CONSTRUCTION WORKSHOP

FINISHING WORKS OF BUILDING CONSTRUCTION

West raja bazar,house -48Road-1

WALL-

A WALL IS A STRUCTURE THAT DEFINES AN AREA, CARRIES A LOAD, OR PROVIDES SHELTER OR SECURITY

WALL FINISHING

WALL FINISHING STEPS OF WALL FINISHING

CURING TIME OF BRICK- BEFORE BONDING-24 HOUR

MORTARS WIDTH BETWEEN TWO

BRICKS OF MASONRY WALL ½” ,

CURING TIME OF MASONRY BRICK MASONRY WALL 7-14 DAYS BEFORE PLASTER AFTER PLASTERING 7-14 DAYS

WALL FINISHING STEPS OF WALL FINISHING

RATIO OF MORTER

RATIO OF MORTER FOR 5” WALL BONDING 1:4 (CEMENT:SAND)

RATIO OF MORTAR FOR 10” WALL BONDING 1:5 (CEMENT:SAND)

REQUIRED TOOLS FOR MASONRY WALL TROWELL,BRICK HAMMER ,SPIRIT LEVEL,PLUMB BOB.METRE RULE,LINE AND PINS

WALL FINISHINGSTEPS OF PLASTERING

CURING THE WALL THREE TIMES OF THE DAY (7 DAYS)BRUSHING AND SCRAPING THE WALL RAKED JOINTS WASHED THE WALL WITH WATER AND KEPT WET BEFORE PLASTERING RATIO OF MORTER FOR PLASTER 1:4PLASTER THICKNESS 1/2” -1”CURING TIME OF WALL AFTER PLASTERING 10 DAYS

WALL FINISHING STEPS OF PAINTING

PREPARATION OF SURFACE:

FIRST RUBBED THE PLASTER BY WALL PLASTER STONE(60 NO. ,80 NO. , 120 NO.)THEN RUBBED THE WALL WITH BRUSHES FOR FREE FROM MORTAR DROPPINGS AND OTHER FOREIGN-MATTER

WALL FINISHING STEPS OF PAINTING

3 STEPS OF PAINT-

PARIMARY COATING (WHITE WASHING)

SECONDARY COATING (COLOUR WASHING)

TERTIARY COATING (DISTEMPER)

TIME DURATION COATING- MINIMUM 1 DAY

WALL FINISHING STEPS OF TILES

FIRST WASHED THE WALL WITH WATER AND KEPT WET BEFORE TILES SETTINGSECOND PASTE THE MORTER OVER THE WALLMORTER RATIO FOR TILES 1:3 OR 1:4THICKNESS OF MORTER FOR TILES ¾” BEFORE SETTING TILES HAVE TO CURING 1- 1.5 HOURRATIO OF TILES FOOTING 1:1 (WHITE CEMENT:WATER)

CERAMIC TILES GLASS TILE

CERAMIC TILES DIGITAL/3D TILE

CERAMIC TILES

Gilded Ceramic Tile

STONE TILES

NATURAL STONE

CLADDING TILES

BATHROOM WALL TILES

KITCHEN WALL TILES

WALL FINISHING

TYPES OF WALL

BRICK WALLWOODEN WALLCONCRETE WALLFERROCEMENT WALLSTONE WALLBAMBOO WALL

BRICK WALL

BRICKWORK IS MASONRY PRODUCED BY A BRICKLAYER, USING BRICKS AND MORTAR IN A VARIETY OF PATTERNS WITH A VARIETY OF MORTAR JOINTS. TYPICALLY, ROWS OF BRICKS – CALLED COURSES – ARE LAID ON TOP OF ONE ANOTHER TO BUILD UP A STRUCTURE SUCH AS A BRICK WALL.

WOODEN WALL

CONCRETE WALL

FERROCEMENT WALL

STONE WALL

BAMBOO WALL

A FLOOR IS THE WALKING SURFACE OF A ROOM OR VEHICLE. FLOORS MAY BE STONE, WOOD, BAMBOO, METAL, OR ANY OTHER MATERIAL THAT CAN SUPPORT THE EXPECTED LOAD.

FLOOR FINISHING

STEPS OF FLOOR FINISHING

CHIPING THE FLOOR BY ROUGHING TOOL (LOCALLY-বা�সু�লা�), CLEAN THE TOTAL FLOOR BY WATER LEVEL THE FLOOR BY LEVELING TOOLS COVER THE FLOOR BY MORTER MIXING (RATIO OF MORTER -1:3THICKNESS OF MORTAR – ½” COVER THE MORTER BY GRAVING CEMENT.MIXING RATIO OF GRAVING CEMENT (1:1) (CEMENT:WATER)6TH SET THE TILES OVER THE MORTAR-CURING THE CERAMICS TILES 1- ½ HOUR BEFORE SETTING ON THE FLOOR.TILES--A TILE IS A MANUFACTURED PIECE OF HARD-WEARING MATERIAL SUCH AS CERAMIC, STONE, METAL, OR EVEN GLASS , walls.

