MAIN GLU-LAM BEAMS 200X600MM SPANING THE ENTIRE ROOF WHICH STRAP TO THE CLT VIERENDEEL WALL THAT TIE BACK TO THE MAIN CLT AUDITORIUM STRUCTURE
SERIES OF I-JOISTS SPANING IN BETWEENTHE BEAMS AND THE WALLS AT 600 CTRS.
BESPOKE SKYLIGHT WITH SCHUCO TRANSOMS. HARDENED LAMINATEDGLASS IS TO BE MASTICLY SEALED WITH STRUCTURAL MASTIC SEAL ASPER MANUFACTURERS SPECIFICATION AT HORIZONTAL AXIS TO ALLOW WATER RUNOFF.
200MM CLT VIERENDEEL WALL
15MM OSB TO BE FIXED ON TOP OF BEAMS TOCREATE LEVEL PLANE TO LAY SPECIFIED TAPEREDPIR INSULATION OVER AT FALLS 1:60
250MM GGBS CONCRETESTAIR CORE CORE
BESPOKE RIB CAGE CORNER SYSTEM COMPOSING OF A SERIES OF GLUE-LAM BEAMS WEBBED TOGETHER DESIGNEDFOR THE SOLE PURPOSE OF AIDING TO COUNTERACTBENDING MOMENT AT THE FAR REACH OF THE CONTILEVEREDVIERINDEEL WALL STRUCTURES.
200MM CLT VIERENDEEL WALLTO BE STRAPPED BACK TO 250MM CLT AUDITORIUM WALLWITH GALVINISED STEEL BRACKETS AND BESPOKE GALVINISED STEEL SHELVING BRACKETS
CUSTOM CUT 200MM CLT FLOOR SLAB MEMBERTHAT SIT ABOVE POST AND BEAM STRUCTUREAT FOYER
150MM CONCRETE KICKERS ARE TO BE CAST WHERE CLT WALLS / BLU-LAM POSTSAREA TO BE ERECTED.
200MM CLT ROOF PANELS TO BEBRACKETED DOWN TO CLT WALLS.THICKNESS SHOWN INCLUDES INSULATION
Checked byDesigned By Approved By - Date
Project Address/Coordinates
Scale
Project Name
Sheet Name
Rev No Rev Note Date/Time North Checked
1 2 3 4 5 6 7 8 9 10 11 12 13
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
Nabil Ghnewa C13470042 DT175 02 2017
Sheet Number
Naul Village Dublin53.586°N 6.290°W
14
LEGEND
GENERAL DESIGN NOTES
KEY PLAN
08/01/2018 21:43:17
1 : 500
DT175 TDS MusicCentre Project
STRUCTURAL MATRIX
A115
NABIL GHNEWA JIM ROCHE JIM ROCHE
JIM ROCHE
STRUCTURAL MATRIX
BAUDER BIODIVERSE ROOFPRODUCT SPECIFICATION
POSI GLAZE FRAMELESS GLASSBALUSTRADE GUIDE
KLH CLT SPECIFICATION GUIDE
FIRE PIPE COLLARB150
GUTEX MULTITHERM
ROCK PANNEL INSTALLATION GUIDE
INSULATED SUSPENDED CEILING
RHEINZINK REVEAL PANNEL GUIDE
CLT TO BE FITTED TO MANUFACTURERS SPECIFICATION UTILISING GLVINIZED STEEL BRACKETS. EACH PANNEL RESTING ON CONCRETEKICKER TO HAVE LAYER ON DPC UNDERNEATH TO PROVENT RISING DAMP FROMENTERING THE STRUCTURE.
GUTEX WALL WOOD FIBRE BOARD
FOLLOWING ON-CENTRE DISTANCES APPLY:40 MM BOARD THICKNESS → MAX. ON-CENTRE IS 62.5 CM60 - 200 MM BOARD THICKNESS → MAX. ON-CENTRE IS 83.5 CM
ALL MEMBRANES ARE TO BE TAPED AND PIPES THAT PUNCTURE THROUGHTHE MEMBRANES ARE TO BE SEALED WITH MANUFACTURERS SUPPLIEDTAPE TO ENSURE CONTINUITY AIR AND WATER TIGHTNESS AT ROOF LEVEL.
ALL PERFERATIONS THROUGH VAPOUR PERMEABLE MEMBRANE ARE TOBE TAPED TO ENSURE INTEGRITY OF MEMBRANE AND VAPOUR DIFFUSION RATE.
WINDOW FRAME TO HAVE PLASTIC THERMAL BREAK PACKER BETWEEN ALUMINIUM FRAME AND CLT WALL TO PREVENT POTENCIAL CONDINSATIONOCCURENCE BETWEEN BOTH MATERIALS WITH WIND PROOF TAPE TO BE APPLIEDTO PREVENT THERMAL BRIDGING.
TAPRED PIR IS TO BE INTALLED TO MANUFACTURERS SPECIFICATION AND AT A FALLOF 1:80.
SUSPENDED ACOUSTIC CEILING PANNELS ARE TO BE HUNG LEVEL IN ACCOURDANCETO MANUFACTURERS SPECIFICATION.
FIRE COLLARS ARE REQUIRED FOR EVERY PIPE THAT MAY PENETRATE A FLOOROR WALL. FIRE COLLARS SUPPLIED WITH DIFFERENT SIZES DEPENDING ON PIPESIZE ARE TO FITTED TO MANUFACURERS SPECIFICATION.
ALUMINIUM RAIN WATER PIPES THAT ARE TAKEN THROUGH THE BUILDING MUST BE INSULATED AND HIDDEN BEHIND THIN CLT WALL TO MAINTAIN CONTINUITYIN THE AESTHETIC EFFECT AND CONTRIBUTE TO THERMAL MASS EFFECT.
WHEN INSTALLING ROCKPANEL BOARDS ONALUMINIUM LOAD-BEARING SECTIONS, FXED POINTS,SLOTTED HOLES AND MOVING POINTS SHOULD BE APPLIED. BY APPLICATIONSOF FXED POINTS AND MOVING POINTS THE FXED POINTS SHOULD BEPRE-DRILLED WITH Ø 5.2 MM, SLOTTED POINTS Ø 5,2 X 8 MM AND THEMOVING POINTS WITH Ø 8 MM. THE SLIDING ATTACHMENT MUST BE DONEWITH A ‘RIVET SPACER’ SO THAT THE ATTACHMENT CAN MOVE EASILY.INSTEAD OF DRILLING FX POINTS AND SLOTTED HOLES ALSO FX-POINT SLEEVESAND SIDE SLEEVES CAN BE USED TO ACHIEVE THE REQUIRED HOLES.CONTACT THE ROCKPANEL GROUP FOR MORE INFORMATION.
PURE VISTA OR (E/A) GLASS BALUSTRADE .
THE MEGAGRIP BASE RAIL SHOULD BE PLACED ONTO ITSDESIGNATED POSITION AND THE HOLES MARKED ON THESUBSTRATE FOR DRILLING. ONCE THE SHOE IS LEVEL INSERTTHE FIXINGS AND TIGHTENED UP TO MAKE THE CHANNELRIGID. THE FIXINGS MUST BE TIGHTENED IN ACCORDANCEWITH THE MANUFACTURERS INSTRUCTIONS.M12 COUNTERSUNK BOLTS MUST BE USED.