Employer: Black River Park Investments Employer’s Representative: Joubert Rabie Contact No.: +27 21 812 2732
BRP Substation – Construction
Quantity Surveying
R 1.2 Million
4 Months Project Start May 2011 –
Completed August 2012
Employer: Department of Transport & Public Works, Employer’s Representative: George Paulsen Contact No.: +27 21 483 2509
Naphakade & Citrusdal Secondary Schools – Construction of new
schools
Quantity Surveying
R 60 Million
Quantity Surveying
11 Months Project Start October
2011 – Completed August 2012
Employer: City of Cape Town Employer’s Representative: Martin Stander Contact No.: +27 21 400 9331
Redecoration of Civic Centre – Alterations to
façade and re-waterproofing under
paving
Quantity Surveying
R 33 Million
18 Months Project Start March
2011 Completed Sept 2012
Employer: Ingenuity Properties Employer’s Representative: Arnold Maresky Contact No.: +27 21 674 5130
Newspaper House – Conversion of
Newspaper House to Offices and Retail
Quantity Surveying
R 30 Million
9 Months Project Start Feb 2012 -
Completed Sept 2012
Employer: Black River Park Investments Employer’s Representative: Joubert Rabie Contact No.: +27 21 812 2732
BRP – Adidas
Quantity Surveying
R 2.3 Million
17 Months Project Start June 2011
Completed Nov 2012
Page | 40
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Cape Peninsula University of Technology Employer’s Representative: Stan Dennis Contact No.: +27 21 959 6277
Alterations & Additions to Faculty and Social
Science for CPUT Mowbray campus
Quantity Surveying
R 28 Million
18 Months Project Start May 2011
Completed Nov 2012
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Bellville - construction of new
storage facility
Quantity Surveying
R 11 Million
8 Months Project Start April 2012
Completed Nov 2012
Employer: Pareto Limited & Metropolitan Life Limited Employer’s Representative: Vuyani Hako Contact No.: +27 21 940 6067
Tygervalley Shopping Centre Phase 1 –
Alterations & Refurbishment of Existing Shopping
Centre
Quantity Surveying
R 370 Million
20 Months Project Start April 2011
Completed Dec 2012
Employer: Department of Transport & Public Works, PG Employer’s Representative: Zandile Felane Contact No.: +27 21 483 4605
Corktree & Aberdare Schools – Construction of 2 primary schools
incl. electrical installation &
associated external works
Quantity Surveying
R 60 Million
55 Months Project Start May 2009 -
Completed Dec 2012
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Samrand - construction of new
storage facility
Quantity Surveying
R 20 Million
12 Months Project Start March
2012 - Completed March 2013
Employer: Ingenuity Properties Employer’s Representative: John Bielich Contact No.: +27 21 674 5130
Atlantic Centre –Construction of Office
Development
Quantity Surveying
R 81 Million
17 Months Project Start Jan 2012 - Completed June 2013
Page | 41
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – 14th Avenue - Construction of new storage facility
Quantity Surveying
R 60 Million
12 Months Project Start June 2012 Completed June 2013
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Esther Park construction of new storage facility
Quantity Surveying
R 23 Million
19 Months Project Start Jan 2012 - Completed August 2013
Employer: Black River Park Investments Employer’s Representative: Joubert Rabie Contact No.: +27 21 812 2732
BRP – RTT Conversion
Quantity Surveying
R 12.3 Million
11 Months Project Start Oct 2012 - Completed Sept 2013
Employer: Redefine Properties Ltd Employer’s Representative: Daryl Sher Contact No.: +27 21 443 7600
CTX Freight Park – Phase 3
Quantity Surveying
R 26 Million
8 Months Project Start Jan 2013 – Completed Sept 2013
Employer: University of Western Cape Employer’s Representative: Andre Smit Contact No.: +27 21 950 2101
UWC Chemical Sciences Building – Construction of New Laboratories, Teaching Facilities &
Offices
Quantity Surveying
R 226 Million
23 Months Project Start Nov 2011 -
Completed Oct 2013
Employer: Sporting Partnership Employer’s Representative: John Bielich Contact No.: +27 21 674 5130
Construction of a new outdoor warehouse &
alterations to Sportsman’s Warehouse
Quantity Surveying
R 13 Million
11 Months Project Start Nov 2012 -
Completed Oct 2013
Page | 42
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Pinehurst storage facility
Quantity Surveying
R 52 Million
13 Months Project Start Oct 2012 –
Completed Nov 2013
Employer: Oasis Employer’s Representative: Allan Cunningham Contact No.: +27 21
Oasis Retirement Complex
Quantity Surveying
R 120 Million
6 Months - Completed 2013
Employer: Roeland Street Investments Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Claremont -
Construction of 6 level storage facility
Quantity Surveying
R 60 Million
17 Months – Project start Dec 2012 - Completed March 2014
Employer: City Varsity Employer’s Representative: Ryan Joffe Contact No.: +27 21 973 1222
City Varsity Roeland Street
Quantity Surveying
R 8 Million
13 Months - Project Start Feb 2013 - Completed March 2014
Employer: Airports Company SA Employer’s Representative: Ayesha Atcha Contact No.: +27 21 937 1222
