101© MERVENTO

3.5.2011

RePower 3.XM

3,3 MWGeared turbineRotor diameter 104 mPrototype erected late 2008Nacelle + rotor 160 t

102© MERVENTO

3.5.2011

RePower 3.XM

103© MERVENTO

3.5.2011

RePower 5M

5 MWRotor diameter 126 mShaft with two bearings, CARB in front, spericalroller bearing in rearTwo helical planetary stage and one spur gear stage gearboxgearboxNacelle 290 tRotor 120 tRotor 120 tTotal weight nacelle + rotor 410 t410 tNacelle width 6 m, height 6 m and length 18 m

104© MERVENTO

m and length 18 m3.5.2011

RePower 5M

105© MERVENTO

3.5.2011

RePower 5M

106© MERVENTO

3.5.2011

RePower 5M

107© MERVENTO

3.5.2011

RePower 5M

108© MERVENTO

3.5.2011

RePower 5M

109© MERVENTO

3.5.2011

RePower 5M

110© MERVENTO

3.5.2011

RePower 5M

111© MERVENTO

3.5.2011

RePower 5M

112© MERVENTO

3.5.2011

RePower 5M

113© MERVENTO

3.5.2011

RePower 5M

114© MERVENTO

3.5.2011

Siemens SWT-2.3-101

2,3 geared turbine Prototype erected on October 2004Rotor diameter 101 mThree stage planetary helical gearboxFull power at wind speed 13-14

/m/sNacelle + tower 144 t

115© MERVENTO

3.5.2011

Siemens SWT-2.3-101

116© MERVENTO

3.5.2011

Siemens SWT-3.6-107

Prototype erected on October 2004Rotor diameter 107 mThree stage planetary helical gearboxFull power at wind speed 13-14 m/sN ll 135 tNacelle 135 tRotor 100 tTotal weight nacelle + rotor 235 tDirect drive 3,6 MW nacelle + rotor 265 tSiemens Wind is testing a direct d i i f th 3 6 MW

117© MERVENTO

drive version of the 3,6 MW.3.5.2011

Siemens SWT-3.6-107

118© MERVENTO

3.5.2011

Siemens SWT-3.6-107

119© MERVENTO

3.5.2011

Siemens SWT-3.6-120

Prototype to be erected in end of 2009Rotor diameter 120 mThree stage planetary helical gearboxFull power at wind speed 12-13 m/sS t ti l d 13Same rotational speed 13 rpm as for the 107 m rotor.

120© MERVENTO

3.5.2011

Siemens 3 MW Direct Drive

Generator in front of the towerA prototype erected first week of December 2009Rotor diameter 101 meterHollow fixed main shaftPermanent magnet generatorLiquid cooled generatorOuter rotor generatorHydraulic pitchy p

121© MERVENTO

3.5.2011

Siemens 3 MW Direct Drive

122© MERVENTO

3.5.2011

Siemens 3 MW Direct Drive

123© MERVENTO

3.5.2011

Siemens 3 MW Direct Drive

124© MERVENTO

3.5.2011

Siemens 3 MW Direct Drive

125© MERVENTO

3.5.2011

Siemens 3 MW Direct Drive

126© MERVENTO

3.5.2011

Siemens 6MW

Siemens i developing a 6MW di t d i f ff hdirect drive for offshoreAccording to lates articles 5MW. A di t fi iAccording to finacing sources 6MW.Market release probably in 2012Market release probably in 2012

127© MERVENTO

3.5.2011

Sinovel SL3000

Doube fedDeveloped by AMSC WindtecDeveloped also SL1500 and lately SL5000

128© MERVENTO

3.5.2011

Sinovel SL3000

129© MERVENTO

3.5.2011

Sinovel SL3000

130© MERVENTO

3.5.2011

Suzlon

Turbine power 10 MWDirect drive, probably down windGenerator diameter 25 m, speed 10 rpmRotor diameter 145 mSmartmotor AS makes the generator

131© MERVENTO

3.5.2011

Suzlon

132© MERVENTO

3.5.2011

Suzlon

133© MERVENTO

3.5.2011

Suzlon

134© MERVENTO

3.5.2011

Vensys 1,5 MW

Manufactured by GoldWind, I E CKDImpsa, Eozen, CKD, Direct drive permanent magnetPassive cooling of generator70 m and 77 m rotor diametersVensys 92 with 2,5 MW exists as well

135© MERVENTO

3.5.2011

Vensys 1,5 MW

136© MERVENTO

3.5.2011

Vensys 1,5 MW

137© MERVENTO

3.5.2011

Vensys 1,5 MW

138© MERVENTO

3.5.2011

Vensys 1,5 MW

139© MERVENTO

3.5.2011

Vensys 1,5 MW

140© MERVENTO

3.5.2011

Vensys 1,5 MW

141© MERVENTO

3.5.2011

Vensys 2,5MW

2,5 MW90 and 100 m rotor diametersDirect drive Permanent magnet generatorOuter rotor designClosed cooling systemSingle bearingg g

142© MERVENTO

3.5.2011

Vensys 2,5MW

143© MERVENTO

3.5.2011

Vensys 2,5MW

144© MERVENTO

3.5.2011

Vensys 2,5MW

145© MERVENTO

3.5.2011

Vestas V80/V90 – 1,8MW/2,0MW

1,8 and 2,0 MW Two rotor diameters, V80 and V90Two planetary stages and one helical stage gear boxT b i !Two bearings!Nacelle 68 tRotor 38 tTotal weight nacelle + rotor 106 t

146© MERVENTO

3.5.2011

Vestas V80/V90 – 1,8MW/2,0MW

147© MERVENTO

3.5.2011

Vestas V90

3 MW Two planetary stages and one helical stage gear boxSingle bearingPrototype erected in May 2002Series production starting from end 2004Nacelle 70 tRotor 41 tTotal weight nacelle + rotor 118 tAccording to unconfirmed information sold only as on-shore turbine.

148© MERVENTO

3.5.2011

Vestas V90

149© MERVENTO

3.5.2011

Vestas V90

All transformers exchangedAll gear boxes

dexcangedIt is a reality