'l1ml mq)fl:government of India
~~~Central Electricity Authority
~t;fIfm~~
Western Regional Power Committee~l:f)-3, Q}1~~, ·3imT (~), ~ - 400 093
P-3, MIDC Area, Andheri (East), Mumbai - 400093~'l.114 Phone: 022- 28353222; 28200195; 28200194; ~ Fax: 022 -28370193
Website: www.wrpc.gov.in E-mail: comml-wrpc@nic.in
~/~-:m e gOOl-2008IS/ISO: 9001-2008
~: 02.11.2015
fcllsr<l: d1GI~I~ c)) ~, ~ 2 ~ $f5<OJI~C"tl(tC1c1 $%<IT) ~ ~ at ~29 J1T& 201 5 eN scr f.i}s urc:rmc=r chl' ~(>f ftqTt I
(tl ,<OJC"l1{I <OJ0 I 'l:R1.)
3rtfra=rur ~ (ta=rur)
'qffif~government of India
~~~Central Electricity Authority
~~~~Western Regional Power C mmittee
~ -3, ~~~, i3MT (¥), ~ - 400093F-3, MIDC Area, Andheri (East), Mumbai - 400 093
~Phone: 022-28353222,2820 0194/95/96 ~Fax: 022-28370193Website: E-mail:
~'l«J~'l«~g 9001-200015/150: 9001-
2008
No. WRPCIPCM/SPS/20151 914 tJ Date: 02.11.2015
To,
As per mailing List
Sub: Final Report on Grid Disturbance at Akola, Akola2 and Indiabulls (Rattan India) Sub-stations in Maharashtra on 29th March 2015.
Sir,
Please find enclosed herewith the Final Report on Grid Disturbance at Akola, Akola2 andIndiabulls (Rattan India) Sub-stations in Maharashtra on 29th March 2015.
This is for your information and needful action please.
Encl. As above. .«:(so1'1(A--nC't""fc;t.'I~n $, ')Superintending Engineer ~tn.)
Mailing list
1 Chief Engineer (LD), MSETCL, Kalwa. Fax-27601769/65
2 Chief Engr. (Trans O&M), MSETCL, Bandra. Fax No. 022 - 26590808/26598587.
3 CE (W), MSEGCL, 3rd floor, Prakash gad, Mumbai.
4 S.E. (T&C), MSETCL, Aurangabad Fax-0240-2234220 /2346290
5 S.E (T&C), MSETCL, Pune. Fax-9520-2617532/2612342
6 Dy. CE (Testing), MSETCL, Koradi, Nagpur. Fax- 07109 - 262162
7 S.E.(T&C), MSETCL, Vashi Fax- 022-27656039 /27653463
8 S.E.(Testing), Bhusawal, Dist: Jalgaon Fax-02582-250379
9 S.E.(TCC), MSETCL, Karad. Fax.No. 02164 255118
10 CE, SLDC, GETCO, Gotri, Vadodara
11 Chief Engineer (Gen), GSECL, H.O. Baroda. Fax-0265-5512129/2344537
12 S.E. (Testing), GETCO, Baroda. Fax-0265-2351218
13 Chief Engineer (LD), MPPTCL, Jabalpur, Fax - 0761- 2664343 / 2970119.
14 E.D. (T&C), MPPTCL, Jabalpur. Fax-0761-2702710
15 ED (Engg.) MPPGCL, Jabalpur Fax- 0761-2660063
16 Chief Engineer (LD), CSPTCL, Raipur. Fax-0771 - 2574174
17 C.E. (T&C), CSPTCL, Raipur.Fax-0771-2574749
18 EE (T), CSPGCL- Fax.No. 07789-226227
19 S.E. (T&C), CSPTCL, Bhilai. Fax.No. 0788 - 2281561
20 S.E. (T&C), CSPTCL, Raipur. Fax No.0771 – 2574749 / 2574458.
21 EE, Division VIII (MRT),Elect. Dept; Goa Fax 0832-2735124.
22 Supdt.Engr., Electricity Dept., DNH, Silvasa. Fax : 0260-2642338
23 Executive Engr., Electricity Dept. DD. Fax: 0260-2250889
24 D.G.M. (O.S. ),N.T.P.C., Mumbai, Fax- 28216692
25 DGM, NTPC WR – II, Raipur, Fax: 0771 - 2544550
26 D.G.M. (EM), KSTPS, NTPC, Korba Fax 07759-233088 (Tele fax: 232440) /237462
27 DGM (EMD), VSTPS, NTPC, Vindhyachal Fax-07805-247713 /247711
28 DGM (EM-I), NTPC, SIPAT Fax-07752-246506 (Tele fax: 246691)
29 AGM (O&M), KGPP, Adityanagar, Surat Fax 0261-2861428/2861433
30 Sr. Supdt. (EM), Gandhar, NTPC Fax-02642-87402 / 87450
31 DGM (O.S.), WRLDC, Mumbai Fax-28235434
32 DGM, WRTS-I, PGCIL, Nagpur, Fax- 0712- 2631051 / 641366
33 AGM, WRTS-II, PGCIL, Baroda Fax-0265-2480952 (Tele fax: 2487542)
34 AGM, O&M, WRTS – III, PGCIL, Raipur. Fax: 0771 - 2970450
35 SME (E), TAPS-3&4,Tarapur Fax 02525-282001/282073
36 Maintenance Superintendant, TAPS –1 & 2, Tarapur.Fax- 02525-282121
37 SME(E), NPCIL , Kakrapara Fax 02626-234266
38 GM (Maint.). TORRENT Power., Ahmedabad.Fax-079-27506679
39 AGM (QAIT), TPC, Trombay. Fax –022-66687088
40 Asst. VP, Dahanu TPS Fax- 952528-222576 / 222039
41 GM (O & M), Reliance Infrastructure Limited, Mumbai Fax-30094488
42 GM (Electrical), JPL, Raigarh, Fax. No. 7767-281995, 281993.
43 AGM (OS), NSPCL, New Delhi . Fax.No.011 26717381/26717363/26717366
44 Vice President, APL, Ahmedabad 079-25557176
45 GM, RGPPL, Anjanwel, Guhagar, Ratnagiri, Fax.No. 02359 241071
46 GM, JSW Energy Ltd., Jindal Mansion, Mumbai- Fax.No.022 23526400
47 GM, CGPL, Mundra Fax.No. 02838 661188
48 VP, EPTCL, Hazira, Surat, Gujarat Fax: 0261 - 6682747
Final Report on Grid Disturbance at Akola, Akola2 and Indiabulls
(Rattan India) Sub-stations in Maharashtra on 29th March 2015
1.0 Introduction :
The disturbance at Akola and nearby substations in Maharashtra Systemon 29.03.2015 was
discussed in the 124th
, 125th
PCMs held on 21.04.2015 and 05.06.2015 respectively. In the
125th
PCM, it was decided to form a group comprising of members from MSETCL (Shri.
Tijare), WRLDC (Smt. Pushpa Sheshadri), PGCIL (Shri. Anand Dubey & Shri G. Shinde),
APL (Shri. Uday Trivedi), TATA Power (Shri. G.T. Jawale) & WRPC (Shri Satyanarayan S.
& Shri P.D.Lone) to analyze the disturbance in depth, as per preliminary report of WRLDC,
protections at many locations have mal operated/not operated resulting in a wide spread
disturbance.