Relocation of the immigration facility and
the construction of a new airlines floating
lounge
Quantity Surveying
R 13.8 Million
12 Months – Project Start March
2013 - Completed March 2014
Employer: Growthpoint Employer’s Representative: Mike Brokenshire Contact No.: +27 21 408 7820
V & A Replacement Cost Estimate
Quantity Surveying
1 Months - Project Start Feb 2014 - Completed March 2014
Page | 43
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: XGEN Employer’s Representative: Frank Gormley Contact No.: +27 21 426 4759
97 St. Georges Mall – Alterations to Student
Accomodation
Quantity Surveying
R 8 Million
6 Months - Project start Nov 2013 Completed April 2014
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Somerset West - Construction of
new storage facility
Quantity Surveying
R 16.8 Million
9 Months – Project start Aug 2013 - Completed April 2014
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Centurion -
Construction of new storage facility
Quantity Surveying
R 11.3 Million
12 Months – Project Start June 2013 Completed June 2014
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi PUBLIC Storage- Construction of new
storage facility
Quantity Surveying
R 11.4 Million
8 Months – Project start Nov 2013 - Completed June 2014
Employer: Stimela Bosch Employer’s Representative: Nadia Verster Contact No.: +27 21 914 2756
DBSA – Nursing Colleges Quantity Surveying
R 80 Million
30 Months – Project Start Jan 2012 -
Completed July 2014
Employer: Ingenuity Properties Employer’s Representative: Arnold Maresky Contact No.: +27 21 674 5130
Reeds Parking – New Parking Garage
Alterations & Additions
Quantity Surveying
R 76.5 Million
9 Months – Project Start Nov 2013 -
Completed July 2014
Page | 44
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Ingenuity Properties Employer’s Representative: John Bielich Contact No.: +27 21 674 5130
Santam Offices – New Offices and Parking
Quantity Surveying
R 179 Million
27 Months – Project Start April 2012
Completed July 2014
Employer: LDM Consulting Employer’s Representative: Mark Hulley Contact No.: +27 21 465 3294
SALKOR - Alterations Quantity Surveying
R 56.5 Million
13 Months – Started July 2013 -
Completed August 2014
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Westering -
Construction of new storage facility
Quantity Surveying
R 27.6 Million
12 Months – Project Start Aug 2013 - Completed August 2014
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Brooklyn - Construction of new
storage facility
Quantity Surveying
R 50.5 Million
13 Months – Project Start July 2013 -
Completed August 2014
Employer: President Hotel Cape Town (PTY) LTD Employer’s Representative: Frank Gormley Contact No.: +27 21 426 4759
President Hotel Revamp
Quantity Surveying
R 6.8 Million
4 Months - Project Start July 2014 Completed Oct 2014
Employer: Eris Property Properties Employer’s Representative: John Eager Contact No.: +27 21 410 1160
Plattekloof Shopping Centre
Quantity Surveying
R 17 Million
12 Months – Project Start Oct 2013 -
Completed Oct 2014
Page | 45
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Ingenuity Properties Employer’s Representative: Arnold Maresky Contact No.: +27 21 674 5130
Glacier Place - Parking Extensions
Quantity Surveying
R 14.5 Million
13 Months – Project start Oct 2013 -
Completed Nov 2014
Employer: Spear Properties Employer’s Representative: Quinton Rossi Contact No.: +27 21 404 0580
Pickwick Street – Alterations & Extensions
Quantity Surveying
R 4.5 Million
11 Months – Project Start Dec 2013 -
Completed Nov 2014
Employer: Pareto MMI Employer’s Representative: Nathisha Singh Contact No.: +27 11 258 6800
Tygervalley Replacement Cost
Quantity Surveying
8 Months - Project Start April 2014
Completed Nov 2014
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Pinehurst storage facility – PHASE
2
Quantity Surveying
R 8.2 Million
6 Months – Project Start July 2014 Completed Dec 2014
Employer: University of Cape Town Employer’s Representative: Chris Briers Contact No.: +27 21 650 6591
UCT New Engineering Building - Construction
of new Teaching facilities, Offices &
Alterations to Existing Snape Building
Quantity Surveying
R 292 Million
51 Months – Project Start Sept 2010 - Completed Dec 2014
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Six Fountains -
Construction of new storage facility
Quantity Surveying
R 42.5 Million
18 Months – Project Start July 2013 Completed Dec 2014
Page | 46
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – MT Edgecombe -
Construction of new storage facility
Quantity Surveying
R 52.5 Million
17 Months – Project Start Sept 2013 -
Completed Dec 2014
Employer: Pareto MMI Employer’s Representative: Nathisha Singh Contact No.: +27 11 258 6800
Tygervalley Stuttafords
Quantity Surveying
R 16 Million
12 Months – Project Start March 2014 -
Completed March 2015
Employer: Prasa Employer’s Representative: Moseli Ntsiki Contact No.: +27 21 419 5453
Cape Town Station Parade Concourse &
Infill Deck – Alterations & Additions to existing
concourses
Quantity Surveying
R 101 Million
18 Months – Project Start Nov 2013 –
