epc project execution orientation course

Post on 06-May-2015

32.929 Views

Category:

Education

5 Downloads

Preview:

Click to see full reader

DESCRIPTION

An overall presentation showing, by means of illustrations, all sides of an EPC Project. Enjoy!

TRANSCRIPT

HERVE BARON

© 2015 – Hervé Baron

The execution of a Complex Project… a guided tour

HERVE BARON

© 2015 – Hervé Baron

The actors

Impossible d’afficher l’image.

The COMPANY

“Client” The EPC Contractor

The suppliers

The sub-contractors

HERVE BARON

© 2015 – Hervé Baron

Conceptual evaluation + Pre-Project

By COMPANY

Basic Engineering By ENGINEERING

Project Execution by EPC CONTRACTOR

Sanction Sanction

The phases

HERVE BARON

© 2015 – Hervé Baron

Design Procurement Manufacturing Shipping

Installation Construction & erection Inspection & tests Hand-over

HERVE BARON

© 2015 – Hervé Baron

The multiple sides of a Project

Hum

an Resources M

anagement

Project Control

PROJECT

HERVE BARON

© 2015 – Hervé Baron

Engineering Sub-Contractor (India) Detail Engineering (part)

Shipyard (Korea) Hull Engineering & Fabrication

Shipyards (Singapore & Malaysia) Topsides Fabrication & Integration

Home office (Paris) •Project management •Detail Engineering (part) •Procurement

Satellite office Detail Engineering (part)

Fabrication yard (Nigeria): Fabrication (part)

Offshore (Nigeria): Installation, commissioning, start-up

The multiple sites of a Project

HERVE BARON

© 2015 – Hervé Baron

Project

Engineering Procurement Construction

HERVE BARON

© 2015 – Hervé Baron

Project

Engineering Procurement Construction

HERVE BARON

© 2015 – Hervé Baron

Process facilities:

Feedstock and products flow

Feedstock composition

Battery limit conditions

Equipment Spare

Performance:

Products specifications

Energy efficiency, emissions

Utilities:

Electric power supply

Other utilities

Systems:

Process control

Fire/gas alarm

Public address, LAN, PABX

Infrastructure:

Administrative and technical buildings

Control room

Access road

Site fencing, gates, check point

Design criteria:

% of over design

Environment data:

Min/max temperature

Rain/snow fall

Wind

Geological conditions

Applicable codes and standards:

International standards

Local rules

0 5

10 15 20 25 30 35 40 45 50

-85 -80 -75 -70 -65 -60 -55

Pre

ssu

re (

ba

r)

The facilities design basis

HERVE BARON

© 2015 – Hervé Baron

Engineering Documents for Purchase:

bill of quantity & specification

Documents for Construction:

Construction drawings & specifications

Design basis:

- Functional requirements

- Client specifications

- Design codes

Engineering in the Project

HERVE BARON

© 2015 – Hervé Baron

Project

Engineering

Instruments& Control

Layout & Piping Process Electrical Equipment Civil Safety

Procurement Construction

HERVE BARON

© 2015 – Hervé Baron

Project

Engineering

Instruments& Control

Layout & Piping Process Electrical Equipment Civil Safety

Procurement Construction

HERVE BARON

© 2015 – Hervé Baron

Process simulations

HERVE BARON

© 2015 – Hervé Baron

Heat & Material balance

Thermodynamic calculations

Process Flow Diagram (PFD)

HERVE BARON

© 2015 – Hervé Baron

Equipment list

HERVE BARON

© 2015 – Hervé Baron

Equipment duty

HERVE BARON

© 2015 – Hervé Baron

Process data sheet

HERVE BARON

© 2015 – Hervé Baron

Process Flow Diagram (PFD)

HERVE BARON

© 2015 – Hervé Baron

Piping & Instrumentation Diagram (P&ID)

HERVE BARON

© 2015 – Hervé Baron

Piping & Instrumentation Diagram (P&ID)

