Due to the overwhelming interest in the PreMODS bamboo plyboard International Building Standard certified disaster relief house, we have issued this media FAQ regarding its current deployment as a SUSTAINABLE social infrastructure and disaster relief asset. Contact info@peerlessgreen.net for more information or inquiries.

TRANSCRIPT

Prefabricated Modular Sustainable (PreMODS)- Disaster Relief Asset

FAQ:

PreMODS units delivered as a DRA: 425

PreMODS total DRA square feet in use: 270,450 sq ft

PreMODS first field use: 2004

Most recent relief installation: Leh, 2010

PreMODS use as an international disaster asset: Tsunami, Sri Lanka, Tsunami, Andaman Islands, Flood, Cloud Burst, Leh, Quake/ Landslide, Jammu KashmirSocial Dev't, Kashmir; Bihar; Tezpur

In-Field PreMODS (re Appropriate Constr. Tech): Dry Hot PlainsHot Humid JungleHigh Altitude- Snow to 1meter roof loadHigh-low Alt-Cold Wet: IS insulated coreHurricane Prone: rated to <150kmphEarthquake Prone: Tensile-Twist x2 wood

Total In-Field PreMODS DRA, Social and Conventional: 2,000+ units

PreMODS locations on India sub-continent:

Andhra Khammam/Hyderabad, Assam, Guwhati, Tezpur, Dinjam, Bodoland, Tripura, Agartala, Maharashtra Mumbai, Wardha, Uttaranchal Haldwani, Joshimath Yol Cantt, Delhi , Arunachal Ruksin, Pasighat, Remi Village, Lumla, Tawang, Nagaland Kisama, Dimapur, Andamans Port Balir, Carnicobar, Tamilnadu Thanjavur, Chennai, Uttar Pradesh Amethi, J&K Uri, Leh, Kargil, Srinagar, Rajasthan, Jaipur, Bikaner, West Bengal, Kalimpong, Dinhata, Manipur, Tamilong Distt, Bihar, Patna, Madhya Pradesh Jabalpur

Bhopal.

EXAMPLE FLOORPLANS

Did you Know? Only 50-75% of a felled tree can be used for plywood and takes 60 years to renew. 100% of

every bamboo pole is used for plyboard and takes only 6 months to renew. I.S. rated Bamboo plyboard has over double the tensile and rupture performance of conventional timber plywood.

INSTALLATIONS: as DISASTER RELIEF ASSET:

Medical Station, Kargil

Flood/Landslide Relief, LEH

High Altitude Relief Asset Deployment to post-Landslide Tent Village

INSTALLATIONS: as SOCIAL INFRASTRUCTURE ASSET:

Primary Schoolhouse , Arunachal Pradesh

Tech School J&K