Completed May 2015
Employer: Sabido Properties (Pty) Ltd Employer’s Representative: Bronwyn Keene Young Contact No.: +27 11 537 9434
E-TV Studios – Construction of New Offices and Parking
Quantity Surveying
R 296 Million
28 Months – Project Start Jan 2013 -
Completed May 2015
Employer: ACSA Employer’s Representative: Ayesha Atcha Contact No.: +27 21 937 1200
ACSA Northern Lounge
Quantity Surveying
R 7.5 Million
5 Months - Project Start Sept 2014
Completed May 2015
Employer: Ingenuity Properties Employer’s Representative: Arnold Maresky Contact No.: +27 21 674 5130
Cape Chamber Building -
New Parking Garage – 6 levels & Refurbishment & additions to existing
building
Quantity Surveying
R 37 Million
15 Months - Project Start Feb 2014 Completed June 2015
Page | 47
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Protea Hotel Employer’s Representative: Des Contact No.: +27 21 434 7850
Waterproofing to Existing Roofs
Quantity Surveying R 310 000
3 Months – Project Start April 2015 completed June 2015
Employer: Stor-Age Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Stor-age – Westering - Construction of new
storage facility
Quantity Surveying
R 6 Million
4 Months - Start March 2015 will be completed
June 2015
Employer: Prasa Employer’s Representative: Moseli Ntsiki Contact No.: +27 21 440 5567
Bellville Station – Construction of New
Concourses
Quantity Surveying
R 27 Million
21 Months – Project Start Nov 2013 –
Completed August 2015
Employer: Pareto Employer’s Representative: Johan Mouton Contact No.: +27 21 914 1822
Tygervalley Centre – Roof Refurbishment
Quantity Surveying
R 45.6 Million
17 Months – Project start April 2014 -
Completed Sept 2015
Employer: HHO / Gibb Employer’s Representative: Susan Smit Contact No.: +27 21 425 2870
IRT – Integrated Rapid Transport System –
Phase 1A
Quantity Surveying
R 358 Million
45 Months – Start June 2009 – Completed Sept
2015
Employer: Redefine Properties Employer’s Representative: Darryl Sher Contact No.: +27 21 443 7600
The Towers - New Parking Garage &
Façade Enclosure to exsitingTowers
Quantity Surveying
R 408 Million
26 Months - Project Start June 2013 –
Completed November 2015
Page | 48
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Fairfield Employer’s Representative: GSL Projects Contact No.: +27 21 704 1007
Fairfield Butchery – Alterations & Upgrade
of Existing meat market
Quantity Surveying
R 35 Million
20 Months - Project Start April 2014 –
Completed Dec 2015
Employer: Prasa Employer’s Representative: Pierre Cronje Contact No.: +27 21 440 5567
Philippi Station – Construction of New
Concourses
Quantity Surveying
R 65 Million
25 Months – Project start Nov 2013 –
completed Dec 2015
Employer: Stor-Age Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Stor-age – Midrand - Construction of new
storage facility
Quantity Surveying
R 19 Million
8 Months – Project Start May 2015- completed
Dec 2015
Employer: Stor-Age Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Stor-age –Zwartkop - Construction of new
storage facility
Quantity Surveying
R 8.3 Million
8 Months - Project Start July 2015 -
completed Feb 2016
Employer: Lauren Snyman Employer’s Representative: Lauren Snyman Contact No.: +27 21 424 0129
House Snyman – Alterations & Additions
to existing house
Quantity Surveying
R 4.5 Million
3 Months – Project Start Sept 2015 –Completed
March 2016
Employer: Department of Public Works, Employer’s Representative: Johan Slabbert Contact No.: +27 21 402 2021
Bishop Lavis – SAPS Project Five Star and
upgrading
Quantity Surveying
R 49 Million
53 Months – Project Start May 2011 -
Completed April 2016
Page | 49
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Cape Town Film Studios (Pty) Ltd Employer’s Representative: Nico Dekker Contact No.: +27 21 843 2400
Construction of New Cape Town Film Studio, New Fillm & TV Studio
& Workshop
Quantity Surveying R 29 Million
6 Months – Project Start July 2015 - completed
April 2016
Employer: Redefine Properties Employer’s Representative: Darryl Sher Contact No.: +27 21 443 7600
Redefine Offices – Fit Out
Quantity Surveying
R 9,9 Million
5 Months - Project Start June 2015 –
Completed April 2016
Employer: Prasa Employer’s Representative: Moseli Ntsiki Contact No.: +27 21 419 5453
Bellville Station – PHASE 2
Quantity Surveying
R 15 Million
8 Months – Project Start Sept 2015 –Completed
April 2016
Employer: WCFP Trust Employer’s Representative: Alex Robertson Contact No.: +27 21 683 9470
West Coast Fossil Park – Construction Comprises
of New Multi-Level Museum, Visitors
Centre & Restaurant
Quantity Surveying
R 48 Million
17 Months - Project Start May 2014 –
Completed May 2016
Employer: CPUT Employer’s Representative: Alex Honhaar Contact No.: +27 21 959 5600
CPUT Mowbray Phase 1 & 2 – Alterations and
Additions for new Computer Centre, New Teaching Facility above
the sports Hall, and Two Levels of lecture
theatre within the existing courtyard
Quantity Surveying
R 83 Million
19 Months - Project Start Nov 2014 -
Completed June 2016
Employer: Gregaleihk (Pty) Ltd Employer’s Representative: Bernard Kantor Contact No.: +27 21 419 5453