HERVE BARON

© 2015 – Hervé Baron

Process control

HERVE BARON

© 2015 – Hervé Baron

Emergency shut down

HERVE BARON

© 2015 – Hervé Baron

Emergency relief

HERVE BARON

© 2015 – Hervé Baron

Operating manual

HERVE BARON

© 2015 – Hervé Baron

Project

Engineering

Instruments& Control

Layout & Piping Process Electrical Equipment Civil Safety

Procurement Construction

HERVE BARON

© 2015 – Hervé Baron

Rotating machinery

HERVE BARON

© 2015 – Hervé Baron

Pressure vessels

HERVE BARON

© 2015 – Hervé Baron

Heat exchangers

HERVE BARON

© 2015 – Hervé Baron

Packages,

Fired Equipment

HERVE BARON

© 2015 – Hervé Baron

Process data sheet

Mechanical data sheet

HERVE BARON

© 2015 – Hervé Baron

Material Requisition

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

Project

Engineering

Instruments& Control

Layout & Piping Process Electrical Equipment Civil Safety

Procurement Construction

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

Fire fighting

HERVE BARON

© 2015 – Hervé Baron

Passive fire protection

HERVE BARON

© 2015 – Hervé Baron

Fire & Gas detection layout

HERVE BARON

© 2015 – Hervé Baron

Environmental Impact Assessment

HERVE BARON

© 2015 – Hervé Baron

Project

Engineering

Instruments& Control

Layout & Piping Process Electrical Equipment Civil Safety

Procurement Construction

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

Equipment supporting structures

HERVE BARON

© 2015 – Hervé Baron

Piping supporting structures (pipe-racks)

HERVE BARON

© 2015 – Hervé Baron

Structural design

HERVE BARON

© 2015 – Hervé Baron

Structural design

HERVE BARON

© 2015 – Hervé Baron

Structural drawings

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

Architectural drawings

Equipment layout drawing

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

Project

Engineering

Instruments& Control

Layout & Piping Process Electrical Equipment Civil Safety

Procurement Construction

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

Layout/

principles

HERVE BARON

© 2015 – Hervé Baron

Layout/consideration for all networks

HERVE BARON

© 2015 – Hervé Baron

General Plot Plan

HERVE BARON

© 2015 – Hervé Baron

Piping Layout drawing

HERVE BARON

© 2015 – Hervé Baron

3D modelling

HERVE BARON

© 2015 – Hervé Baron

3D model review

3D model clash check

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

Piping Design

Design code for Process plants: ASME B31.3

)(

PY 2SWED * Pt+

=

P design pressure D (outside) diameter S stress value for material as per table in ASME B31.3 W weld joint reduction factor – for long term strength of weld at elevated temperature E quality factor, from table in ASME B31.3 (1 for seamless, 0.85 for ER welded pipe, etc.) Y coefficient from table in ASME B31.3 (from 0.4 to 0.7 depending on material and temperature)

To the above calculated thickness shall be added: - The corrosion allowance, e.g., 3 mm - The manufacturing tolerance: 12.5%

