Edmonds and Mukilteo StationsParking and Access Improvements
Fall 2019 Outreach Summary
1,700+ online open house visitors
499 completed surveys
60 attendees at two open houses
7,100+ mailers sent to homes and businesses
15,000+ email recipients
18,000 impressions on Facebook and Twitter
320+ postcards handed out at stations
OverviewSound Transit is planning parking and access improvements for the Edmonds and Mukilteo Sounder stations so that more people can ride the Sounder train and enjoy a traffic-free commute. This project was approved by voters in 2016.
In spring 2019, Sound Transit conducted outreach to identify barriers to taking Sounder and to learn what types of improvements riders and the public would prefer. Feedback helped inform the development of a list of possible improvement projects for each station.
Sound Transit conducted a second round of public outreach in fall 2019 to present options to the public and gather feedback. Sound Transit hosted an online open house and survey from October 16 to November 4, 2019, and held two in-person open houses, on October 29 in Edmonds and October 30 in Mukilteo. The results from this outreach, which are summarized in this document, will be used to help determine which projects advance to the next stage.
With feedback from stakeholders, Sound Transit has added seven new potential projects in Mukilteo for evaluation (see descriptions on page 7).
More than 1,700 people visited the online open house, and 60 people attended the in-person open houses. A total of 499 people completed surveys (340 surveys were from Edmonds and 159 from Mukilteo). Open house materials are available online.
The open houses were publicized through a variety of methods that included: a mailing to more than 7,100 local homes and businesses within a mile of the stations, local news coverage, email and social media promotion, as well as postcards handed out and posters displayed at the stations.
Edmonds and Mukilteo StationsParking and Access Improvements | Fall 2019 Outreach Summary 2 of 8
Summary of FeedbackThe open house materials (available at SoundTransit.org/edmonds-mukilteo) included background information, evaluation criteria, and a description of each potential improvement project, of which there were 22 in Edmonds and 16 in Mukilteo. Survey respondents were asked to rate each potential project as “not important,” “important,” or “very important,” and could also make comments.
Overall, respondents from both communities identified bus transfer timing and some nearby parking options as most important, and remote parking options as least important. The following comments on those topics were characteristic:
Bus transfer timing: “Being able to connect to a bus
without having to wait for a long time, especially in winter in the dark, is very important.”
Nearby parking improvements: “Any additional local parking would
be welcome.”Remote parking lots: “Remote lots are not helpful,
because it adds so much time on to my already long commute (I need to take a bus in Seattle to get to work).”
Respondent Characteristics
Sound Transit received 340 survey responses for Edmonds and 159 for Mukilteo. Survey respondents most commonly identified their home zip code as one of the three nearest and between the two stations.
526
525
99
5Edmonds
Mukilteo
98020(22%)
98026(27%)
98275(24%)
Edmonds and Mukilteo StationsParking and Access Improvements | Fall 2019 Outreach Summary 3 of 8
Edmonds FeedbackThere were 340 completed surveys for Edmonds, and 561 comments.
Of the 22 potential projects identified for Edmonds Station (see the full list online), the most highly rated by survey respondents were:
▶ Bus transfer timing improvements
▶ Parking at Washington State Ferries lot and Salish Crossing
▶ Station screening for wind and rain
▶ Downtown pedestrian lighting and crossing improvements
Sounder riders can get to Edmonds Station by walking; bicycling; taking Community Transit routes 116, 130, or 196; taking the ferry from Kingston; getting dropped off; carpooling; or driving alone. Sound Transit provides 259 parking spaces at the station, where on average there are 370 boardings each weekday. Sound Transit provides an additional 25 parking spaces at the Edmonds United Methodist Church, one mile northeast of Edmonds Station.