Newport Residential (Erf 1570 Mouille Point
Apartments) – Demolitions of existing building & build new retail & apartments
Quantity Surveying
R 89 Million
24 Months - Project July 2014 – Completed
June 2016
Page | 50
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Prasa Employer’s Representative: Moseli Ntsiki Contact No.: +27 21 419 5453
Cape Town Station – Construction of New Drivers Mess Facility
Quantity Surveying
R 66 Million
41 Months – Project start Aug 2014 –
Completed July 2016
Employer: Department of Public Works, Employer’s Representative: Mark Carstens Contact No.: +27 21 483 5438
Brackenfell Secondary School – Construction of
New School
Quantity Surveying
R 35 Million
25 Months – Project start May 2013 -
Completed Aug 2016
Employer: Stor-Age Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Stor-age – Sunninghill - Construction of new
storage facility
Quantity Surveying
R 63 Million
13 Months – Project Start July 2015 -
Completed Aug 2016
Employer: PGWC Employer’s Representative: Valerie Lambrechts Contact No.: +27 21 483 2687
Westlake Primary School – Expansion & Upgrading of existing
school
Quantity Surveying
R 9.3 Million
16 Months Project Start May 2015 – Completed
Sept 2016
Employer: ARG Architects Employer’s Representative: Allistair Rendall Contact No +27 21 448 666
IRT Phase 1B & N2 Services – Integrated
Rapid Transport System
Quantity Surveying
R 100 Million
37 Months - Project start June 2013 -
Completed Sept 2016
Employer: V & A Hotel (Pty) Ltd Employer’s Representative: Andy Nold Contact No.: +27 21 427 5900
V & A Hotel – Ground Floor Refurbishment
Quantity Surveying
R 11.5 Million
5 Months - Project Start May 2016 –
Completed September 2016
Page | 51
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Department of Public Works, Employer’s Representative: Michael Carstens Contact No.: +27 21 402 2043
Cape Town Magistrates Court - Alterations
Quantity Surveying
R 17 Million
23 Months – Project Start Dec 2014 –
Completed Nov 2016
Employer: Gemini Trading 64 (Pty) Ltd Employer’s Representative: Nazir Amien Contact No.: +27 082 097 7452
Bella Rosa Upington – Construction of New
Residential Development
Quantity Surveying R 330 Million
22 Months – Project Start March 2015 -
Completed Dec 2016
Employer: Shutters Group Employer’s Representative: Daryl Sher Contact No.: +27 21 443 7600
Upper Rhine Road - Construction of New
Residential Apartments
Quantity Surveying
R 23 Million
12 Months - Project Start January 2016 –
Completed – Dec 2016
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Pinehurst storage facility – PHASE 3 – New Construction
Quantity Surveying
R 11.4 Million
8 Months – Project Start May 2016 Completed
Dec 2016
Employer: Transnet Park Employer’s Representative: Johan Basson Contact No.: +27 11 584 0697
Transnet Park Admin Building –
Refurbishment of existing building
Quantity Surveying
R 42 Million
10 Months - Project Start Jan 2016 –
Completed Jan 2017
Employer: Transnet Park Employer’s Representative: Johan Basson Contact No.: +27 11 584 0697
Transnet Park Belcon Building –
Refurbishment of existing building
Quantity Surveying
R 37 Million
10 Months - Project Start Jan 2016 –
Completed Jan 2017
Page | 52
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Redefine Properties Employer’s Representative: Xander Rau Contact No.: +27 21 443 7600
The Towers Internal Refurbishments – Floors
3 to 16 Alterations & Additions
Quantity Surveying
R 33 Million
16 Months - Project Start October 2015 – Completed February
2017
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Berea storage facility
Quantity Surveying
R 41 Million
13 Months – Project Start Jan 2016 Completed Feb
2017
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Berea storage facility
Quantity Surveying
R 40 Million
13 Months – Project Start Jan 2016 - Completed Feb
2017
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Randburg storage facility
Quantity Surveying
R 41 Million
14 Months – Project Start Jan 2016
Completed March 2017
Employer: V & A Hotel (Pty) Ltd Employer’s Representative: Andy Nold Contact No.: +27 21 427 5900
Mesa House – Refurbishment of Offices for New Boutique Hotel
Quantity Surveying
R 9 Million
6 Months - Project Start October 2016 –
Completed March 2017
Employer: Wynberg Girls High School Employer’s Representative: Hillary Mills Contact No.: +27 21 764 2200
Wynberg Girls High
Quantity Surveying
R 9 Million
10 Months - Project Start May 2016 –
Completed June 2017
Page | 53
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: V & A Waterfront Employer’s Representative: Kirsten Goosen Contact No.: +27 21 408 7500
Consolidated Services Facility (North & South)
– Alterations & Construction of a New
Facility
Quantity Surveying
R 30 Million
11 Months - Project Start October 2016 – Completed - August
2017
Employer: Spear Properties Employer’s Representative: Quintin Rossi Contact No.: +27 21 404 0580
Refurbishment of the three level Warwick
building into apartments and
construction of the eleven storey Warwick
Mansion
Quantity Surveying R 136 Million
17 Months - Project Start June 2016 –
Completed Dec 2017