Accordingly meeting of the group to analyse the disturbance was held on 16.10.2015. The list
of participants is enclosed at Annexure-I.
Based on the discussions & WRLDC preliminary report, following report is prepared.
2.0 Brief on the disturbance:
The single line diagram of the affected area and flows prior to the disturbance is enclosed at
Annexure-II.
400kV Akola2-Taptithanda-I was already in service. 400 kV Akola2 – Taptithanda – II was
open from Taptitanda end and was closed from Akola2 end for trial operation on 29.03.2015
at 13:34hrs. After charging the line at 13:34:45.335 Hrs, ‘PT fuse fail’ alarm appeared.
However the staff of Akola2 S/S didn’t pay required attention to this alarm. The DPS (both
main I & main II) at Akola2 end got blocked due to PT fuse fail. After 30 minutes i.e. at
14:03:56.610 Hrs a fault occurred on the line and was not cleared from Akola2 end due to
blocked DPS. The reason for PT fuse failure was investigated after the occurrence & it was
found that PT connection wires loose at terminal block. Thereafter at 14:04 Hrs, tripping
occurred on many lines of WR due to non-clearance of fault on 400 kV Akola2 – Taptithanda
– II. This event has led to complete blackout at Nandgaon Peth (Indiabulls), 400 kV Bus at
Akola1 and Akola2 sub-station. During this, unit 2, 3 & 5 at Indiabulls (Rattan India)
generating station (Gen: 440 MW) and Unit 8 (Gen: 110 MW) at Koradi – II generating
station tripped on standby E/F protection.
With this event and tripping of lines, power on Wardha –Parli D/C has crossed 850 MW
resulting in SPS-5 operation i.e. Wardha-Parli D/C crossing 850 MW (As 765 kV Wardha-
Aurangabad (PG) 1 & 2 were under planned outage and other line in corridor i.e. Wardha-
Akola-Aurangabad (PG) D/C and Akola2-Taptithand S/C tripped). In addition, the power
from Wardha s/s got routed through Wardha-Seoni-Khandwa-Dhule corridor and
Bhadrawati-Parli and Chandrapur-Parli corridors.
The source of the fault was located on the newly idle charged 400 kV Akola2-Taptithanda II
circuit which was charged from Akola2 at 13:34 Hrs and kept hanging from remote end. The
line was charged based on Maharashtra SLDC confirmation that they were receiving the data
for this line. The circuit was test charged for 15 minutes as per the approval of WRLDC and
it had to be tripped by 13:49 Hrs. However, the same was not followed by the Akola2 sub-
station, which is a MEGPTCL sub-station as well as Maharashtra SLDC who were having the
Data for this line. After 29 minutes of charging of this circuit, B phase to earth fault has
occurred on this line (14:03:55.090), which has to be cleared from Akola2 end distance
protection as lines was only ideal charged from Akola2 end. This fault was not cleared from
Akola2 end relay of the 400 kV Akola2-Taptithanda 2 circuit, which resulted in fault feeding
by various feeders connected with Akola2.
The above incident was serious in view that already 765 kV Wardha-Aurangabad 1 & 2 along
with 765/400 kV ICTs at Aurangabad (PG) were under shutdown. The above incident had not
resulted in any major event due to reliability measures taken for the planned outage of 765
kV lines. The Tirora generation was limited below 1800 MW and Maharashtra drawal was
restricted to 5300 MW along with WR-SR TTC reduction by 200 MW to take care of
contingencies. Further the interstate corridor of Maharashtra i.e. 400 kV Seoni- Khandwa-
Dhule D/C, 400 kV SSP-Dhule, 400 kV Vapi-Boisar, 220 kV Navsari-Nasik and all lines of
Bhilai corridor were kept in service. During the loss of the lines in the Akola –Bhusawal,
Akola2-Taptithanda 1, Akola-Wardha D/C and Koradi2-Indiabulls, the power got routed
through the 400 kV Wardha-Parli D/C and other parallel corridors and interstate corridors
mentioned above. The loading of 400 kV Wardha-Parli D/C has crossed 850 MW each which
has led associated SPS operation at 14:04 Hrs. It was further observed that no generation
backing down as designed in SPS, has occurred either at Tirora or at Mouda generating
station. The load shedding in SR has led to reverse power flow on 765 kV Solapur-Raichur
D/C and thus relieving the line loading on 400 kV lines from Eastern Maharashtra to Western
Maharashtra (load Centers) thus helping in safer operation of the Indian Grid during this
extreme contingency.
The change in various line loading can be seen in below table:
Lines Line loading in MW at
14:03
Line Loading in MW at
14:06
765 kV Seoni-Wardha 1 443 44
400 kV Seoni-Khandwa D/C 481+484 593+594
400 kV Khandawa-Dhule D/C 478+481 629+634
400 kV SSP-Dhule D/C 126+126 240+240
400 kV Dhule-Baleshwar D/C 277 + 277 450 + 450
400 kV Koradi-Deepnagar S/C 390 678
400 kV Bhadrawati-Parli S/C 415 446
400 kV Bhadrawati-Dhariwal-
Parli
401 416
400 kV Chandrapur2-Parli D/C 406+420 467+484
400 kV Chandrapur-Parli S/C 421 485
400 kV Wardha-Parli D/C 719+724 815+818
400 kV Parli(PG)-Pune GIS
D/C
314+308 409+402
400 kV Parli-Lonikhand2 D/C 410+406 516+514
3.0 Sequence of events :
Initially the fault was B-Ph fault and another fault have occurred which was Y-phase fault as seen
from the DRs and following protections operated during the fault fed. The relay indications and
Sequence of events is enclosed at Annexure-III & Annexure-IV respectively.
(i) 15:03:56:610 Hrs : 765/400kV, 1500MVA ICT tripped on initiation of 51N function of the
ABB REL670 relay on 400kV side, which is connected to neutral CT of ICT with a setting of
20% of FLC (2165 A) & time delay of 1.5 secs.
(ii) 14:03:57:684 Hrs : 400/220kV, 315MVA ICT at 400kV Akola1 tripped from LV side on Dir.
E/F.
(iii) At 14:03:58.250 Hrs, 400 kV Akola1 – Wadha – II tripped in Zone-2 at 400kV Wardha S/S
and DT received at Akola 2.
(iv) 14:04:09:058 Hrs : 400kV Nandgaon Peth –Akola1 tripped on O/V
(v) 14:04:09:064 Hrs : 400kV Wardha-Akola1 – I tripped on Zone-II DPS at Wardha end.
(vi) 14:04:09:069 Hrs : 400kV Wardha-Akola1 – II tripped on O/V at Akola1 end
(vii) 14:04:09:073 Hrs : 400kV Akola1-Augangabad(PG) – I tripped on O/V at Akola1 end.
(viii) 14:04:09:073 Hrs : 400kV Akola1- Akola2 – II tripped on Z-III(L2-L3) at Akola1 end.
(ix) 14:04:09:074 Hrs : 400kV Akola1- Akola2 – I tripped on O/V at Akola2 end.
(x) 14:04:15:694 Hrs : 400kV Akola1-Augangabad(PG) – II tripped on O/V at Akola1 end.
(xi) 14:04:15 Hrs : 400kV Akola1-Bhusawal tripped on Z-III(Y-B) at Bhusawal end.
4.0 Event Analysis:
To analyze the disturbance the data was collected and the DRs/ELs triggered/logged were co-
related. MSETCL Akola (TCC) gave a well co related presentation on the disturbance and is
enclosed at Annexure-V. The relevant DRs is enclosed at Annexure-VI.