12
4
3
112122
20
19
13
1718
14
15
16
10
5
67
912
8
99
199th St SW
240th St SW
70th A ve
W
Wharf St
Park
Rd
Euclid Ave
Sierra St
Birch St
84th
Ave
W
198th St SW
Ocean
Ave
Aloha St
102nd
Ave
W
Hemlock St
Laurel St
14th St SW
Glen St
93rd
Ave
W
Caspers St
89
thAve
W
Poin
tW
ells
Rd
BrookmereSt
87
thA
veW
10th
Ave
S
68
t hSt
SW
8th
Ave
N
5th
Ave
N
97th
Ave
W
77
t hAv
eW
Cary
Rd
194th St SW
Nottingham Rd
Shell Valley Rd
B A
ve S
95th
Ave
W
201st St SW
Kuls hanRd
91
stA
v e W
215 th StSW
Noo
tka
Rd
206th St SW
187th St SW
Elm St
108
th A
ve W
Cherry St
83rd
Ave
W
190th St SW
217th St SW
A A
ve S
86th
Ave
W
203rd St SW
Spruce St
15th St SW
C A
ve S
78
thA
veW
191st St SW
2nd
Ave
S
Edmonds St
231st St SW
81st
Ave
W
71st
Ave
W
222nd St SW
Sprague St
Algonquin Rd
10th
Ave
N
4th
Ave
N
Bella Coola Rd
82nd
Ave
W
6th
Ave
S
4th
Ave
S
Cedar St
Fir St
90th
Ave
W
104
th A
ve W
6th
Ave
N
Daley St
210th St SW
106
th A
ve W
94
thA
veW
186th St SW
3rd
Ave
SSu
nset
Ave
N
12th
Ave
N
2nd
Ave
N
67
thA
veW
234th St SW
226th St SW
3rd
Ave
N
9th
Ave
N
75
thA
veW
Oly
mpi
c A
ve96
th A
ve W
192nd St SW
Makah
Rd
Wachusett Rd
230th St SW
7th
Ave
S7t
h A
ve N
74
thA
veW
Bell St
228th St SW
232nd St SW
114
th A
ve W
Maple St
Alder St
9th
Ave
S
208th St SW
216th St SW
Woo
dway
Park
Rd
188th St SW
92nd
Ave
W
Dayton St
8th
Ave
S
Walnut St
238th St SW
5th
Ave
S
200th St SW
224th St SW
98th
Ave
W
88th
Ave
W
218th St SW
Pine St
236th St SW
76th
Ave
W
68
thA
veW
100
th A
ve W
212th St SW
80th
Ave
W
196th St SW
Main St
220th St SW
Aur
ora
Ave
N
104
United
Presbyterian
Church of
Seattle PnR
Edmonds
Sounder
Station
Edmonds
United Methodist
Church PnR
Edmonds
PnR
Edmonds
Community
College Transit
Center
3 mile radius
1 mile radius
1⁄₂ mile radius
1 Port of Edmonds gravel lot
2 Harbor Square parking lot
3 City of Edmonds lot on the SE corner of W Dayton St and 2nd Ave S
4 Washington State Ferries parking lot adjacent to station
5 Salish Crossing parking lot
6 Remote parking at Old Woodway Campus
7 Remote parking at SR 104 and 100th Ave W
8 Remote parking at 76th Ave W and Olympic View Dr
9 Remote parking at Westgate Chapel
10 Remote parking at Edmonds Grace Lutheran Church
11 Additional on-demand secure bike lockers
12 228th St SW bike and pedestrian connection
13 Downtown pedestrian lighting improvements
14 100th Ave W and 9th Ave S bicycle improvements
15 Bowdoin Way bicycle improvements
16 80th Ave W bicycle improvements
17 Pine St and SR 104 pedestrian improvements
18 SR 104 pedestrian improvements
19 Additional bus bays at Edmonds Station
20 SR 104 bus improvements
21 Wind and rain screening at Edmonds Station
22 Bus transfer timing improvements
What we heardDuring outreach in the spring of 2019, respondents who chose Edmonds as their station were asked to rank which type of access improvements they would prefer.
EDMONDS RESPONDENTS’ TOP PRIORITIES
➊ Parkingandvehicleaccess
➋ Transitconnections➌ Pedestrian
improvements➍ Generalstation
amenities➎ Bicycleimprovements
Evaluated Improvement Projects
Edmonds Station
October 2019
Feedback themes by topic
Parking locationsTwo potential projects that would offer parking near Edmonds Station received strong support: the Washington State Ferries parking lot and the Salish Crossing parking lot, with favorable ratings (“important” or “very important”) from 79% and 69% of respondents, respectively.
“We need more parking. This seems like a cost effective option while still being reasonably close to the station.”(Regarding Washington State Ferries lot)
However, some respondents expressed concern about the impact of more Sounder parking on local businesses or ferry riders.
“Concerned for the effect this will have on the growing and thriving retail/restaurant area that has developed.”(Regarding Salish Crossing lot)
Other nearby parking locations received lower support, with 67% for Port of Edmonds gravel lot, 62% for Harbor Square parking lot, and 48% for the City of Edmonds lot at Dayton and Second Avenue South.