Employer: Focus PM Employer’s Representative: Kader Meyer Contact No.: +27 21
DEA – Western Cape City Parks - Upgrading of
Parks in Delft, Khayelitsha & Mitchells
Plain
Quantity Surveying
R 40 Million
32 Months – Project Start September 2014 -
Current
Employer: Shutters Group Employer’s Representative: Daryl Sher Contact No.: +27 21 443 7600
14 St. Johns Road - Construction of New
Residential Apartments
Quantity Surveying
R 23 Million
13 Months - Project Start November 2016 – Completed February
2018
Employer: Ingenuity Properties Employer’s Representative: Arnold Maresky Contact No.: +27 21 674 5130
Santam - Tygervalley Head Office
Refurbishment
Quantity Surveying
R 120 Million
17 Months - Project Start October 2016 – Completed April 2018
Employer: Community Property Company (Pty) Ltd Employer’s Representative: Kathryn Robertson Contact No.: +27 21 673 3300
New KFC Motherwell Shopping Centre –
Construction of a single storey structure
Quantity Surveying
R 4.6 Million
7 Months - Project Start Nov 2017 –
Completed May 2018
Page | 54
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Hollyberry Properties Employer’s Representative: Roger Overton Contact No.: +27 21 507 8800
Golden Arrow Bus Services – Construction
of a new Learning Centre
Quantity Surveying
R 30 Million
15 Months - Project Start Feb 2017 -
Completed May 2018
Employer: Desmond Tutu Foundation Employer’s Representative: Jack McGhie Contact No.: +27 21 936 7600
The Granary Restoration – Alterations & additions to the existing building
Quantity Surveying R 27 Million
17 Months - Start March 2016 - Completed May
2018
Employer: Artscape Employer’s Representative: Andre Steenveld Contact No.: +27 21 410 9953
Artscape – Refurbishment of the
existing Foyers Lobbies
Quantity Surveying
R 28 Million
8 Months – Project Start Nov 2017 - Completion
June 2018
Employer: Planteam Resi Employer’s Representative: Wessel Botes Contact No.: +27 72377 1275
Gorgeous George – Conversion of existing building to Residential
Units
Quantity Surveying
R 50 Million
10 Months – Project Start Oct 2017
Completion July 2018
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Craighill storage facility
Quantity Surveying
R 57 Million
15 Months – Project Start April 2017 -
Completion July 2018
Employer: Storage Employer’s Representative: Steven Horton Contact No.: +27 21 559 8128
Sassi Storage – Bryanston storage
facility
Quantity Surveying
R 48 Million
15 Months – Project Start May 2017 Completion Aug
2018
Page | 55
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Mr & Mrs Sher Employer’s Representative: Noero Architects Contact No.: +27 21 424 5508
House Sher – Alterations & Additions to House
Sher
Quantity Surveying
R 7 Million
10 Months – Project Start Nov 2017 –
Completion August 2018
Employer: Bantry Hills Pty (Ltd) Employer’s Representative: Abu Varachhia Contact No.: +27 21 404 0580
Bantry Hills Apartments –Construction of New Luxury Apartments
Quantity Surveying
R 456 Million
30 Months – Project Start March 2016 –
Completion September 2018
Employer: Spear Holdco Employer’s Representative: Abu Varachhia Contact No.: +27 21 404 0580
78 On Edward - Office Retail & Parking Refurbishment
Quantity Surveying
R 80 Million
11 Months – Project Start Jan 2018
Completeion November 2018
Employer: CPUT Employer’s Representative: Alex Honhaar Contact No.: +27 21 959 5600
CPUT Chem Engineering – 3 levels of laboratories,
classrooms, computer labs and offices
Quantity Surveying
R 146 Million
48 Months Project Start Jan 2015 – Completion
December 2018
Employer: ACSA Employer’s Representative: Bertram Stoffels Contact No.: +27 21 937 1200
ACSA – New Central Lounge
Quantity Surveying
R 23.3 Million
12 Months - Project Start August 2016 –
Completion December 2018
Employer: ACSA Employer’s Representative: Bertram Stoffels Contact No.: +27 21 937 1200
ACSA – CTIA Terminal 5 Quantity Surveying
R 360 Million
36 Months - Project Start Aug 2014 –
Ongoing
Page | 56
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: ARG Employer’s Representative: Allistair Rendall Contact No.: +27 21 448 2666
Rustenburg BRT – Station Superstructures
Quantity Surveying
R 300 Million
96 Months – Project Start June 2011 -
Current
Employer: Department of Transport & Public Works Employer’s Representative: Rudolf Geyser Contact No.: +27 21 483 0500
Roeland Street Archives - Extension to existing
Archive Facility
Quantity Surveying
R 70 Million
Current
Employer: Ingenuity Properties Employer’s Representative: Arnold Maresky Contact No.: +27 21 674 5130
Vineyard Road Offices – Demolish and Rebuild of
New Offices
Quantity Surveying
R 57 Million
20 Months - Project Start November 2017 – Completion Dec 2018
Employer: UCT Properties Employer’s Representative: Yaseen Parker Contact No.: +27 21 650 4852
Steve Bhiko – Alterations and
Additions to level 3
Quantity Surveying
R 15 Million
8 Months - Project Start June 2018 –
Completion January 2019
Employer: DA Realty (Pty) Ltd Employer’s Representative: Lily Eskandri Contact No.: +27 21 202 2274
Aurum Erf (685) & Erf (831) – Refurbishment of existing Hotel for
new Apartments