HERVE BARON

© 2015 – Hervé Baron

Thickness (mm) Number of passes

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

Isometric drawing

HERVE BARON

© 2015 – Hervé Baron

Piping Pre-fabrication

HERVE BARON

© 2015 – Hervé Baron

Piping General Arrangement drawing

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

Standard Pipe Support drawings

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

Material Selection

HERVE BARON

© 2015 – Hervé Baron

Material Specification

HERVE BARON

© 2015 – Hervé Baron

Material Specification

HERVE BARON

© 2015 – Hervé Baron

Project

Engineering

Instruments& Control

Layout & Piping Process Electrical Equipment Civil Safety

Procurement Construction

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

Instrument data sheet

HERVE BARON

© 2015 – Hervé Baron Process Control System

HERVE BARON

© 2015 – Hervé Baron

System architecture drawing

HERVE BARON

© 2015 – Hervé Baron

Mechanical Equipment Control

HERVE BARON

© 2015 – Hervé Baron

PT JB

Process line

Marshalling

cabinet

Controller

cabinet

Instrument room Control room

VDU

CPU

LAN Secondary cable

Multi cable

The instrumentation hardware

HERVE BARON

© 2015 – Hervé Baron

Building detail drawing/Telecom and PAGA layout

HERVE BARON

© 2015 – Hervé Baron

Cable routing drawings

Cable list

HERVE BARON

© 2015 – Hervé Baron Cable routing inside technical rooms

HERVE BARON

© 2015 – Hervé Baron

Project

Engineering

Instruments& Control

Layout & Piping Process Electrical Equipment Civil Safety

Procurement Construction

HERVE BARON

© 2015 – Hervé Baron

Electrical consumers list

HERVE BARON

© 2015 – Hervé Baron

Electrical Load Summary

HERVE BARON

© 2015 – Hervé Baron

Electrical distribution

HERVE BARON

© 2015 – Hervé Baron

General One Line Diagram

HERVE BARON

© 2015 – Hervé Baron

Generators

Switchgear

Transformer

Equipment

specification

HERVE BARON

© 2015 – Hervé Baron

Electrical equipment layout

HERVE BARON

© 2015 – Hervé Baron

Electrical Control System

HERVE BARON

© 2015 – Hervé Baron

Process design

PFDs

H&M balance

HERVE BARON

© 2015 – Hervé Baron

Process design

PFDs

H&M balance

Rotating Pressure vessels Fired equipment Heat exchangers Packages etc.

Process data sheet

Equipment specification

HERVE BARON

© 2015 – Hervé Baron

Process design

PFDs

H&M balance

P&IDs

HERVE BARON

© 2015 – Hervé Baron

Process design

PFDs

H&M balance

Rotating Pressure vessels Fired equipment Heat exchangers Packages etc.

P&IDs

Piping

Instrumentation

Layout

Civil

Electrical

Process data sheet

Equipment specification

Vendor drawings

HERVE BARON

© 2015 – Hervé Baron

Engineering work sequence

Extract from the book: ”The Oil & Gas Engineering Guide”, Hervé Baron, Editions Technip, 2015, page 209

HERVE BARON

© 2015 – Hervé Baron

Typical 3 year EPC Project Engineering schedule

PR = Process, EQ = Equipment, PL = Plant Layout, PI = Piping, I&C = Instrumentation & Control, EL = ELectrcial, HSE = Safety & Environment, CIV = Civil

Extract from the book: ”The Oil & Gas Engineering Guide”, Hervé Baron, Editions Technip, 2015, page 211

HERVE BARON

© 2015 – Hervé Baron

Process design

PFDs

H&M balance

Rotating Pressure vessels Fired equipment Heat exchangers Packages etc.

P&IDs

Piping

Instrumentation

Layout

Civil

Electrical

Process data sheet

Equipment specification

Vendor drawings

HERVE BARON

© 2015 – Hervé Baron

Vendor Instrumentation &

Control

Electrical

Layout

Civil

Piping Process

HERVE BARON

© 2015 – Hervé Baron

Vendor Instrumentation

& Control

Electrical

Layout

Civil

P&ID

Functional analysis

C&E

Terminals dwgs

Power consumption

General Arrangement

Foundation drawing and loads, including auxiliaries!

Piping Purchaser Mechanical connection list and dwg

Process

Utility consumption

Battery limit conditions

Engineering / Vendor interfaces

HERVE BARON

© 2015 – Hervé Baron

A unique synthesis for the busy Project professional 270 pages 300 illustrations

Interested and wanting to know more on Engineering?