Tripping of the lines/ICTs from remote ends was analyzed in the meeting and the
observations of the group is as follows :
The fault current recorded due to initiation of stub protection pick up of 400 kV Akola2-
Taptithanda II line at Akola2 end was around 3.448kA. The fault current contribution by
765/400kV ICT at Akola-II was seen to be around 1.635kA. The remaining contribution of
around 1.813kA was contributed by : 400kV Akola1- Akola2 D/C, 400kV Nandgaon Peth –
Akola2 D/C and 400kV Taptitanda - Akola2 – I.
The fault (Y-phase jumper flash over) on 400 kV Akola2-Taptithanda II was located at a
distance of 147Km from Akola2 end during patrolling of the line. However DRs initially
show B-phase fault. Therefore two faults occurred, initially the fault was B-phase fault and
later on second fault(Y-Ph) occurred.
(i) 400 kV Akola2- Taptithanda II line should have tripped from Akola2 end in Z-I DPS.
However the Main-I & Main –II relays were already blocked due to VT fuse failure.-
MEGPTCL have already admitted that on receipt of VT fuse failure and blocking of Min-I &
Main-II protection the S/S staff should have handtripped the line. The cause for VT fuse
failure was loose connections in both the terminal blocks of the PTs. The DRs show that the
fault was on B phase, initially. The non clearance of fault by primary protection of this line
led to clearing of fault from remote ends as follows.
(ii) Tripping of 765/400kV, 1500MVA ICT on initiation of 51N function of the ABB REL670
relay on 400kV side : Since the sensitive E/F protection was non directional with DMT, it
operated. The setting adopted is 20% of FLC (2165 A) & time delay of 1.5 secs.
(iii) Tripping of 400/220kV, 315MVA ICT at 400kV Akola1 tripped from LV side on Dir. E/F
was due to fault fed for the set time delay as per the IDMT time characteristics.
(iv) Since the 765/400kV ICT was the major in-feeding source for the fault, the other lines could
not sense the fault (due to infeed effect of approximately 2x impedance of the fault section on
400 kV Akola2- Taptithanda II was seen till the ICT tripped).
(v) Tripping of 400 kV Akola1 – Wadha – II in Zone-2 at 400kV Wardha S/S and DT received at
Akola 2 : The fault feeding path for this circuit is 400kV Wadha –Akola1(DC)– Akola2
(DCs). The line lengths of 400 kV Akola1 – Wadha is 162Km and line lengths of 400kV
Akola1-Akola2 is 30Km. The setting for Z-II 400kV Wadha –Akola1 lines is 150% of the
line length(i.e.243Km). The setting for Z-II 400kV Akola2 –Akola1 lines is 150% of the line
length (i.e.45Km). Therefore 400kV Akola1-Akola2 could not sense the fault in Z-II,
However as per settings it was within Z-II reach of 400kV Wadha –Akola1. The 400kV
Wadha –Akola1 lines could not trip ahead of ICTs was due to the fact that there was major
contribution of fault current from ICTs, resulting in high in-feed effect for 400kV Wadha –
Akola1 lines before tripping of ICTs. However the 400kV Wadha –Akola1 lines tripped in Z-
II after tripping of ICTs(i.e. reduction in in-feed fault current). This suggests that the fault was
between 8Km to 66Km from Akola2end.
The DT in Z-II on 400 kV Akola1 – Wadha – II was inadvertently wired up and hence
tripping of this line at Akola1 on DT receipt occurred, which has now been disabled.
(vi) Tripping of 400kV Wardha-Akola1 – I in Zone-II DPS at Wardha end –same as described at
Sr.(iv)..
(vii) Tripping of 400kV Nandgaon Peth –Akola1 on O/V : After loss of major fault feeding lines,
O/V might have occurred.
(viii) 14:04:09:069 Hrs : 400kV Wardha-Akola1 – II tripped on O/V at Akola1 end : After loss of
major fault feeding lines, O/V might have occurred.
(ix) 14:04:09:073 Hrs : 400kV Akola1-Augangabad(PG) – I tripped on O/V at Akola1 end.: After
loss of major fault feeding lines, O/V might have occurred.
(x) 14:04:09:073 Hrs : 400kV Akola1- Akola2 – II tripped on Z-III(L2-L3) at Akola1 end : : The
fault feeding path for this circuit is 400kV Akola1– Akola2 (DCs). The line length of 400 kV
Akola1 – Akola2 is 30Km and the fault was between 8-66Kms. The setting for Z-II 400kV
400kV Akola1– Akola2 (DCs) lines is 150% of the line length(i.e.45Km).. Therefore 400kV
Akola1-Akola2 could not sense the fault in Z-II since the fault was 8-66Km from Akola2 end
and due to DC the faulty section impedance seen by the relays was 2xfault impedance after
the tripping of 400kV Wadha –Akola1 DCs. Therefore one of the 400kV Akola1- Akola2
lines tripped in Zone-III due to racing around and thereafter the other circuit tripped on O/V.
(xi) 14:04:09:074 Hrs : 400kV Akola1- Akola2 – I tripped on O/V at Akola2 end : After loss of
major fault feeding lines, O/V might have occurred.
(xii) 14:04:15:694 Hrs : 400kV Akola1-Augangabad(PG) – II tripped on O/V at Akola1 end :
After loss of major fault feeding lines, O/V might have occurred.
(xiii) 14:04:15 Hrs : 400kV Akola1-Bhusawal tripped on Z-III(Y-B) at Bhusawal end : : The
fault feeding path for this circuit was 400kV Bhusawal - Akola1(SC) - Akola2 (DC). The line
length of 400 kV Bhusawal- Akola1 is 180Km and line length of 400kV Akola1-Akola2 is
30Km. The setting for Z-III 400kV Bhusawal- Akola1 line is 100% of Bhusawal- Akola1 and
100% of Akola1-Nanedgaon peth (longest line from remote bus) which is 288Km and
therefore tripping of this line resulted after loss of major contributing in feeds.
(xiv) After 14:04:15 Hrs: 400kV Koradi-Nanedgaon peth : 400kV Koradi-Nanedgaon peth line
length(i.e.158Km). The setting for Z-III 400kV Koradi-Nanedgaon peth line is 100% of
Koradi-Nanedgaon peth(158Km) and 100% of Akola1-Nanedgaon peth (longest line from
remote bus) which is 262Km and therefore tripping of this line resulted after loss of major
contributing in feeds.
(xv) Once the primary protection had failed to isolate the fault, protections at remote end
operated and the reaches sensed by these relays were telescopic or reverse telescopic.
This might seem surprising at the first look, but were by and large in order.
5.0 Change in the voltage during the event can be seen in below figures:
5.1 Load/Generation Loss: Generation of Around 550 MW was lost with tripping of Units
of Koradi-8 and Indiabulls 2, 3 & 5. There was no direct load loss, due to tripping of above
ICT’s or lines. However due to tripping of Akola 315MVA ICT, 220 kV network at Akola
was over loaded (Paras unit-3 &4 were out prior to occurrence). Hence, planned load
shedding from A to G groups and distress load shedding was carried out in Buldhana and
Akola district. Approximate 80 MW Load was affected due this. Load shedding was
withdrawn at 15.50 Hrs after charging of Akola ICT.
5.2 Frequency Change: Due to loss of generation frequency dropped by 0.0564 Hz due to
loss of generation as shown in below figure.