Sound Transit received the most comments by far, 133, about the City of Edmonds lot on the southeast corner of West Dayton Street and Second Avenue South, with about 90% of comments opposing the project. Most were concerned this would adversely impact ArtWorks, a community gathering place for artists.
“This is an important community resource worth much more to the users than 25 parking spots.”
After considering public feedback and the other parking options available, Sound Transit is no longer recommending this project be considered for further evaluation.
Remote parking facilities received the least support, with fewer than 30% of respondents giving favorable ratings for any of the five remote parking locations evaluated by Sound Transit. Comments indicate that many people find these locations inconvenient:
“More parking is important, but this is very far away and would create some difficulties with shuttling, adding too much time to commutes.”(Regarding Old Woodway Campus parking)
Overview map of potential Edmonds projects, from Open House materials.
Edmonds and Mukilteo StationsParking and Access Improvements | Fall 2019 Outreach Summary 4 of 8
Wind and rain screening at Edmonds Station
Eighty-five percent of respondents ranked this project favorably, with many observing the inadequacy of current shelter:
“Great idea! I switch to the 405 bus in the fall, when the weather gets windy and rainy to avoid showing up to work drenched.”
Others questioned how shelters would be located:
“Keep in mind people stand in line at the door entries. So adding canopies and windscreens at the back of the platform does not help riders.”
Bus projects
As stated above, bus transfer timing improvements were widely supported (rated favorably by 89% of respondents). Other potential projects to improve bus connections were also rated favorably by majorities: 69% for SR 104 bus improvements and 66% for additional bus bays at Edmonds Station.
“Currently the 416 is a very unreliable bus — its schedule is frequently off, mostly due to the difficulty pulling onto 104.”
However, several comments expressed concerns about these two potential projects – that in-lane bus stops on 104 could impact vehicle traffic, and that more bus bays could affect parking.
“104 is already so busy with traffic increasing all the time, this could make things worse, especially in the summer when the ferry traffic backs up.”
Bike and pedestrian projects
Downtown pedestrian lighting and crossing improvements were rated favorably by 80% of respondents.
“Each of these is a difficult crossing and improvement is needed.”
Some residents voiced concerns about 228th Street bike and pedestrian connection and potential adverse impacts.
“I have already seen an increase in traffic & speeding now that 228th St crosses Hwy 99. I am concerned about further increase in traffic & speeding. It was a quiet neighborhood when I moved in 20 years ago. I now hear cars constantly. I am in favor of a multi use path as we do need sidewalks, but we do not need designated bike lanes...”
Other comments expressed the need for more and better bicycle connections:
“Edmonds needs more North-South bicycle lanes to protect riders. This is a highly needed asset to the community.” (Regarding 100th Avenue West and Ninth Avenue South bicycle improvements)
Note that three potential bicycle projects—100th Avenue West and Ninth Avenue South, Bowdoin Way, and 80th Avenue West—have all been awarded funding by the Sound Transit System Access Fund. These projects will be built by the City of Edmonds and funded by Sound Transit and are no longer under consideration in this project.
Edmonds and Mukilteo StationsParking and Access Improvements | Fall 2019 Outreach Summary 5 of 8
Mukilteo FeedbackThere were 159 completed surveys for Mukilteo, with 240 comments.
Of the 16 potential projects identified for Mukilteo Station, the most highly rated were:
▶ Bus transfer timing
▶ City of Mukilteo parking
▶ Adaptive signal improvements at SR 525 and Fifth Street
▶ SR 525 multimodal pedestrian bridge
▶ Bus stop improvements
Sounder riders can get to Mukilteo Station by walking; bicycling; taking Community Transit route 113 or Everett Transit route 18; taking the ferry from Clinton; getting dropped off; carpooling; or driving alone. Sound Transit provides 63 parking spaces at the station, where on average there are 163 boardings each weekday.
Washington State Ferries is relocating the Mukilteo ferry terminal by 2020, which will improve access to Mukilteo Station.