Quantity Surveying
R 667 Million
24 Months - Project Start June 2016 –
Completion January 2019
Employer: Shutters Group Employer’s Representative: Daryl Sher Contact No.: +27 21 443 7600
Rugley Road - Construction of New
Residential Apartments
Quantity Surveying
R 22 Million
12 Months - Project Start March 2018 –
Completion February 2019
Page | 57
CURRICULUM VITAE OF LDM GROUP
EMPLOYER, CONTACT PERSON AND TELEPHONE
NUMBER, WHERE APPLICABLE
DESCRIPTION OF WORK (SERVICE) SERVICE PROVIDED VALUE OF PROJECT
(INCLUDING V.A.T.) DATE COMPLETED
Employer: Ingenuity Properties Employer’s Representative: Arnold Maresky Contact No.: +27 21 674 5130
117 Strand Street – Mix use developments
Quantity Surveying R 423 Million
32 Months - Start Oct 2016 - Completion June
2019
Employer: Boki Property Investments (Pty) Ltd Employer’s Representative: Arnold Maresky Contact No.: +27 21 674 5130
119 Victoria Road – Bali Cove – Construction of a
New Residential Development
Quantity Surveying
R 40 Million
13 Months - Project Start Nov 2016 –
Completion Dec 2019
Employer: PGWC Employer’s Representative: Phaphama Mdladlana Contact No.: +27 21 483 5163
Maintenance Projects
Quantity Surveying
R 25 Million
36 Months Project Start Oct 2017 – Completion
Sept 2020
Employer: ARG Employer’s Representative: Allistair Rendall Contact No.: +27 21 448 2666
IRT PHASE 2A
Quantity Surveying
R 590 Million
180 Months Project Start Feb 2017 –
Completion Feb 2032
Employer: Provincial Government Western Cape Employer’s Representative: Gerrit Kemp Contact No.: +27 21 483 3038
Manenberg G.F. Jooste Hospital – Demolitions
of the existing buildings including the electrical,
sewer, etc. infrastructure
Quantity Surveying
R 500 Million
ON HOLD
Page | 58
CURRICULUM VITAE OF LDM GROUP
EXPERIENCE IN FAST TRACK PROJECTS
Name of Project Client Project Description
Approximate Project Value
Project Location
Project Timescale Project Status
Cape Town International –
Integrated Terminal
Airports Company South Africa
New Terminal Facility R 917 Million Cape Town,
Western Cape 30 Months Construction Stage
Cape Town International Arrival
Terminal
Airports Company South Africa
New Terminal Facility R 120 Million Cape Town,
Western Cape 24 Months Complete - 1999
University of Western Cape – Life Sciences
Building
University of Western Cape
New faculty Building and Learning Centre R 315 Million Cape Town,
Western Cape 24 Months Construction Stage
Athlone Stadium Redevelopment – North
Stand City of Cape Town
Alterations and Additions to Existing
Stadium R 56 Million Cape Town,
Western Cape 12 Months Complete - 2009
Athlone Stadium Redevelopment – South
Stand City of Cape Town
Alterations and Additions to Existing
Stadium R 45 Million Cape Town,
Western Cape 24 Months Construction Stage
Athlone Stadium Redevelopment – East
Stand City of Cape Town
Alterations and Additions to Existing
Stadium R 62 Million Cape Town,
Western Cape 24 Months Complete - 2007
Phillipi Stadium
Provincial Government Western Cape – Public Works
Department
New Stadium Facility R 20 Million Cape Town, Western Cape 4 Months Construction
Stage
Cape Town Station Revitalisation
South African Rail Commuter
Corporation / Intersite
Alterations and Additions to Existing
Station Facility R 200 Million Cape Town,
Western Cape 16 Months Construction Stage
Lebombo Border Post Department of Public Works – National
Proposed Upgrade of Lebombo Joint
Border Post R 1.2 Billion Mpumalanga
Province 24 Months Procurement Stage
Orlando Stadium City of Johannesburg Construction of a New Stadium R 320 Million Orlando,
Gauteng 22 Months Construction Stage
Page | 59
CURRICULUM VITAE OF LDM GROUP
EXPERIENCE ON UTILIZING GREEN BUILDING DESIGN TECHNIQUES & SUSTAINABLE ARCHITECTURAL TECHNIQUES (LDM)
Name of Project Client Project Description
Approximate Project Value
Project Location
Project Timescale Project Status
Eskom Office Eskom Properties New Office R 550 Million Sandton, Gauteng 24 Months Procurement
Stage
Hlabisa Hospital Independent Development Trust Hospital Upgrade R 200 Million Kwazulu - Natal 20 Months Procurement
Stage
Kwamashu Police Station
Department of Public Works – National
Police Station Upgrade R 60 Million Kwazulu - Natal 18 Months Procurement
Stage
Community Residential Units
Ethekwini Municipality
New Community Residential Units R 150 Million Durban, Kwazulu
Natal 12 Months Construction Stage
New Durban Stadium Ibhola Lethu Consortium New Durban Stadium R 2.5 Billion Durban, Kwazulu
- Natal 29 Months Complete - 2010
Sibaya Casino Sun International (Singatha Afrika
Management Services) Sibaya Casino R 400 Million Durban, Kwazulu
- Natal 18 Months Complete - 2007
SARS Alberton Regional Offices
South African Revenue Services
SARS Alberton Regional Offices R 230 Million Alberton,
Gauteng 12 Months Complete – 2007
SARS Albany House Project (P1 & 2)
South African Revenue Service
SARS Albany House Project (P1 & 2) R 110 Million Durban, Kwazulu
- Natal 7 Months Complete - 2007
SARS Megawatt Park Project
South African Revenue Service
SARS Megawatt Park Project R 153 Million Sandton,
Gauteng 7 Months Complete – 2005