5.3 Restoration:
Sl.No Line/ICT Restoration time
1 400 kV Koradi2-Indiabulls 14.39
2 400 kV Akola–Wardha 1 15.03
3 765/400 kV 1500 MVA ICT at Akola2 15.06
4 400 kV Akola2 –Taptithanda 1 15.19
5 400 kV Akola– Aurangabad(PG) 1 15.30
6 400KV Akola–Bhusawal 15.36
7 400KV Akola–Wardha 2 15.47
8 400/220KV, 315MVA ICT at Akola 15.49
9 400 kV Akola– Aurangabad(PG) 2 16.04
10 400 kV Indiabulls-Akola 16.15
11 400 kV Akola2- Akola 1 16.47
12 400 kV Akola2- Akola 2 16.48
13 400 kV Indiabulls-Akola2 1 17.45
14 400 kV Indiabulls-Akola2 2 17.46
15 Indiabulls Unit 2 20:40
16 Indiabulls Unit 3 30-03-15 02:11
17 Indiabulls Unit 5 30-03-15 06:22
18 Koradi 8 30-03-15 03:18
6.0 Conclusions & Recommendations :
Human Factor at 765/400 kV Akola2 Sub-station
After analyzing the disturbance, it is observed that one the major factor which led to the
event was the human error at Akola2 Sub-station. The event logger has clearly shown the
VT fuse failure alarm immediately after the ideal charging of 400 kV Akola2-Taptithanda
2 circuit. The VT connections were loose as admitted by M/s MEGPTCL, the voltages
displayed on the control panel & the alarm itself would have been taken seriously and the
line should have been immediately hand tripped rather than trying to search out for the
cause. Moreover this was idle charged and could have been tripped easily.
The Group recommends that the well known protection principle of tripping a line once
both DPSs are blocked and the cause for blocking the DPS could not be fixed within
shortest possible time, should be strictly followed. Otherwise operation of protections
from remote ends would disrupt larger areas and their operation can be bit surprising at
times. This issue may be discussed in OCC and suitable policy adopted.
Other protection issues :
1. The commissioning should have been done with proper testing and checking of all the
wiring and logic prior to charging of the lines at 765/400 kV Akola2 Sub-station.
Proper testing to be done for all the connection prior to charging of new lines. All
utility must do a proper check of all the connections and verify the connections using
injection kit.
2. The system near about Akola (Akola, Wardha, Koradi, Chandrapur, Khaparkheda &
Aurangabad) is complex and have many complexities as regards to Main/Backup
protection settings. A coordinated setting of Main/backup relays at the complex of
Akola is required to be arrived at, considering the In-feed/Out-feed effect by
simulating faults at various locations. Hence the traditional/Ramkrishna Committee
recommendations would be required to deviate.
PGCIL, Maharashtra STU, M/s MEGPTCL and indiabulls representatives in co
ordination with WRLDC may sit together and decide proper settings.
3. Utility intending to connect new elements to either STU network/CTU network
should get all the settings verified from STU/CTU and STU/CTU shall make an effort
to revise & co-ordinate the relay settings in the nearby system.
4. WRLDC/SLDC instruction to be strictly adhered while carrying out any work in the
Interconnected Grid. Any online relay work if need to be performed should be first
informed to respective SLDC or RLDC for permission.
Overvoltage grading of Akola and nearby stations is required to be done.
WRLDC instruction :
The line was charged based on the confirmation of details from Maharashtra SLDC that
they were receiving the online data of this line at their SCADA system. In view of critical
system conditions, WRLDC have permitted test charging of the line for 15mins only.
After 15 minutes of the line charging, the line should have been switched off.
Unfortunately the fault occurred on the line just after 15mins.Therefore in case of any
issue this should have also been reported to WRLDC as the data of this line was not
available at WRLDC end. Also WRLDC may review its policy, as to why test charging of
lines for such a small durations are permitted. Policy may be discussed in OCC.
Non-Availability Data of Maharashtra System at WRLDC SCADA
The most of the Maharashtra system real-time data from Maharashtra system was not
available at WRLDC, which makes system monitoring in Maharashtra at WRLDC very
difficult. WRLDC has to rely completely on Maharashtra SLDC.
A-~ J:H~c-. c..c...... ~ ~
IS-:~ •
List of Participants for Protection meeting held on 16.10.2015 at WRPC, MumbaiS.No. Name Designation Organisation e-rnail Mobile No. signature
C ~ IrRRrN'r\.S J-.( ( (lkPl-NG!<.St:A- K Dy. Mq r WR.L-OL cWbtCl- -~,.o(~@Y~t Iv\.qB 6q Oa t{~q2.. Q~1 V-i:..q( I I f
2 ~~~~(Cl,v.Q~' ~'0 .., '",.rf-Lrp c 4~(l...<,...,K. I.t<>-li", Q5•.;'L p-t{ S2-0 Lf /) ~ .r2 .... -se:t.. --""v'/W
3 'r<:~ Wo..O'1o.A~ M'». W IVL, \"0 wm~\l> CV"C(MJ\ @J>~JI·N\ c, !(,p,,," :14 Z..':?7CZSLf'1 .~
~1Y16~ :Javo~~ 1e4~ ~e;:t:; ',td-zr~P<n-v-€."- j-tJ Q.lAJo..l e.@tcljawer. 32.2.331,4(5 / ....b4 clJ-rry V ..
P~V'0 ~ A m..tAO I ",""/ Sf/TLL C~-eIra1 M~CTC se)S'OO~'~~LC!(~~l~5 ~ --- VI /'-II ,~ l""w'~ a r.se 2"L ,t
U <L-€...l' ~ u ~ vV'-"-UV ~ o OJ -r I" , J ,~ \i6 ~ct.,eJ-a~ « a ~GllPa.t~. A~.!\· ~~ t-.1..5 12\~L d.., (It. u~2. (! #to, 4ft,1w.,,,j l.b ~ I). e S-~Lf~ ~-' 1({, ~ f17 ~ ""'''
8 S~ay ~ i~~ A-,.P.L(~ $a.~ i~t.blu-tt- e2 o..rbOtJ'.cP. ~ q o q r~ §2-?( fi}1...,
9 .10
11
12
13
14
15
1617
18
SLD of Akola2 & nearby System
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
-
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
400 kV
400 kV
400 kV
400 kV
Time: 13:34:45:335
765 kV
220 kV
Annex-2
SLD of Akola2 & nearby System
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
-
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
400 kV
400 kV
400 kV
400 kV
Time: 13:34:45:335 998 MW
←357 MW
←357 MW
←194 MW
←194 MW
←666 MW
765 kV
Relay Indication and Tripping Time Annexure III
Element Tripping Time
at End 1 Indication
Tripping Time
at End 2 Indication
765/400 kV 1500 MVA ICT at Akola-II 14:03:56.621 Intertrip command 14:03:56.621
ICT tripping initiated from 51NS function of
the ABB make relay REL670, which is
connected with Neutral CT of ICT, Setting is
20% of FLC (2165 A), DT time delay of 1.5
Second. The fault current was @ 1600 Amp.