© 2015 – Hervé Baron

HERVE BARON

The Oil & Gas Engineering Guide 2nd edition

Order direct from the publisher:

http://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.html

HERVE BARON

© 2015 – Hervé Baron

Project

Engineering Procurement Construction

HERVE BARON

© 2015 – Hervé Baron

Procurement

HERVE BARON

© 2015 – Hervé Baron

Inquiry (Call for Tender)

Short listing

Bid analysis

Clarifications

Negotiations

Purchase Order

Expediting

Inspection

Delivery

Warranty Period

Procurement / Steps

HERVE BARON

© 2015 – Hervé Baron

Procurement / Supplier selection criteria

Technical Compliance

Price

Qualification of supplier

Schedule

Load of workshop

References

References with final Client

Financial situation

Annual turn-over

Internal feed-back

HERVE BARON

© 2015 – Hervé Baron

Procurement

HERVE BARON

© 2015 – Hervé Baron

Expediting

HERVE BARON

© 2015 – Hervé Baron

Expediting

HERVE BARON

© 2015 – Hervé Baron

Inspection

HERVE BARON

© 2015 – Hervé Baron

Inspection

HERVE BARON

© 2015 – Hervé Baron

Shipping

HERVE BARON

© 2015 – Hervé Baron

Shipping

HERVE BARON

© 2015 – Hervé Baron

Shipping

HERVE BARON

© 2015 – Hervé Baron

Project

Engineering Procurement Construction

HERVE BARON

© 2015 – Hervé Baron

Earthworks

HERVE BARON

© 2015 – Hervé Baron

Pipeline

HERVE BARON

© 2015 – Hervé Baron

Pipeline

HERVE BARON

© 2015 – Hervé Baron

Roads

HERVE BARON

© 2015 – Hervé Baron

Buildings

HERVE BARON

© 2015 – Hervé Baron

Admixtures

Sand

Aggregate

Cement

Civil Works

HERVE BARON

© 2015 – Hervé Baron

Civil Works

HERVE BARON

© 2015 – Hervé Baron

Civil Works

HERVE BARON

© 2015 – Hervé Baron

Civil Works

HERVE BARON

© 2015 – Hervé Baron

Civil Works

HERVE BARON

© 2015 – Hervé Baron

Civil Works

HERVE BARON

© 2015 – Hervé Baron

Pre-fabrication

HERVE BARON

© 2015 – Hervé Baron

Erection

HERVE BARON

© 2015 – Hervé Baron

Underground networks

HERVE BARON

© 2015 – Hervé Baron

Plant erection

HERVE BARON

© 2015 – Hervé Baron

Steel structure erection

HERVE BARON

© 2015 – Hervé Baron

Equipment installation

HERVE BARON

© 2015 – Hervé Baron

Equipment installation

HERVE BARON

© 2015 – Hervé Baron

Piping Pre-fabrication

HERVE BARON

© 2015 – Hervé Baron

Piping erection

HERVE BARON

© 2015 – Hervé Baron

Piping erection

HERVE BARON

© 2015 – Hervé Baron

Field Instrumentation Installation

HERVE BARON

© 2015 – Hervé Baron

Electrical equipment connection

HERVE BARON

© 2015 – Hervé Baron

Cable pulling

HERVE BARON

© 2015 – Hervé Baron

Arrangement of Technical rooms

HERVE BARON

© 2015 – Hervé Baron

Cable connections

HERVE BARON

© 2015 – Hervé Baron

Other Systems Field Equipment Installation

HERVE BARON

© 2015 – Hervé Baron

Control room consoles installation

HERVE BARON

© 2015 – Hervé Baron

Testing

HERVE BARON

© 2015 – Hervé Baron

Sub-System

Junction Box

Instrument Loop

Instrument Cable

Mech Equip

Document Folder

Handover System

Elect Equip Circuit

Instrument Tag

Commissioning

HERVE BARON

© 2015 – Hervé Baron

The multiple sides of a Project

Hum

an Resources M

anagement

Project Control

PROJECT

HERVE BARON

© 2015 – Hervé Baron

Project Organisation

Project Manager

Engineering Manager