Seaway
Transit Center
Olympic View
Middle School
Mukilteo
Sounder
Station
Lighthouse
Park
Rosehill
Community
Center
12
4
3
13
16
14
15
5
6
7
9
12
8
10
11
1 mile radius
1⁄₂ mile radius
3 mile radius
99
526
525
Muk
ilteo
Spe
edw
ay
Mukilteo
Speed
way
60th
Ave
W
Holbroo k Ave
F Rd
G Rd
Pain
eFi
eld
Blvd
Kay
Way
h A
ve W
11th St
Gre
ely
St
60th St SW
N 32nd St
104th St SW
GardnerAve
Idaho
Ave
First St
45
thA
ve
W
10th
Ave
W
R idge St
Lum
leyA
ve
Bailey Ave
9th
Ave
W
61s tAv
eW
18th St
54th St SW
57th St SW
59th
St SW
Sam
'sW
a
y
94th St SW
Web
s ter
St
56
thAv
eW
Front St
40th
Ave
W
95th St SW
59thA
veW
Hardeson Rd
56th St SW
Belvedere
Ave
46th
Ave
W
Love
land
Ave
U plan d Ave
19th St
Cornelia Ave
10th St
Do
ver St
Hil l St
Cam
pbel
l Ave
99th St SW
Church Ave
Boga
rt B
lvd
21st
Ave
W
Prospect
Ave
Rosewood
Ave
Viewcrest Ave
Lincoln Ave
Ha
llPa
rkRd
96th St SW
47th
Ave
W
27th
Ave
W
9th St
101st St SW
Shuksan Way
16th
Ave
W
Wa s
hin
gto
nAve
57th
Ave
W
78th St SW
E Arm
y W
ay
4th St
53rd
Ave
W
48 th
AveW
Montana Rd
Park Ave
Veral ene Way SW
Goat Tr ail Rd
76th St SW
SeaviewW
a y
103rd St SW
Kasch Park Rd
Dakota Way
84th St SW
8th
Ave
W
25
thAve
W
5th
Ave
W
Boeing Tour CenterR
d
33rd
Ave
W
36th
Ave
W
13thA
veW
Industry St
Chennault Beach Rd
6th St
23
rdAv
eW
10
93rd St SW
Har
bour
Poin
teBlv
d
Narb
eckA
ve
90th St SW
Associated
Blvd
18th
Ave
W
2nd St
SW Evere
Ocean
Ave
Shore Ave
5th St
49
th
A
v e W
106th St SW
3rd St
Goat Trail Loop Rd
75th St SW
80th St SW
Airport Rd
S
o u n d Ave
Seah
urst
Ave
Sievers D
92nd St SW
20
thA
v eW
108th St SW
28th A
ve W
44t hA
veW
88th St SW
Seaway Blvd
B oeing Perimeter Rd
W Casino Rd
100th St SW
W Mukilteo Blvd
1 Lighthouse Park parking lot
2 City of Mukilteo parking adjacent to Mukilteo Station
3 Tulalip parking development
4 Remote parking at Rosehill Community Center parking lot
5 Remote parking at Paine Field
6 Remote parking at Olympic View Middle School parking lot
7 Adaptive Signal Control system at 5th St and SR 525
8 SR 525 multimodal pedestrian bridge
9 Mukilteo Station pedestrian bridge
10 Pedestrian improvements at 2nd St and SR 525
11 SR 525 sidewalk between 2nd St and 3rd St
12 5th St bicycle and pedestrian improvements
13 On-demand secure bike lockers
14 Old Town bus stops
15 New SR 525 bridge over BNSF tracks
16 Bus transfer timing improvements
What we heardDuring outreach in the spring of 2019, respondents who chose Mukilteo as their station were asked to rank which type of access improvements they would prefer.
MUKILTEO RESPONDENTS’ TOP PRIORITIES
➊ Pedestrianimprovements➋ Transitconnections➌ Parkingandvehicle
access➍ Bicycleimprovements➎ Generalstationamenities
Evaluated Improvement Projects
Mukilteo Station
October 2019
Feedback themes by topic
Nearby parking locationsSound Transit evaluated three locations for added parking close to the station: near Lighthouse Park, at City of Mukilteo on-street spaces along Park Avenue and First Street, and on land owned by the Tulalip Tribes. Of these three options, the City of Mukilteo location was rated most highly (“important” or “very important” by 80% of respondents), while Lighthouse Park was favored by 65% of respondents and Tulalip only by 40%.
Many comments stated that any new parking should be located near the station so that it’s convenient for riders:
“Very important option given that the parking is typically full after the 2nd train and non Muk residents can’t park in the vicinity now.”
However, other survey respondents expressed concerns about additional parking or vehicles on the waterfront.
“Bringing more vehicles to the waterfront is not a long-term solution.”
Some expressed concerns about the lack of available spaces at Lighthouse Park, particularly in the summer, while others stated that Tulalip land is not available. (Sound Transit is no longer considering the Tulalip land as an option since the tribe decided not to pursue a parking facility midway through this project.)