Programme, Manage and Expedite
Expenditure for SAPS Projects
Department of Public Works
Programme, Manage and Expedite
Expenditure for SAPS Projects
R 500 Million Various Location in South Africa 18 Months Complete - 2007
SARS Siyakha Programme
South African Revenue Services
SARS Alberton Regional Offices R 1.6 Billion Alberton,
Gauteng Various Various
Page | 60
CURRICULUM VITAE OF LDM GROUP
• BP Head Office Cape Town – R 250 Million • Accord Peace Centre Durban - R 200 Million • Moses Mabhida Stadium – R 2.5 Billion • University Zululand – Proposed New Richards Bay Campus – R 60 Million • Pan African Parliament – R 395 Million
EXPERIENCE IN PROJECT MANAGEMENT SOFTWARE • Microsoft Project • Primavera • Project Scheduler • CCS – Construction Computer Software • TeamworkPM
EXPERIENCE IN FINANCIAL CONTROL & MANAGEMENT (LDM) • ICC Arena - R 500 Million • Amanzimtoti - Estuary Shopping Centre - R 250 Million • Accord Peace Centre: Conflict Resolution Meeting Centre - R 200 Million • SARS Branch Office Remedial Works Project - R 64 Million • Department of Transport Office Developments - R 25 Million • Sibaya Casino for Sun International - R 400 Million • Gateway Shopping Centre - R 600 Million • Monte Casino – Gauteng - R 500 Million • Sandton Convention Centre - R 200 Million • Deloitte & Touché Offices - R 30 Million • Kokstad Prison - R 300 Million • International Convention Centre – Durban - R 200 Million
SPECIFIC EXPERIENCE IN PROVIDING CONTACT MANAGEMENT AND ADVISORY SERVICES • Gateway Shopping Centre – R 600 Million • SARS Siyakha Programme – R 520 Million • Sibiya Casino For Sun International – R 400 Million • SARS Gauteng South Office & Semi – Warehouse Storage Facilities Project - R 200 Million • Sandton Convention Centre – R 200 Million • Storage Facilities Project – R 200 Million • SARS Branch Office Remedial Works Project – R 64 Million • Deloitte & Touche Offices – R 30 Million • Department of Transport Office Developments – R 25 Million
Page | 61
CURRICULUM VITAE OF LDM GROUP
EXPERIENCE IN PROVIDING SPACE PLANNING • SARS Gauteng Siyakha Programme (+/- 50 Offices) – 10 000M2 • SARS Gauteng South Offices & Semi – Warehouse Storage Facilities Project – 40 000M2 • SARS Megawatt Project – 40 000M2 • SARS Albany House – 18 000M2 • SARS Revenue Building – Beaufort West – 1 000M2 • SARS Cape Town Branch Office – 1 000M2 • SARS George Cape Branch Office – 500M2 • SARS Mossel Bay Branch Office – 300M2 • SARS P166 Enforcement Centre – 1 000M2 • SARS Sable Centre – 5 000M2 • SARS Worcester Branch Office – 200M2 • SARS Alberton Branch Office – 1 000M2 • SARS Carlton Centre – Level 200 – 3 000M2 • SARS Ashlea Gardens – 2 000M2 • SARS Trescon Building – 3 000M2 • University of Zululand, Richards Bay City Campus – 5 000M2
EXPERIENCE IN PROVIDING INTERIOR DESIGN SERVICES • SARS Gauteng Siyakha Programme (+/- 50 Offices) – 10 000M2 • SARS Gauteng South Offices & Semi – Warehouse Storage Facilities Project – 40 000M2 • SARS Megawatt Project – 40 000M2 • SARS Albany House – 18 000M2 • SARS Revenue Building – Beaufort West – 1 000M2 • SARS Cape Town Branch Office – 1 000M2 • SARS George Cape Branch Office – 500M2 • SARS Mossel Bay Branch Office – 300M2 • SARS P166 Enforcement Centre – 1 000M2 • SARS Sable Centre – 5 000M2 • SARS Worcester Branch Office – 200M2 • SARS Alberton Branch Office – 1 000M2 • SARS Carlton Centre – Level 200 – 3 000M2 • SARS Ashlea Gardens – 2 000M2 • SARS Trescon Building – 3 000M2 • University of Zululand, Richards Bay City Campus – 5 000M2
Page | 62
CURRICULUM VITAE OF LDM GROUP
EXPERIENCE IN PROVIDING MOVE MANAGEMENT • SARS Gauteng Siyakha Programme (+/- 50 Offices) – 10 000M2 • SARS Gauteng South Offices & Semi – Warehouse Storage Facilities Project – 40 000M2 • SARS Megawatt Project – 40 000M2 • SARS Albany House – 18 000M2 • SARS Revenue Building – Beaufort West – 1 000M2 • SARS Cape Town Branch Office – 1 000M2 • SARS George Cape Branch Office – 500M2 • SARS Mossel Bay Branch Office – 300M2 • SARS P166 Enforcement Centre – 1 000M2 • SARS Sable Centre – 5 000M2 • SARS Worcester Branch Office – 200M2 • SARS Alberton Branch Office – 1 000M2 • SARS Carlton Centre – Level 200 – 3 000M2 • SARS Ashlea Gardens – 2 000M2 • SARS Trescon Building – 3 000M2 • University of Zululand, Richards Bay City Campus – 5 000M2
Page | 63
CURRICULUM VITAE OF LDM GROUP
PROCUREMENT ADVISORY EXPERIENCE (LDM)
LDM Consulting (Pty) Ltd has provided procurement advisory for various contracts utilizing various procurement methodologies and contract types, such as negotiated, lump-sum, managed, cost plus, turnkey, activity based and with quantities contracts. The form of contracts includes, but is not limited to: NEC Form of Agreement JBCC Form of Agreement GCC Form of Agreement FIDIC Form of Agreement Some of the projects include the following:
PROJECT DESCRIPTION PROJECT VALUE PRICING STRATEGY FORM OF AGREEMENT
Eskom Offices 7 Parkade R500 Million (Total) Bills of Quantities NEC
RDPS Projects in Eastern Cape R100 Million Managed & Target Cost NEC
Eskom Offices, Storage, Workshops and Stores at Paul Petersburg R8 Million Bills of Quantities NEC