Project Engineers

Discipline Engineers

Process

Civil

Instrumentation

Electrical

Equipment

Procurement Manager

Purchasers Expediters Inspectors

Site Manager

Construction Manager

Construction Superintendent

Construction supervisor

Construction superintendent

Construction supervisor

Project Control Manager

Contract Manager

Scheduling Manager Cost Control

HERVE BARON

© 2015 – Hervé Baron

Project procedures

HERVE BARON

© 2015 – Hervé Baron

Project temporary facilities

HERVE BARON

© 2015 – Hervé Baron

Project temporary facilities

HERVE BARON

© 2015 – Hervé Baron

Project temporary facilities

HERVE BARON

© 2015 – Hervé Baron

Project temporary facilities

HERVE BARON

© 2015 – Hervé Baron

Project temporary facilities

HERVE BARON

© 2015 – Hervé Baron

Construction Procedures

HERVE BARON

© 2015 – Hervé Baron

HERVE BARON

© 2015 – Hervé Baron

Quality Control

HERVE BARON

© 2015 – Hervé Baron

Slump

Sampling Temperature

Quality Control

HERVE BARON

© 2015 – Hervé Baron

Quality Control

HERVE BARON

© 2015 – Hervé Baron

Cost Control

HERVE BARON

© 2015 – Hervé Baron

Insurance

HERVE BARON

© 2015 – Hervé Baron

Contracts

P.O.

Sub

P.O.

P.O.

Main Contract

Purchase Orders

Sub-Contracts

EPC

Sub

HERVE BARON

© 2015 – Hervé Baron

Contracts

Main Contract

EPC

Terms and Conditions

Price

Schedule

Performance guarantees

Technical basis

Specifications, codes & stds

HERVE BARON

© 2015 – Hervé Baron

Contracts

E P C

HERVE BARON

© 2015 – Hervé Baron

Contracts

∑ + x%

HERVE BARON

© 2015 – Hervé Baron

Construction contracts

Civil

HERVE BARON

© 2015 – Hervé Baron

Construction contracts

Mechanical

HERVE BARON

© 2015 – Hervé Baron

Construction contracts

E&I

HERVE BARON

© 2015 – Hervé Baron

Construction contracts

General Contractor

HERVE BARON

© 2015 – Hervé Baron

Contracts Terms and Conditions

Main Contract

EPC

Obligations of the 2 parties

Limit of liability

Penalties in case of bad performance

Conflict resolution

HERVE BARON

© 2015 – Hervé Baron

Quality Assurance (QA)

HERVE BARON

© 2015 – Hervé Baron

Quality Assurance (QA)

HERVE BARON

© 2015 – Hervé Baron

Quality Assurance (QA)

HERVE BARON

© 2015 – Hervé Baron

Quality Assurance (QA)

HERVE BARON

© 2015 – Hervé Baron

Discipline code

A Instrumentation & Control

C Civil engineering

E Electrical

G Project general documents

J Mechanical

K Safety

M Piping & Layout

P Processes

S Steel Structures

V Vessels – Heat exchangers

W Materials – Welding

Document code

1 Installation drawings

2 Detail drawings

3 Diagrams

4 Lists – Bill of Quantities

5 Isometrics

6 Calculation notes

7 Specifications

8 Data sheets

9 Requisitions

Document Control

HERVE BARON

© 2015 – Hervé Baron

Document Control

HERVE BARON

© 2015 – Hervé Baron

Document Control

Engineering

Documents submitted to client

Client

Approval/

Comments

Vendors

Documents submission Comments

HERVE BARON

© 2015 – Hervé Baron

Intranet / Internet

Intranet / Internet

Breakdown structures

Projects

Interfaces

Reports

Satellite Engineering

Center

Center 1 Sr. Mgmt Center 2 Sr.

Mgmt

Construction Site

Electronic Document Management System

Engineering documents

Vendor documents

Correspondence etc.