Overview map of potential Mukilteo projects, from Open House materials.
Edmonds and Mukilteo StationsParking and Access Improvements | Fall 2019 Outreach Summary 6 of 8
Partnerships for shared parking
Several comments urged Sound Transit to work with other agencies on joint parking arrangements.
“This new station is supposed to be multi-modal so please PARTNER with WS Ferries and Community Transit to provide parking for train, bus, AND ferry users.”
Remote parking
Three remote parking locations were included in the list of potential projects: at Rosehill Community Center, at Paine Field, and at Olympic View Middle School. None of the three were rated highly by survey respondents, with favorable ratings from 44% for Rosehill, 39% for Paine Field, and 26% for Olympic View. Comments on these projects described the locations as too far from the station to be convenient:
“I think it is too far from the station to be worth it.”
“Way too far away to be used.”
However, the remote parking options also received positive comments, generally from people in favor of keeping additional parking away from the waterfront.
“Yes, please provide a new lot away from the beautiful Mukilteo waterfront, with bus connections.”
Pedestrian and bicycle projects
Many comments supported better pedestrian connections to the waterfront, including new bridge options across the BNSF tracks.
“Already an unsafe bridge for all who cross it. Something needs to be done to improve pedestrian and bike access.”
The SR 525 multimodal pedestrian bridge (new stand-alone bridge over the railroad tracks adjacent to the existing SR 525 bridge) was rated favorably by 72% of respondents, while the “New SR 525 bridge over BNSF tracks” (replacing the SR 525 bridge) was rated favorably by 64% of respondents.
Comments on some pedestrian and bike improvement projects were mixed.
“I ride my e-bike every day to the train station and currently I have to go odd routes to dodge the busy 5th Street traffic.”
Bus projects
Many respondents voiced strong support for bus improvements, including both transfer timing and constructing new bus stops in Old Town.
“It would be SO GREAT if I could walk up to the speedway from my house and catch a timely bus down to the train station without adding an hour to my commute.”
Edmonds and Mukilteo StationsParking and Access Improvements | Fall 2019 Outreach Summary 7 of 8
New Mukilteo Projects Under Consideration
November 2019
New Projects Near Mukilteo StationNot Yet Evaluated
C
D
Olympic View Middle School
MukilteoSounderStation
Lighthouse Park
Rosehill Community Center
F
1 mile radius
mile radius
Muk
ilteo
Spe
edw
ay
ve W
Pain
eFi
eld
Blvd
11th St
First St
45
thA
ve
W
Ridge St
Lum
leyA
ve
18th St
Web
s ter
St
Front St
40th
Ave
W
Love
land
Ave
U plan d Ave
19th St
Cornelia Ave
10th St
Hil l St
Cam
pbel
l Ave
Church Ave
Prospect
Ave
Lincoln Ave
9th St
Was
hin
gto
nAve
Ave
W
78th St SW
4th St
53rd
Ave
W
Park Ave
Goat Tr ail Rd
76th St SW
84th St SW
Boeing Tour CenterR
d
36th
Ave
W
6th St
2nd St
5th St
3rd St
Goat Trail Loop Rd
S
o u n d Ave
92nd St SW
44thA
veW
88th St SW
S
525
92nd St
A
B
CE
G
Proposed Improvement Projects
A Mukilteo Waterfront PromenadeConstruct waterfront walkway from Edgewater Beach Park to an undeveloped city property commonly known as the Japanese Gulch Creek Park (which is at the east end of the WSF project site)
C SR 525 Bicycle Improvements(5th St to 76th St SW)This project would construct a buffered southbound bicycle lane along SR 525 from 5th Street to 76th Street SW. Due to constraints along SR 525 between 5th Street and Park Avenue, alternative facilities would be constructed Downtown, including: safety improvements at 5th Street / Lincoln Avenue, neighborhood greenway improvements on Lincoln Avenue from 5th Street to 3rd Street, and widening the sidewalk in Totem Park to connect to 2nd Street.
D SR 525 Bicycle Improvements(76th St SW to 92nd St SW)This project would construct buffered north and southbound bicycle lanes along SR 525 from 76th Street SW to 92nd Street SW to connect to the North Fork Trailhead.
E Remote Parking at Saint John Mission ChurchThis improvement project would explore options to lease about 50 spaces from Saint John Mission Church, which is located about a half-mile walk to the station.