Eskom Offices, Storage, Workshops and Stores at Pongola R8.5 Million Bills of Quantities NEC
Eskom Offices, Storage, Workshops and Stores at Ladysmith R9.5 Million Bills of Quantities NEC
Eskom Offices, Storage, Workshops and Stores at Dundee R9.5 Million Bills of Quantities NEC
Eskom New Offices (Sandton) R550 Million Bills of Quantities NEC
Eskom Offices, Storage, Workshops and Stores at Matatiele R11 Million Bills of Quantities NEC
Eskom Newcastle Technical Service Centre R23 Million Bills of Quantities NEC
Eskom Mbizana Tachnical Service Centre R20 Million Bills of Quantities NEC
Eskom Madadeni Technical Service Centre R24 Million Bills of Quantities NEC
Eskom Eric Space Planning R200 Million Bills of Quantities NEC
Eskom Megawatt Park Upgrade – Space Planning & Refurbishment R500 Million Bills of Quantities NEC
Page | 64
CURRICULUM VITAE OF LDM GROUP
FACILITIES MANAGEMENT ADVISORY EXPERIENCE (LDM)
The LDM Group has a specialist Facilities Management Division, namely, LDM Facilities Management Services (Pty) Ltd (LDMFM). LDM FM, a platinum SAFMA member with Accredited Facilities Professionals. The directors serve on the SAFMA board and are participants of the SABS Technical Work Group (TG267) tasked with drafting at an international level of the ISO 41001 (Facility Management Standard) and the local SANS 1752 (Facilities Management Standard). Our service offering encompasses technical (maintenance of building fabric, engineering plant, etc.), non-technical services (cleaning, hygiene, landscaping, etc.) and a fully automated Facilities Management Solution. This systemized approach if implemented, can be customized to manage all our client’s processes and standard operating procedures. LDM FM also assists with our client’s non-core, but essential business activities of operations and administrative, thereby contributing to the overall business efficiency. These support services are not just significant to comply with Health, Safety and Environmental Legislation, but also as a measure for identifying, controlling and minimizing the cost of operating a facility or a portfolio of facilities. Portfolio of clients includes the following:
University of Kwa-Zulu Natal South African Revenue Service Durban University of Technology – Proposed New Student Housing Various LDM Group Offices & Investment Projects Kwa-Zulu Natal Department of Public Works National Department of Public Works First National Bank Tsebo Facilities Solution / Inkosi Albert Luthuli Hospital University of Zululand La Bamba Holdings Zatovect (Pty) Ltd EXPERIENCE IN AUDITING CONSULTANT FEE ACCOUNTS AND MANAGEMENT OF CONSULTANTS (LDM)
LDM Consulting (Pty) Ltd major experience in auditing fee accounts and management of consultants include inter alia the following projects:
SARS Siyakha Program – R520 Million SARS BCIP Program – R229 Million UKZN Merger Projects – R450 Million University of Zululand – Proposed New Richards bay campus – R60 Million Department of Public Works SAPS Projects – R200 Million South African Post office Roll – Out & Mail Centre Projects – R250 Million Department of Public Works – FARS - R20 Million National Department of Public Works – PMTE – R19 Million First National Bank – Systemization – R30 Million Drake and Scull – Facilities Management – R1 Million
Page | 65
CURRICULUM VITAE OF LDM GROUP
OTHER MAJOR PROJECT SPECIFIC EXPERIENCE PER PROJECT TYPE
The LDM Group has participated in various projects, which include amongst others the following:
PROJECT DESCRIPTION PROJECT VALUE
COM
MER
CIA
L
PRO
JECT
S
RETA
IL &
ASS
OCI
ATE
D
PRO
JECT
S
RES
IDEN
TIA
L PR
OJE
CTS
CON
VEN
TIO
N C
ENTR
ES
ENTE
RTA
INM
ENT,
CA
SIN
O’S
AN
D
LEIS
URE
HEA
LTH
CA
RE
SPO
RTS
FACI
LITI
ES
CON
SULT
ING
SER
VIC
ES
SPEC
IALI
ZED
BU
ILD
ING
S &
IN
FRA
STRU
CTU
RE
New Durban Stadium R 2,5 Billion
Gateway Shopping Centre R 600 Million
UKZN Merger Projects – Financial Management R 520 Million
Monte Casino R 500 Million
Sibaya Casino for Sun International R 400 Million
Pearls of Umhlanga Residential Development R 300 Million
UKZN Student Residences R100 Million
Sandbush Willows R100 Million
Estuary Shopping Centre - Amanzimtoti R 250 Million
SARS Gauteng South Office & Semi-Warehouse storage facilities project
R 230 Million
Accord Peace Centre R 200 Million
International Convention Centre – Durban R 220 Million
Sandton Convention Centre R 200 Million
SARS Megawatt Park Project R 153 Million
Durban Film City R140 Million
New Diamler Chrysler Showroom – Durban R 120 Million
SARS Albany House Project R 110 Million
Amanzimtoti Town Centre Development Framework Plan R100 Million
Umhlanga Town Centre Framework Plan R120 Million
Multi-Storey Parkade for ACSA – Durban R 100 Million
Investec Offices – Cape Town R 90 Million
Ambrose Park Development R 60 Million
Umgeni Business Park R 60 Million
Deloitte & Touché Offices R 30 Million
Department of Transport Office Developments R 25 Million
Cato Manor Development Association Offices (CMDA) R 20 Million
IDT – J.B. Marks Community Health Centre R 34 Million
Nkosi Albert Luthuli Hospital R 400 Million
Page | 66