Electronic Document Management System

HERVE BARON

© 2015 – Hervé Baron

Interface Management

HERVE BARON

© 2015 – Hervé Baron

7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36PLANT START-UPPIPING PRE-FABRICATION & INSTALLATION X X X X X X X X X XPIPING MATERIAL & DRAWINGS AT SITEPIPING MATERIAL MANUFACTURING & SHIPPING X X X X X XPURCHASE OF PIPING MATERIALTECHNICAL & COMMERCIAL CLARIFICATIONS X XCALL FOR TENDER FOR PIPING MATERIALPREPARE PIPING MATERIAL TAKE-OFF XPIPING ROUTING STUDIES X X XPIPING & INSTRUMENTATION DIAGRAMS (PIDs)

PROJECT SCHEDULEMONTH

1

1

2 3

3

4 5

2

4 5

5

Scheduling

HERVE BARON

© 2015 – Hervé Baron

Critical path of an Oil & Gas Project

Extract from the book: ”The Oil & Gas Engineering Guide”, Hervé Baron, Editions Technip, 2015, page 225

HERVE BARON

© 2015 – Hervé Baron

Progress Monitoring

How would you measure progress?

HERVE BARON

© 2015 – Hervé Baron

Progress Monitoring

HERVE BARON

© 2015 – Hervé Baron

Progress Monitoring

HERVE BARON

© 2015 – Hervé Baron

Progress Monitoring

HERVE BARON

© 2015 – Hervé Baron

15 years ago: 2D

Today: 3D

Tomorrow: 3D & data

IT

HERVE BARON

© 2015 – Hervé Baron

IT

HERVE BARON

© 2015 – Hervé Baron

Safety

HERVE BARON

© 2015 – Hervé Baron

Safety

Guard Rail System with ToeBoards

Cross Bracing

Planking

Runner

Bearer

Longitudinal Brace

Post

Sill

HERVE BARON

© 2015 – Hervé Baron

Safety

HERVE BARON

© 2015 – Hervé Baron

Human resources / career path

3-5 yrs

5 yrs

Graduate Engineer, 25 years old

5-7 yrs

40-45 yrs old Project Manager

Engineering Manager/ Deputy Project Manager

Project Engineer

Process Engineer

Note: the career pattern shown here is a very fast track one to the PM position... One would enjoy oneself just as well taking more time!

© 2015 – Hervé Baron

HERVE BARON

The Oil & Gas Engineering Guide 2nd edition

Do you want to know more... Much more?

© 2015 – Hervé Baron

HERVE BARON

The Oil & Gas Engineering Guide - 2nd edition

Table of Contents

© 2015 – Hervé Baron

HERVE BARON

The Oil & Gas Engineering Guide - 2nd edition

Table of Contents

Discipline presentation: activities and deliverables

© 2015 – Hervé Baron

HERVE BARON

The work of each

Engineering discipline is described

© 2015 – Hervé Baron

HERVE BARON

Design activities are explained, e.g., Plant

Equipment layout

© 2015 – Hervé Baron

HERVE BARON

Complex activities, such as

QRA, are explained through a practical

example.

© 2015 – Hervé Baron

HERVE BARON

A sample of all common Engineering documents is

included

© 2015 – Hervé Baron

HERVE BARON

Difference between

Engineering and Shop drawings

© 2015 – Hervé Baron

HERVE BARON

Understand the main

technical aspects, e.g., DCS vs ESD

© 2015 – Hervé Baron

HERVE BARON

The Oil & Gas Engineering Guide - 2nd edition

Table of Contents

The overall process

© 2015 – Hervé Baron

HERVE BARON

The Oil & Gas Engineering Guide - 2nd edition

Table of Contents

© 2015 – Hervé Baron

HERVE BARON

The Oil & Gas Engineering Guide - 2nd edition

Table of Contents

© 2015 – Hervé Baron

HERVE BARON

The Oil & Gas Engineering Guide - 2nd edition

Table of Contents

© 2015 – Hervé Baron

HERVE BARON

The Oil & Gas Engineering Guide 2nd edition

Order direct from the publisher:

http://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.html

top related