400 kV Akola 2-Taptitanda I 14:04:09.108 O/V Stage 1 Operated, DT Send 14:04:09.128 Tripped on DT Receipt from Remote end
400 kV Akola 2-Taptitanda II -
Remained charged and feeding fault
to system due to non-operation of
protection. Hand Tripped
- Was not charged from this end
400 kV Akola 2-Akola I 14:04:09.116 O/V Stage 1 Operated 14:04:09.116 DT Receipt
400 kV Akola 2-Akola II - No tripping 14:04:09:745 Zone 3 Protection Operated
400 kV Akola 2-Indiabull I 14:04:09.082 Stage 1 O/V Operated 14:04:09.116
O/V Stage 1 start at 14:03:56.687 O/V Stage
1 Trip , Vr=289 kV , Vy=189 kV, Vb=184 kV.
DT Send , DT received
400 kV Akola 2-Indiabull II 14:04:09.078 DT receipt from Remote end 14:04:09.116
O/V Stage 1 start at 14:03:56.688. O/V
Stage 1 Trip , Vr=280. kV , Vy=190 kV,
Vb=183 kV, DT Send , DT received
400 kV Akola –Bhusawal Pending Pending 14:04 Zone 3 tripping
400 kV Akola-Aurangabad (PG) I
14:04:09.128 O/V Stage 1 Trip, DT send, DT
Received 14:04:09.127 DT Receipt
400 kV Akola-Aurangabad (PG) II 14:04:15.746 O/V Stage 1 Trip, Vr=252 kV , Vy=251 14:04:15.746 DT Receipt
kV, Vb=253 kV DT send, DT Received
400 kV Akola-Indiabulls 14:04:09.099 DT receipt from Remote end 14:04:09.058
O/V Stage 1 start at 14:03:56.689. O/V
Stage 1 Trip , Vr=280. kV , Vy=191 kV,
Vb=183 kV, DT Send , DT received
400 kV Akola-Wardha I 14:04:09.128
O/V stage 1 protection operated at
Wardha end due to open end. Vr=278
kV , Vy=193 kV, Vb=184 kV, DT Send ,
DT received
14:03:58.250 B Phase to E/F , Zone 3 Start 14:03:57.608,
Zone 2 start at 14:03:57.250, Zone 2 trip
400 kV Akola–Wardha II 14:03:58:329 Vr=253 kV , Vy=176 kV, Vb=200 kV DT
Received 14:03:58.250
B Phase to E/F , Zone 3 Start 14:03:57.559,
Zone 2 start at 14:03:57.250, Zone 2 trip
400/220 kV, 315 MVA ICT at Akola 14:03:57.739 Intertrip 14:03:57.739 Direction O/C protection at 220 kV end
400 kV Indiabulls- Koradi-II 14:04:09.058 O/V start at 14:03:56.687, DT
Received 14:03:59.050 Tripped on Zone 3
Koradi Unit 1 14:04 Tripped on Standby Earth fault
protection of GT - -
Indiabulls Unit 2,3,5 14:04
Generator tripped on Zigzag E/F
protection due to unbalanced current
followed by Tripping of turbine on
over frequency
- -
Event Sequence Annexure IV
Time Sub-station Indication
13:34:45.335 Akola2 400 kV Akola2-Taptithanda 2 circuit was ideal charged from Akola
13:34:47.394 Akola2 VT Fuse Fail Alarm for the 400 kv Akola2-Taptithanda 2
14:03:55.000 Indiabulls Power Swing Detected at India bulls by 400 kV Akola2-Indiabulls 1 & 2 and Akola-Indiabulls circuit at Indiabulls end.
14:03:55.093 Akola2 Power swing sensed by 765 kV Akola2-Koradi3 1 & 2 circuit.
14:03:55.100 Akola2 Stub Protection starts for 400 kV Akola2-Taptithanda 2
14:03:55.107 Akola2 Delayed E/F protection start, Standby E/F protection start for 765/400 kV ICT 1
14:03:55.249 Akola Directional E/F protection picked up for 400/220 kV ICT
14:03:56.621 Akola2 765/400 kV ICT 1 tripped on 51 N Protection (Sensitive Earth Fault Protection) from 400 kV and intertrip command to 765 kV side
14:03:56.677 Akola2 Over voltage stage 1 start for 400 kV Akola2-Indiabulls 1 & 2 , 400 kV Akola2-Akola 2, 400 kV Akola-Taptithanda 1
14:03:56.687 Indiabulls 400 kV Akola2-Indiabulls 1 & 2, Akola-Indiabulls and Koradi2-Indiabulls lines O/V stage 1 got picked up.
14:03:57.250 Wardha B Phase to E/F, Zone 2 start and trip for 400 kV Wardha-Akola 1 & 2
14:03:57.559 Wardha B Phase to E/F , Zone 3 Start for 400 kV Wardha-Akola 2
14:03:57.592 Akola 400 kV Wardha-Akola1 & 2 picked up fault in reverse Zone
14:03:57.608 Wardha B Phase to E/F , Zone 3 Start for 400 kV Wardha-Akola 1
14:03:57.739 Akola 400/220 kV ICT tripped on Directional O/C protection
14:03:57.913 Akola Overvoltage Stage 1 picked up for 400 kV Akola-Akola2 1 circuit
14:03:58.287 Koradi2 Zone 3 start on 400 kV Indiabulls-Koradi2
14:03:58.316 Akola2 Over voltage stage 1 start for 400 kV Akola2-Akola 1
14:03:58.329 Akola DT receipt for 400 kV Wardha-Akola2
14:03:58.710 Akola Overvoltage Stage 1 picked up for 400 kV Akola-Akola2 2 circuit.
14:03:59.050 Koradi2 Zone 3 trip on 400 kV Indiabulls-Koradi2
14:04:00.105 Akola2 Broken Conductor alarm for 400 kV Akola2-Taptithanda 2 circuit.
14:04:00.408 Akola Power swing detected by 400 kV Akola-Bhusawal circuit
14:04:01.727 Wardha SPS for 400 kV Wardha-Parli D/C operated.
14:04:06.563 Akola2 Over voltage stage 1 reset for 400 kV Akola2-Akola 1 & 2 and 400 kV Akola2-Taptithanda 1
14:04:07.099 Akola2 Over voltage stage 1 started again for 400 kV Akola2-Akola 2.
14:04:07.108 Akola2 Over voltage stage 1 started again for 400 kV Akola2-Akola 1
14:04:07.182 Akola2 Over voltage stage 1 started again for 400 kV Akola2-Taptithanda
14:04:07.526 Akola2 Over voltage stage 1 reset again for 400 kV Akola2-Taptithanda
14:04:07.684 Akola2 Over voltage stage 1 reset again for 400 kV Akola2-Akola 1
14:04:07.707 Akola2 Over voltage stage 1 reset again for 400 kV Akola2-Akola 2
14:04:09.000 Akola 400 kV Akola-Wardha 1 tripped on Stage O/V 1 operated.
14:04:09.058 Indiabulls O/V stage 1 operated for 400 kV Akola-Indiabulls circuit and it tripped and DT was send to remote end. 400 kV Indiabulls-Koradi 2 circuit tripped from DT from Remote end.
14:04:09.078 Akola2 DT received for 400 kV Akola2-Indiabulls 1 from remote end
14:04:09.082 Akola2 Over Voltage stage 1 operated for Akola2-Indiabulls2 2
14:04:09.099 Akola2 Over voltage stage 1 started again for 400 kV Akola2-Akola 2
14:04:09.108 Akola2 Over voltage stage 1 started again for 400 kV Akola2-Taptithanda and Master Trip issued
14:04:09.116 Akola2 Over voltage stage 1 started again for 400 kV Akola2-Akola 1 and Master Trip issued.
