DELAY IN GOVERNMENT CONSTRUCTION PROJECTS,Types & Causes

Prepared by: :Twana Ahmed Xeyat.Civil Engineer (1996-2000)Master of Business Administration(2013-2015) , twana.ahmed@alumni.auis.edu.krd , 07701528521

INTRODUCTION Definition Types Factors & Causes Impacts Conclusion

• To make something happen later than expected,or to be performed later than planned.

• A situation where the contractor and the project owner jointly or severally contribute to the non-completion of the project within the agreed contract period.

Delay Definition

Types Of Delay :

1. Critical & non Critical Delay:

• Critical delays� : Prevent the contractor from finishing the work on the scheduled completion date

• � Non critical delays: affect the progress of the work.

2. Excusable Or Non Excusable Delay:

Excusable Delays:� Unpredicted

1. �General labor strikes,Fires,Floods , Owner-directed changes.

2. �Errors & omissions in the plans and specifications.

3. �Differing site conditions or concealed conditions.

4. �Usually sever weathers.

5. �Intervention by outside agencies.

2. Excusable Or Non Excusable Delay:Non excusable : �

1. �Late performance of subcontractors.2. �Untimely performance by suppliers.3. �Faulty workmanship by the contractor and subcontractors.4. �A project specific labor strike.

3. Compensable or Noncompensable Delay:

A compensable delay:� • Time extension • Additional compensation. • Only excusable delays can be compensable.

� A noncompensable delay: • Neither additional compensation nor a time extension.

Note: �Compensable depends primarily on the terms of the contract.

But in most cases:Does not receive any additional money but time extension.

4.Concurrent or Non Concurrent Delay:

• Two or more delays that occur or overlap within the same period,

• One an employer risk event, the other a contractor risk event

• The effects of which are felt at the same time.

Factors and Causes of Delay :

1. Internal Factors

2. External Factors

Delay Factors

Internal Factors

Consultant Related

Contractor Related

Design Related

Client Related

Labor Related

Material Related

Equipment Related

External Factors

Natural Disasters, Government Laws,

Economic Conditions, etc.

Internal Related Factors of Delay

External Related Factors of Delay

Methodology Likert five-point scale ranging from 1 (Very Low) to 5 (Very High).

five point scale starting from (1 =Very Low), (2= Low). (3= High), (4= Medium) and (5 =Very High). The Relative Importance Indices (RII) is computed as follows;

Where,

W is the weighting given to each factor by the respondents starting from 1 to 5

A is the highest weight in the scale which is 5,

N is the total number of respondents (which is 47 people).

Impacts of Delay 1. Cost overrun.2. Overtime .3. Disputes.4. Lawsuits.5. Abandonement.

ConclusionDelays are inevitable( unavoidable);

But can be minimized by:● �Detailed Site Investigations.● �Careful monitoring and regular meetings.● �Effective site management.● Collaborative working and effective coordination.● �Careful scheduling.● �Full commitment to the project by all parties.

1] Construction Delay: Understanding them clearly, analyzing them correctly. Second edition by Theodore J. Trauner Jr.Ar25,2009 ,PP( 25-31) [2] Construction Project Delays: Assessing the Effectiveness of Supervisor Paperback – May 2, 2013by Najat Krima (Author)[3] Analysis of Construction Project Delays and Cost overruns: Construction Projects in Universities and Higher Education Institutes of Pakistan as Case Study Paperback – April 9, 2014by Attaullah Shah  (Author)[4] Factors Causing Delay in Construction Projects: Delay and Speed Factors of Construction Projects in Malaysia Paperback – January 3, 2012 by Wa'el Alaghbari (Author)[5] Enshassi, A., Hallaq, K. and Mohamed, S. (2006). Causes of contractor’s business failure in developing countries: the case of Palestine. Journal of Construction in Developing Countries, Vol. 11, No. 2. [6] Chitkara, K. (2004). Construction Project Management, Planning, Scheduling, and Controlling. Tata McGraw Hill, 4th edition, India.

[7] Gündüz, M., Nielsen, Y., and Özdemir, M., 2013, Quantification of delay factors using the relative importance index method for construction projects in Turkey, Journal of Management in Engineering, 29(2), pp. 133–139. [8] Hemanta, D., Anil, S., Iyer, K. C., and Sameer, R. 2012, Analysing factors affecting delays in Indian construction projects, International journal of Project Management, 30(4), pp. 479 – 489. [9] Aibinu, A. A., and Odeyinka, H. A., 2006, Construction delays and their causative factors in Nigeria, Journal of Construction Engineering and Management, 132, pp. 667–677.

Refrences

THANKS