Design & Engineering Team. Presentation on Developing Borough Infrastructure – Northwold Road 2013/14. Supported by Chris proctor- Team Manager Andrew Pillai – Senior Engineer. Presented By Ugo Ihesiene Principal Road Safety Engineer. Why are we doing this?. Awareness Staff engagement - PowerPoint PPT Presentation

TRANSCRIPT

Design & Engineering Team

Presentation on Developing Borough Infrastructure – Northwold Road 2013/14

Presented By

Ugo IhesienePrincipal Road Safety Engineer

Supported byChris proctor- Team Manager

Andrew Pillai – Senior Engineer

Why are we doing this?

Awareness Staff engagement Sharing of ideas & experiences Developing a better scheme Collaborative/joined up working

Coverage/Scope

Introduction Scheme Background Proposals Consultations/Approvals Implementation Questions & Discussion

Introduction (Overview)

Northwold Road location/ward Amenities – schools, bus route, shops,

recreational park etc. Road collision data Current collision reduction measures

Scheme Background

Why are we considering proposal in Northwold Road? To upgrade the public realm, traffic calm, assist in improving and regenerating the area

Funding – The scheme is a newly developed proposal. It was not included in the 2011 LIP and it is funded from Developing Borough Infrastructure

Delivery – 2013/14 financial year

Proposals – Widening of pavements & Entry Treatments

Reighton Road Durlston Road Norcott Road

Proposals – Entry Treatments

Narford Road Rossington Street Gelderston Road (2

sides) Alconbury Road Alkham Road

Junction Tables

Kyverdale Road

Miscellaneous

Maintenance: Review existing tactile

paving at crossing point O/S NW Primary school & re-align to approved standard

Review existing speed table O/S NW Primary school & amend ramp gradient to approved standard

Miscellaneous (Cont.)

De-clutter Street Signs: On & opposite Alkham

road

Miscellaneous (Cont.)

Other Safety improvements:

Adjust bus Stand east of Alkham Road in easterly direction to improve visibility.

SUDs – We have not yet considered – Needs Input from Adam

Where do we go from here?

Senior Management/Lead Member Draft approval of proposals

Stakeholders Draft consultation Public Consultation Decision Audit approval Traffic Regulation Order Public Notification of works Implementation

QUESTION TIME

?

Your contributions are welcome:

Speak to Chris, Andrew, or me E-mail us if you prefer Show examples of any better ideas you may

have come across.

FURTHER INFORMATION

Any questions or further information please e-mail to one of us at:

ugo.ihesiene@hackney.gov.uk

Andrew.pillai@hackney.gov.uk

Chris.proctor@hackney.gov.uk

THANK YOU!