14:04:09.116 Indiabulls Akola2-Indiabulls 1 & 2 circuit tripped on O/V stage 1 operation and DT was send to remote end.
14:04:09.127 Aurangabad(PG) 400 kV Akola-Aurangabad(PG) 1 tripped on DT receipt
14:04:09.128 Akola 400 kV Akola-Aurangabad (PG) I O/V stage 1 operated
14:04:09.128 Akola 400 kV Akola-Akola2 1 tripped on Stage O/V 1 operated.
14:04:09.745 Akola 400 kV Akol-Akola2 2 tripped on Zone 3 Protection operation.
14:04:15.746 Aurangabad(PG) 400 kV Akola-Aurangabad(PG) 2 tripped on DT receipt
14:10:40.126 Wardha SPS for 400 kV Wardha-Parli D/C operated.
14:11:59.634 Wardha SPS for 400 kV Wardha-Parli D/C operated.
14:12:03.305 Wardha SPS for 400 kV Wardha-Parli D/C operated.
14:12:10.035 Wardha SPS for 400 kV Wardha-Parli D/C operated.
11/2/2015
1
“Towering Excellence”
WELCOME
Review of Occurrence at 765/400 kV substation Akola II
[MEGPTCL] On 29th March 2015
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda MSETCL)
400 kV
400 kV
400 kV
400 kV
765 kV
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
-
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
400 kV
400 kV
400 kV
400 kV
Line charged with other end open with a permission for 10 min
Time: 13:34:45:335 998 MW
←357 MW
←357 MW
←194 MW
←194 MW
←666 MW
765 kV
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Time: 14:03:55:090
Time: 00:00:00:000
Fault on AKL II – AUG CKT I not cleared at AKL II Fault current = 3.448 kA
Fault not cleared as VT fuse failure since 13:34:47.394
400 kV
400 kV
400 kV
400 kV
765 kV
11/2/2015
2
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV
Aurangabad (Taptitanda)
Time: 14:03:56:621
Time: 00:00:01:536 Tripped on Sensitive E/F
Fault current fed = 1.635 kA
If = 3.448 kA
Elapsed Time
B PH
• Fault current in B ph of Akola II – Taptitanda Ckt. II – 3448 A.
• Out of 3448A, 1635A was fed by 765/400kV ICT. Remaining 1800 A was shared by
Akola II – Nandgaon I & II, Akola-I - Akola II Ckt I & II and Akola – Taptitanda - I lines.
Due to sharing, above lines fed very low magnitude of current which was not sufficient to operate/pickup distance relay. During this time none of the remote end relays picked up / operated.
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Time: 14:03:57:684
Tripped on LV Dir. E/F Ir = 0.49 A, Iy = 0.36 A, Ib = 0.26 A, In = 0.62 A
Time: 00:00:02:594
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Time: 14:03:58:250
Tripped on Zone II & III, Y Ph, 209 km, IR = 1000 A, IY = 1380 A, IB = 830 A, IN = 220 A, Unbal
Time: 00:00:03:160
11/2/2015
3
• High current in Y ph at Wardha is not in commensuration with the fault on B ph of Taptitanda-II line.
• This is not a genuine fault.
• This might have been resulted due to tripping of ICTs.
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Time: 14:03:58:329
Tripped on DT receive
Time: 00:00:03:239
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Time: 14:04:09:058
Tripped on O/V
Time: 00:00:13:968
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Time: 14:04:09:069
Tripped on DT receive
Time: 00:00:13:979
Tripped on O/V
Tripped on Zone III
11/2/2015
4
• At this time another fault developed on the 400 kV Akola II – Taptitanda Ckt. II.
• M/s MEGPTCL reported that Y ph subconductor of the line got loosened and touched the tower member at loc. 327 at 147 km.
• Two sources were feeding this fault.
• At Koradi, the Koradi – Nandgaon Peth line, which was feeding this fault tripped in Zone III, Y ph.
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Time: 14:04:09:073
Tripped on O/V
Time: 00:00:13:983
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
*
Time: 14:04:09:073
Tripped on DT receive
Time: 00:00:13:983
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Time: 14:04:09:074
Time: 00:00:13:984
Tripped on O/V, DT receive / send
Tripped on O/V, DT receive / send
11/2/2015
5
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Time: 14:04:09:078
Time: 00:00:13:988
Tripped on O/V
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Time: 14:04:09:094
Time: 00:00:14:004
Tripped on O/V
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
• -
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Time: 14:04:09:099
Time: 00:00:14:004
Tripped on DT
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Time: 14:04:09:107
Time: 00:00:14:017
Tripped on O/V
Tripped on DT recieve
Tripped on O/V
11/2/2015
6
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Time: 14:04:09:158
Time: 00:00:14:017
Tripped on DT
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Time: 14:04:09:745
Time: 00:00:14:655
Tripped on Zone III, Y Ph & B Ph
• The second time fault on the 400 kV Akola II – Taptitanda Ckt. II was now being fed by Bhusaval – Akola I – Akola II Ckt II.
• The Akola I – Akola II Ckt. II tripped in Zone III, Y & B ph.
• The subconductor might then have swung and came near B ph conductor, hence B ph detected.
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Time: 14:04:09:750
Tripped on Zone III, Y Ph & B Ph
Time: 00:00:14:810
11/2/2015
7
• The second time fault on the 400 kV Akola II – Taptitanda Ckt. II was now being fed by Bhusaval – Akola I – Akola II Ckt II.
• The Akola I – Akola II Ckt. II tripped in Zone III, Y & B ph.
• The subconductor might then have swung and came near B ph conductor, hence B ph detected.
