Embassy Suites

Hillsboro, OR

Technical Information Project Completion Date: October 31, 2014 Project Location: Hillsboro, OR Size of Project: The hotel consists of 7 stories with a basement, 165 guest rooms, and 6,411 cubic yards of concrete. Strength Requirements: 4,000 – 6,000 psi Water/Cement Ratios: 0.38 – .047

Embassy Suites – Hillsboro

Embassy Suites – Hillsboro

The 140,000 SF Embassy Suites project located in Hillsboro, Oregon consists of 165 rooms, complete with Offices, Lobby, Kitchen, Restaurant, Lounge, Meeting

Rooms, Exercise Room, and Indoor Pool.

Embassy Suites – Hillsboro

The 140,000 SF Embassy Suites project located in Hillsboro, Oregon consists of 165 rooms, complete with Offices, Lobby, Kitchen, Restaurant, Lounge, Meeting

Rooms, Exercise Room, and Indoor Pool.

Embassy Suites – Hillsboro

The 140,000 SF Embassy Suites project located in Hillsboro, Oregon consists of 165 rooms, complete with Offices, Lobby, Kitchen, Restaurant, Lounge, Meeting

Rooms, Exercise Room, and Indoor Pool.

Embassy Suites – Hillsboro

This seven story structure includes a poured in place concrete basement, topped with concrete columns and shearwalls, and post -tensioned concrete slab.

Embassy Suites – Hillsboro

This seven story structure includes a poured in place concrete basement, topped with concrete columns and shearwalls, and post -tensioned concrete slab.

Embassy Suites – Hillsboro

The use of posttension concrete framing results in lower construction costs and a more open building design due to thinner concrete slabs

with longer spans between supporting walls and columns.

Embassy Suites – Hillsboro

The use of posttension concrete framing results in lower construction costs and a more open building design due to thinner concrete slabs

with longer spans between supporting walls and columns.

Embassy Suites – Hillsboro

The ability to use a “Flyer Table” shoring systems allowed the concrete contractor to cycle floors rapidly to meet the aggressive project schedule.

Embassy Suites – Hillsboro

The ability to use a “Flyer Table” shoring systems allowed the concrete contractor to cycle floors rapidly to meet the aggressive project schedule.

Embassy Suites – Hillsboro

The ability to use a “Flyer Table” shoring systems allowed the concrete contractor to cycle floors rapidly to meet the aggressive project schedule.

Embassy Suites – Hillsboro

Embassy Suites – Hillsboro