developing a strong environmental management program

Post on 16-Jan-2022

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

The Elizabeth River Tunnels Project

Midtown Tunnel

Developing a Strong Environmental Management Program

2

Project Overview

3

4

5

6

Safety, Health and Environmental Management System (SHEMS):

7

8

Environmental Compliance Program:

9

Environmental Studies

− Phase 1 Environmental Study

− Phase 2 Environmental Study

− Habitat study of the Elizabeth River

10

Planning

− Env. Check list was used when developing work plans

− Env. Manager must sign off on all work plans. − Include all Env. concerns

− SPCC and SWPPP signature pages

− Include specs and standards of E&S controls

− Attend prep meetings and kickoffs

Meetings

− Environmental Coordination Meeting − Every other week there was a meeting held between ERC and

VDOT (Project Owners)

− Once a month there was a field inspection with ERC and VDOT (Project Owners)

− Regulatory Agency Meeting − Held every quarter with those having permit or ownership over

the project

− ERC/VDOT (Project Owners)

− Army Corps

− VA Department of Environmental Quality

− VA Marine Resources Commission

− US Coast Guard

PLANS

− Environmental Management Plan (EMP)

− Areas Specific Environmental Management Plan

(ASEMP)

− Stormwater Pollution Prevention Plan (SWPPP)

− Spill Prevention Control and Countermeasure

(SPCC)

− Hazardous Material Management Plan (HMMP)

− Shipboard Oil Pollution Emergency Plan (SOPEP)

Slide 14

PERMITS

− Joint Permit Application (JPA)

− Virginia Pollution Discharge Elimination System

(VPDES)

− Virginia Stormwater Management Permit (VSMP)

− General Construction Permit

15

JPA

4/4/2012

Slide 16 Footer

JPA - Marine Water Quality Monitoring − Plan

− Locations − Monitoring & Background

Up & Down river (6)

− VPA Oyster Reef (2)

− 5T (5)

− Turbidity, DO, pH, Depth, Temp, Salinity

− Data reviewed every day for compliance w WQ standards

− Calibrated before each use

4/4/2012

Slide 17 Footer

JPA - Marine Water Quality Monitoring

− BMPs

− Turbidity curtains

− Expanded lateral monitoring

stations 2/15-6/15

− Adds 16 locations

− Environmental bucket

− Vibratory Hammer

− Underwater Sound

Monitoring

4/4/2012

Slide 18 Footer

JPA - Photo Monitoring

− Monitored 24 locations for areas of impacted and avoided wetlands and waters of the US

− Monthly reports to permit agencies

4/4/2012

Slide 19 Footer

VPDES

Slide 20

VPDES

− De-watering of

Approach Cofferdams

in Portsmouth &

Norfolk

− Modified to Include:

− Non-contact Concrete

Cooling Water System

− De-watering of ponds

for MLK

4/4/2012

Slide 21 Footer

VPDES

− Regular monitoring of wells and system checks

− Test for pH, TSS, Temp, Flow, TPH, Metals, Pesticides

− Take samples every month for lab analysis

− Submit results through eDMR

− Automatic wqm system: allows for adjustment of pH and TSS

4/4/2012

Slide 22 Footer

SWPPP

23

24

Perimeter controls included silt fence or

the use of other methods such as filter

cloth wrapped bin blocks and stone

berms,

Stock Pile Controls

Construction Entrances

25

Truck Wash

26

Slide 27

Challenges & BMPs

Slide 28

Dredging operations were

conducted using an

environmental bucket

whenever possible.

Dredging operations removed

over 20,000 tons of TPH

contaminated soil from the

Elizabeth River.

Slide 30

The project designed and used

a bin block system to build a

decanting system to dewater

dredge material.

The system successfully removed

the material from the water allowing

only clean sediment free water to be

discharged.

The project removed

1,000’s of piles from

the Elizabeth River

– Many creosote

The project chose to

perform insitsu treatment

of lead contaminated

soil.

Using this method

reduced hazardous

waste.

Treatment was a lower

cost then shipping off as

hazardous waste.

The project utilized a self

contained tire wash system.

The system reduces the

risk of environmental

violations

The project utilized filter

fabric rapped bin blocks and

a stone berm for stock pile

protection.

Using this method provides

stronger protection then

wattles, hay bales, or silt

fence.

This method also needs little

to no maintenance and can

be used in high traffic areas.

The project used an

aerosol can puncturing

system to manage its

can waste.

The system reduced

hazardous waste

Saves $33,000 per 4,400

cans

The project

used self

contained

concrete wash

out systems

These systems

reduce the risk

of an

environmental

violation.

The project required that

all oil spills no matter

volume are reported to

EM.

4 page report done on all

spills.

Inspection of hoses and

equipment daily.

The project used gator grates

to protect their inlets. The

gator grates filter the water

and are easy to clean and

install.

The project also used

multiple protection in areas

of high traffic and disturbed

areas.

4/4/2012

Slide 40

Take a picture with their

nearest spill kit.

Project Wide Clean Up

4/4/2012

Slide 41

Green Thumb. Grow a

tomato plant.

Spell out “SKW” using

recyclable products.

4/4/2012

Slide 42

Bike Show.

Crew Lunch.

CLEAN THE BAY DAY ELIZABETH RIVER CLEAN-UP

Clean the Bay Day

− Annual Clean the Bay Day

− Sponsored by the Chesapeake Bay Foundation, VPA and CSX

− Takes place along the Elizabeth River in Norfolk near Plum Point Park. Volunteers cleaned up along the river, Plum Point Park, ERT, and APM Beach.

− Approximately 3 tons of trash collected

− Approximately 200-250 Volunteers

− 60 - 70 SKW Employees and their Families

Homemade ice cream was made by

SKW’s own Henry Wood, and

Skanska’s own Mr. Gray.

The ice cream was

delicious and enjoyed

by everyone!

ERP / Oyster Reefs & Gardening

4/4/2012

Slide 48 Footer

4/4/2012

Slide 49

The project worked

with the Elizabeth

River Project to make

oyster blocks using

waste concrete from

the project.

Sustainability

The project

recycles or

reuses more than

98% of all its

construction

waste.

50

Awards

52

− Virginia Port Authority Green Operations – Gold

− DEQ – Virginia Environmental Excellence

Program(E-4)

− Governor’s Environmental Excellence Award

− City of Norfolk Environmental Award

− Elizabeth River Group

− River Stars Program Model Business (2015)

− Envision Program

Environmental Accomplishments

− Governors Environmental Excellence Award − silver

− Virginia Environmental Excellence Program (VEEP) − E4 Status

4/4/2012

Slide 53 Footer

Environmental Accomplishments

− ERP, River Star

Businesses Program

− Model Level

− Port of Virginia

− Operation Green

4/4/2012

Slide 54 Footer

Questions?

Carissa Agnese Skanska

SE Regional Environmental Manager

carissa.agnese@skanska.com 757-692-2872

56

top related