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Time: 14:04:15:694
Tripped on O/V
Time: 00:00:20:604
Tripped on DT
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Time: 14:04:09:745*
Time: 00:00:14:655
Hand Tripped
400 kV Bhusaval 400 kV Akola I 400 kV Nandgaon Peth 400 kV Koradi
400 kV Wardha (PG)
400 kV Akola II
400 kV
Aurangabad (PG)
765 kV Koradi
765 kV Akola II
400 kV Aurangabad
(Taptitanda)
Hand Tripped
Disturbance Recorder Files Annexure VI
1. Indiabulls Sub-station
Figure : Akola2-Indiabulls 1
Trigger29-03-2015
14:04:09.059
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
LINE_A_IL1/A
0
10
20
30
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
LINE_A_IL2/A
0
25
50
75
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
LINE_A_IL3/A
0
25
50
75
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
LINE_A_IN/A
0
5
10
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
LINE_A_UL1/kV
0
100
200
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
LINE_A_UL2/kV
0
50
100
150
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
LINE_A_UL3/kV
0
50
100
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
LINE_A_UN/kV
0
50
100
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
MUTUAL_COMP/A
0
50
100
150
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
DT_SENDDT_RECD_CH1
86B_OPTDM2_RLY_DC_FAI
BB_OPTD86A_OPTD
CB_BPH_OPENCB_YPH_OPENCB_RPH_OPEN
TOV1-STARTTOV1-TRIP
ZM05-STARTZM04-STARTZM03-STARTZM02-STARTZM01-START
TRIP2 L3TRIP2 L2TRIP2 L1
TRIP2_TRIPTRIP1 L3TRIP1 L2TRIP1 L1
TRIP1_TRIP
Figure : Akola2-Indiabulls 2
Trigger29-03-2015
14:04:09.106
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
LINE_A_IL1/A
0
50
100
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
LINE_A_IL2/A
0
25
50
75
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
LINE_A_IL3/A
0
25
50
75
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
LINE_A_IN/A
0
50
100
150
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
LINE_A_UL1/kV
0
100
200
300
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
LINE_A_UL2/kV
0
100
200
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
LINE_A_UL3/kV
0
50
100
150
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
LINE_A_UN/kV
0
100
200
300
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
FF_BLKUFUSE_FAIL
DT_SENDDT_RECD_CH1
86B_OPTDM2_RLY_DC_FAI
BB_OPTD86A_OPTD
CB_BPH_OPENCB_YPH_OPENCB_RPH_OPENCAR_REC_CH2
CARR_SW_OUT_PTOV1-START
TOV1-TRIPZM04-START
ZM04-TRIPZM03-START
ZM03-TRIPZM02-START
ZM02-TRIPZM01-START
ZM01-TRIPTRIP2 L3TRIP2 L2TRIP2 L1
TRIP2_TRIPTRIP1 L3TRIP1 L2TRIP1 L1
TRIP1_TRIP
Figure : Indiabulls-Akola line
Trigger29-03-2015
14:04:09.058
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
LINE_A_IL1/A
0
25
50
75
100
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
LINE_A_IL2/A
0
50
100
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
LINE_A_IL3/A
0
50
100
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
LINE_A_IN/A
0
25
50
75
100
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
LINE_A_UL1/kV
0
50
100
150
200
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
LINE_A_UL2/kV
0
50
100
150
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
LINE_A_UL3/kV
0
50
100
150
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
LINE_A_UN/kV
0
50
100
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5
DT_RECD_CH186B_OPTD
M2_RLY_DC_FAIBB_OPTD
86A_OPTDCB_BPH_OPENCB_YPH_OPENCB_RPH_OPENCAR_REC_CH1
TOV1-STARTTOV1-TRIP
ZM04-STARTZM03-STARTZM02-STARTZM01-START
TRIP2 L3TRIP2 L2TRIP2 L1
TRIP2_TRIPTRIP1 L3TRIP1 L2TRIP1 L1
TRIP1_TRIP
Figure : Indiabulls-Koradi2 line
Trigger29-03-2015
14:04:09.069
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
LINE_A_IL1/A
0
25
50
75
100
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
LINE_A_IL2/A
0
25
50
75
100
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
LINE_A_IL3/A
0
25
50
75
100
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
LINE_A_IN/A
0
25
50
75
100
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
LINE_A_UL1/kV
0
100
200
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
LINE_A_UL2/kV
0
100
200
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
LINE_A_UL3/kV
0
100
200
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
LINE_A_UN/kV
0
100
200
t/s-0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
FF_BLKUFF_BLKZ
FUSE_FAILDTR_CH-II
DT_SEND_CH186B_OPTD86A_OPTD
CB_BPH_OPENCB_YPH_OPENCB_RPH_OPEN
AR01-INHBITTOV1-START
TOV1-TRIP
Figure : Akola-Aurangabad(PG) 2
Trigger29-03-2015
14:04:15.732
t/s-0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
iL1/A
0
50
100
t/s-0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
iL2/A
0
50
100
t/s-0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
iL3/A
0
50
100
t/s-0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
uL1/kV
0
100
200
t/s-0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
uL2/kV
0
100
200
t/s-0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
uL3/kV
0
100
200
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
DTRecCH2DTRecCH1
MainBBoptdMainCBBOpMainCBYOpMainCBROp
Main2TrpDTSend
TCB B OpenTCB Y OpenTCB R Open
Uph-e>(>) TRIPUph-e> PickupRelay TRIP L3Relay TRIP L2Relay TRIP L1
EF Trip>Trig.Wave.Cap.
Figure : Akola-Wardha 2
Trigger29-03-2015
14:03:57.593
t/s-0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
K1:iL1/kA
0.00
0.25
0.50
0.75
t/s-0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
K1:iL2/kA
0.0
0.5
1.0
t/s-0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
K1:iL3/kA
0.00
0.25
0.50
0.75
t/s-0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
K1:uL1/kV
0
100
200
t/s-0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
K1:uL2/kV
0
100
200
t/s-0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
K1:uL3/kV
0
50
100
150
t/s-0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
K2:iEp/kA
0.0
0.5
1.0
t/s-0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
DTRECEIVE2DTRECEIVE1DT SENDCH2DT SENDCH1
MainCBBOpMainCBYOpMainCBROpMainARsuc
Uph-e>(>) TRIPRelay TRIP
EF TripEF Pickup
Dis. Pickup Z5Dis. Pickup Z4Dis. Pickup Z3Dis. Pickup Z2
Dis. reverseDis. forward
Dis.Pickup EDis.Pickup L3Dis.Pickup L2Dis.Pickup L1
Dis.T.SEND>Trig.Wave.Cap.
3. Aurangabad (PG) Sub-Station
Figure : Akola-Aurangabad (PG) 1 at the start of event at Akola2 Sub-station
Trigger29-03-2015
14:03:59.053
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VA/kV
50
100
150
200
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VB/kV
75
100
125
150
175
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VC/kV
50
100
150
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VN/kV
5
10
15
20
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IA/A
0
100
200
300
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IB/A
0
100
200
300
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IC/A
0
100
200
300
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
UnusedAny Start
ZCOM TRIPR16-DT SEND CH-2R15-DT SEND CH-1
DIST Sig. SendIN>1 Trip
SOTF/TOR TripZONE-4 TRIPZONE-3 TRIPZONE-2 TRIPZONE-1 TRIP
LBB OPTD-M/T BAYBB PROTN OPTD
I>4 TripPower Swing
V>2 TripV>1 Trip
GRP-A 86A OPTDDT RECEIVED CH-2DT RECEIVED CH-1CARR.RECEIV CH-2R10-Y-PH TCB TC1
R18-CAR.SEND CH2MAIN-2 RLY OPTD
R13-GENERAL TRIPTIE CB B-PH OPENTIE CB Y-PH OPENTIE CB R-PH OPENMAIN CB B-PH OPNMAIN CB Y-PH OPNMAIN CB R-PH OPN
Figure : Akola-Aurangabad(PG) 1 tripping on DT receipt from remote end
Trigger29-03-2015
14:04:09.127
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VA/kV
50
100
150
200
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VB/kV
100
200
300
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VC/kV
50
100
150
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VN/kV
0
100
200
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IA/A
0
100
200
300
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IB/A
0
100
200
300
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IC/A
0
100
200
300
400
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IN/A
0
50
100
150
200
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
UnusedAny Start
ZCOM TRIPR16-DT SEND CH-2R15-DT SEND CH-1
ZONE-4 TRIPZONE-3 TRIPZONE-2 TRIPZONE-1 TRIPPower Swing
V>2 TripV>1 Trip