2nd Street Streetscape Improvements This project would construct sidewalks with planting strips on 2nd Street from SR 525 to Loveland Avenue to fill sidewalk gaps and meet the City’s current street frontage standard as defined in the City’s Downtown Business District Subarea Plan. The project would also include lighting, landscaping, and pedestrian amenities like seating. No additional right-of-way is required and there would be no impacts to on-street parking.
B
F Parking Improvements near Mukilteo StationSound Transit would work with property owners near the station to provide parking at a proposed privately-funded parking structure where the current ferry holding lanes are located.
G Pick-Up/Drop-Off EnhancementsThis project would evaluate the operations of the new pick-up/drop-off area for the Sounder Station, currently under construction as part of the Washington State Ferries project to reconstruct the Mukilteo Ferry terminal, and identify any additional pick-up/drop-off that may be feasible near the station.
Based on feedback from stakeholders, Sound Transit is evaluating seven new potential improvement projects in Mukilteo, described below. Please send any comments or questions about these potential projects to Sound Transit (emsounder@soundtransit.org) by January 10.
Mukilteo Waterfront PromenadeThis project would construct a waterfront walkway from Edgewater Beach Park to an undeveloped City property commonly known as Japanese Gulch Creek Park (which is at the east end of the Washington State Ferries project site).
Second Street Streetscape ImprovementsThis project would construct sidewalks with planting strips on Second Street from SR 525 to Loveland Avenue to fill sidewalk gaps and meet the City’s current street frontage standard as defined in the City’s Downtown Business District Subarea Plan. The project would also include lighting, landscaping, and pedestrian amenities like seating. No additional right-of-way is required and there would be no impacts to on-street parking.
SR 525 Bicycle Improvements (Fifth Street to 76th Street Southwest)This project would construct a buffered southbound bicycle lane along SR 525 from 5th Street to 76th Street SW. Due to constraints along SR 525 between 5th Street and Park Avenue, alternative facilities would be constructed Downtown, including: safety improvements at 5th Street / Lincoln Avenue, neighborhood greenway improvements on Lincoln Avenue from 5th Street to 3rd Street, and widening the sidewalk in Totem Park to connect to 2nd Street.
SR 525 Bicycle Improvements (76th Street Southwest to 92nd Street Southwest)This project would construct buffered northbound and southbound bicycle lanes along SR 525 from 76th Street Southwest to 92nd Street Southwest to connect to the North Fork Trailhead. This would require widening of SR 525 and reconstruction of the existing sidewalks.
Remote Parking at Saint John Mission ChurchThis project would explore options to lease about 50 spaces from Saint John Mission Church, which is located about a half-mile walk from the station.
Parking Improvements near Mukilteo StationSound Transit would work with property owners near the station to provide parking at a proposed privately-funded parking structure where the current ferry holding lanes are located.
Pick-Up/Drop-Off EnhancementsThis project would evaluate the operations of the new pick-up/drop-off area for the Sounder Station, currently under construction as part of the Washington State Ferries project to reconstruct the Mukilteo Ferry terminal and identify any additional pick-up/drop-off options needed and feasible near the station.
Edmonds and Mukilteo StationsParking and Access Improvements | Fall 2019 Outreach Summary 8 of 8
Other Feedback ThemesComment themes outside the scope of this project included:
Desire for more trains
“I believe that more trains, both ways, morning and evening would have the biggest positive effect on ridership.”
Concerns with permit parking
“I fully disagree with the additional paid permit parking at the Edmonds station. For me to pay for parking on top of my commuter fees would make it not financially feasible to continue with public transportation and put a burden on my monthly budget.”
See our Frequently Asked Questions for more information on these topics.
Next StepsSound Transit will consider this community feedback and share it with City Councilmembers and Sound Transit Board members to help determine which projects will advance to environmental review and conceptual design. This feedback will be considered alongside the technical analysis related to ridership, environmental impacts, and access improvements. Action by the Sound Transit Board to advance a set of projects to the next phase is planned for March. After conceptual design and environmental review is complete, the Sound Transit Board will select the project to be built for each station, which in this case is a number of specific parking and access improvements.
WE ARE HERE
CONSTRUCTION VARIES BY PROJECT
DESIGN VARIES BY PROJECT
PLANNING2019–2021
ALL PROJECTSCOMPLETE
2024• Screening• Environmental review
To stay informed: ▶ Contact Melanie Mayock,
Community Outreach Specialist: melanie.mayock@soundtransit.org or 206-689-4877
▶ Visit the project website: soundtransit.org/edmonds-mukilteo
▶ Sign-up for project updates by email: soundtransit.org/subscribe