GRP-A 86A OPTDDT RECEIVED CH-2DT RECEIVED CH-1CARR.RECEIV CH-2TIE CB B-PH OPENTIE CB Y-PH OPENTIE CB R-PH OPENMAIN CB B-PH OPNMAIN CB Y-PH OPNMAIN CB R-PH OPN
Figure : Akola-Aurangabad(PG) 2 tripping on DT receipt from remote end
Trigger29-03-2015
14:04:15.746
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VA/kV
50
100
150
200
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VB/kV
0
50
100
150
200
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VC/kV
0
100
200
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VN/kV
0
50
100
150
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IA/A
0
100
200
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IB/A
0
100
200
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IC/A
0
100
200
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IN/A
10
20
30
40
50
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
R16-DT SEND CH-2R15-DT SEND CH-1
SOTF/TOR TripZONE-4 TRIPZONE-3 TRIPZONE-2 TRIPZONE-1 TRIP
I>4 TripPower Swing
V>2 TripV>1 Trip
GRP-A 86A OPTDDT RECEIVED CH-2DT RECEIVED CH-1CARR.RECEIV CH-2R10-Y-PH TCB TC1
R18-CAR.SEND CH2MAIN-2 RLY OPTD
R13-GENERAL TRIPTIE CB B-PH OPENTIE CB Y-PH OPENTIE CB R-PH OPENMAIN CB B-PH OPNMAIN CB Y-PH OPNMAIN CB R-PH OPN
4. Wardha Sub-Station
Figure : Wardha-Akola 1 tripping on Zone 2
Trigger29-03-2015
14:03:57.608
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VA/kV
50
100
150
200
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VB/kV
100
150
200
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VC/kV
50
100
150
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VN/kV
0
50
100
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IA/kA
0.00
0.25
0.50
0.75
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IB/kA
0.0
0.5
1.0
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IC/kA
0.00
0.25
0.50
0.75
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IN/A
0
100
200
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
DIST Trip BZ3Z2
TIE CB B OPENTIE CB Y OPENTIE CB R OPEN
Any TripAny Trip
MAIN CB B-OPENMAIN CB Y-OPEN
MAIN CB R- OPEN
Figure : Wardha-Akola 2 tripping on Zone 2
Trigger29-03-2015
14:03:57.559
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VA/kV
0
100
200
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VB/kV
0
50
100
150
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VC/kV
0
50
100
150
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
VN/kV
0
50
100
150
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IA/kA
0.00
0.25
0.50
0.75
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IB/kA
0.0
0.5
1.0
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IC/kA
0.00
0.25
0.50
0.75
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
IN/A
0
200
400
t/s-0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
Z3Z2
TIE CB B OPENTIE CB Y OPENTIE CB R OPEN
DIST FwdAny Trip
MAIN CB B-OPENMAIN CB Y-OPEN
MAIN CB R- OPEN
5. Akola2 Sub-station
Figure : Akola2-Taptithanda line
Trigger29-03-2015
14:04:09.206
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
LINE_A_IL1/mA
-0
200
400
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
LINE_A_IL2/mA
-0
200
400
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
LINE_A_IL3/mA
-0
200
400
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
LINE_A_IN/mA
-0
200
400
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
LINE_VT_UL1/V
0
25
50
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
LINE_VT_UL2/V
0
25
50
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
LINE_VT_UL3/V
0
25
50
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
LINE_VT_ULN/V
0
25
50
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
FUSE_FAIL
TOV1-START
TOV1-TRIP
TUV1-START
TUV1-TRIP
Figure: Akola2-Akola 1 line
Trigger29-03-2015
14:04:07.108
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
LINE_A_IL1/A
0
50
100
150
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
LINE_A_IL2/kA
0.00
0.25
0.50
0.75
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
LINE_A_IL3/kA
0.00
0.25
0.50
0.75
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
LINE_A_IN/A
0
20
40
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
LINE_VT_UL1/kV
0
100
200
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
LINE_VT_UL2/kV
0
100
200
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
LINE_VT_UL3/kV
0
100
200
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
LINE_VT_ULN/kV
0
100
200
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25
FUSE_FAILDTS FEEDBACK
AR01-STARTTIE_3PH_PRP
MAIN_3PH_PRPAR01-INHBITTOV1-START
TOV1-TRIPTUV1-START
TUV1-TRIP
Figure : Akola2-Indiabulls 1 line
Trigger29-03-2015
14:04:09.082
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75
LINE_A_IL1/A
0
50
100
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75
LINE_A_IL2/A
0
50
100
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75
LINE_A_IL3/A
0
50
100
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75
LINE_A_IN/A
0
50
100
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75
LINE_VT_UL1/kV
0
100
200
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75
LINE_VT_UL2/kV
0
100
200
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75
LINE_VT_UL3/kV
0
100
200
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75
LINE_VT_ULN/kV
0
100
200
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75
FUSE_FAILTIE_3PH_PRP
MAIN_3PH_PRPDTS FEEDBACK
AR01-INHBITTOV1-START
TOV1-TRIPTUV1-START
TUV1-TRIPZM05-STARTZM04-STARTZM03-STARTZM02-STARTZM01-START
TRIP2 L3TRIP2 L2TRIP2 L1
TRIP2_TRIPTRIP1 L3TRIP1 L2TRIP1 L1
TRIP1_TRIP
Figure : Akola2-Indiabulls 2 line
Trigger29-03-2015
14:04:09.173
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
LINE_A_IL1/A
0
50
100
150
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
LINE_A_IL2/A
0
50
100
150
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
LINE_A_IL3/A
0
50
100
150
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
LINE_A_IN/A
0
50
100
150
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
LINE_VT_UL1/kV
0
100
200
300
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
LINE_VT_UL2/kV
0
100
200
300
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
LINE_VT_UL3/kV
0
100
200
300
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
LINE_VT_ULN/kV
0
100
200
300
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
FUSE_FAILDTS FEEDBACK
TIE_3PH_PRPMAIN_3PH_PRP
TOV1-STARTTOV1-TRIP
TUV1-STARTTUV1-TRIP
Figure : Akola2-Taptithanda 2
Trigger29-03-2015
14:03:55.100
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50
VA/kV
100
150
200
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50
VB/kV
50
100
150
200
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50
VC/kV
100
150
200
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50
VN/kV
100
150
200
250
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50
IA/A
100
150
200
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50
IB/A
50
100
150
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50
IC/kA
0
1
2
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50
IN/kA
0
1
2
t/s-0.75 -0.50 -0.25 0.00 0.25 0.50 0.75 1.00 1.25 1.50
Z4Z3Z2Z1
DIST Trip CDIST Trip BDIST Trip A
Any TripAny Start
6. Koradi2 Station
Figure: Indiabulls-Koradi2 Line which tripped on Zone 3 from Koradi2 Station
Trigger29-03-2015
14:00:52.385
t/s-0.4 -0.3 -0.2 -0.1 -0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
VA/kV
50
100
150
200
t/s-0.4 -0.3 -0.2 -0.1 -0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
VB/kV
100
150
t/s-0.4 -0.3 -0.2 -0.1 -0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
VC/kV
50
100
150
t/s-0.4 -0.3 -0.2 -0.1 -0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
VN/kV
0
50
100
t/s-0.4 -0.3 -0.2 -0.1 -0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
IA/kA
0.00
0.25
0.50
0.75
1.00
t/s-0.4 -0.3 -0.2 -0.1 -0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
IB/kA
0.0
0.5
1.0
1.5
t/s-0.4 -0.3 -0.2 -0.1 -0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
IC/kA
0.00
0.25
0.50
0.75
1.00
t/s-0.4 -0.3 -0.2 -0.1 -0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
IN/A
0
200
400
t/s-0.4 -0.3 -0.2 -0.1 -0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
PREP 3PH TRIP TPREP 3PH TRIP M
CB B-PH OPENCB Y-PH OPENCB R-PH OPEN
Force 3P TripT3T2T1Z3
DIST Trip CDIST Trip BDIST Trip A
Any TripAny Start