FLOOR FINISHING

FLOOR FINISHING

•WET FLOORING•MUD FLOOR•BRICK FLOOR•CONCRETE FLOOR•TILES FLOOR•MARBLE & GRANITE•NET CEMENT

•DRY FLOORING

•WOODEN FLOOR•BAMBOO FLOOR•GLASS FLOOR•METAL FLOOR•VINYL SHEET•RUBBER FLOORING

TYPES OF FLOORWET FLOORINGDRY FLOORING

WET FLOORING

MUD FLOORING

WET FLOORING

BRICK FLOORING

WET FLOORING

CONCRETE FLOORING

WET FLOORING

TILES FLOORING

WET FLOORING

MARBEL FLOORING

WET FLOORING

TERAZZO FLOORING

DRY FLOORING

WOODEN FLOORING

DRY FLOORING

BAMBOO FLOORING

DRY FLOORING

GLASS FLOORING

GLASS

DRY FLOORING

METAL FLOORING

DRY FLOORING

STONE FLOORING

DRY FLOORING

VENYL SHEET FLOORING

CEILING FINISHING

CEILING ---- A CEILING IS AN OVERHEAD INTERIOR SURFACE THAT COVERS THE UPPER LIMIT OF A ROOM. IT IS NOT GENERALLY CONSIDERED A STRUCTURAL ELEMENT, BUT A FINISHED SURFACE CONCEALING THE UNDERSIDE OF THE FLOOR OR ROOF STRUCTURE ABOVE.

CEILING FINISHING

DROPPED CEILING ---- A DROPPED CEILING IS A SECONDARY CEILING, HUNG BELOW THE MAIN (STRUCTURAL) CEILING. IT MAY ALSO BE REFERRED TO AS A DROP CEILING, T-BAR CEILING, FALSE CEILING, SUSPENDED CEILING, GRID CEILING, DROP IN CEILING, OR DROP OUT CEILING.

CEILING FINISHING

STEPS OF CEILING FINISHING

CHIPING THE CEILING. WASH THE CEILING BY WATER. COVER THE TOTAL CEILING BY GRABING CEMENT.THAN COVER THE GRABING CEMENT BY MORTAR THICKNESS OF CEILING PLASTER ½”

DOOR SETTING

DOOR ---- A DOOR IS A MOVING STRUCTURE USED TO BLOCK OFF, AND ALLOW ACCESS TO, AN ENTRANCE TO OR WITHIN AN ENCLOSED SPACE, SUCH AS A BUILDING OR VEHICLE. SIMILAR EXTERIOR STRUCTURES ARE CALLED GATES. WHEN OPEN, DOORS ADMIT PEOPLE, ANIMALS, VENTILATION, AND LIGHT.

DOOR SETTING

DOOR TYPES :

SWINGING DOORBYPASS SLIDING DOORSURFACE SLIDING DOORPOCKET SLIDING DOORFOLDING DOOR

SWINGING DOOR

DOOR SETTING

DOOR SETTING TIME :

DOOR FRAME- DURING BRICK WORKS AND BEFORE WALL PLASTERINGDOOR PANEL- AFTER WALL AND FLOOR TILES SETTING

DOOR SETTING

DOOR ELEMENTS :

DOOR PANELDOOR FRAMEHINGESDOOR LOCKSETS

DOOR LOCK

DOOR PANEL

HINGES

DOOR FRAME

DOOR MODULE

WINDOW SETTING

•A WINDOW IS AN OPENING IN A WALL THAT ALLOWS THE PASSAGE OF LIGHT AND AIR IF NOT CLOSED OR SEALED.

•MODERN WINDOWS ARE USUALLY GLAZED OR COVERED IN SOME OTHER TRANSPARENT OR TRANSLUCENT MATERIAL.

WINDOW SETTING

WINDOW TYPES: FIXED WINDOWCASEMENT WINDOWAWNING & HOPPER WINDOWSLIDING WINDOWDOUBLE – HUNG WINDOWPIVOTING WINDOWHIGH WINDOW

WINDOW SETTING

WINDOW SETTING TIME: WINDOW GRILL- DURING BRICK WORKS AND BEFORE WALL PLASTERINGWINDOW FRAME- AFTER WALL PLASTERINGWINDOW SLIDING PANEL-AFTER PLASTERING AND TILES SETTING

WINDOW SETTING

WINDOW ELEMENTS: WINDOW FRAMECASING TRIMROUGH OPENING SASH AND GLAZING

FRAME

CASING TRIM

SASH AND GLAZING

ROUGH OPENING

GRILL SETTING TIME:

WINDOW GRILL SETTING

DURING BRICK WORK AND BEFORE WALL PLASTER

RAILING SETTING TIME:

RALING SETTING

DURING BRICK WORK AND BEFORE WALL PLASTER.

STAIR RAILING

STAIR RAILING SETTING TIME- AFTER OPEN SHUTTERING OF STAIR .

PLUMBING

PLUMBING IS THE SYSTEM OF PIPES, DRAINS FITTINGS, VALVES, AND DEVICES INSTALLED IN A BUILDING FOR THE DISTRIBUTION OF WATER FOR DRINKING, HEATING AND WASHING, AND THE REMOVAL OF WATERBORNE WASTES.

PLUMBING AND FIXTURE

PLUMBING COMPONENT SETTINGS TIME: AFTER BRICK WORKS AND BEFORE WALL PLASTER AND TILES SETTING.

PLUMBING AND FIXTURE

PIPE OR TUBINGVALVESELBOWSTEES AND UNIONS

PLUMBING COMPONENTS:

PLUMBING COMPONENTS:

PIPE OR TUBING

PLUMBING COMPONENTS:

VALVES

PLUMBING COMPONENTS:

ELBOWS

PLUMBING COMPONENTS:

TEES

PLUMBING COMPONENTS:

UNIONS

A KITCHEN IS A ROOM OR PART OF A ROOM USED FOR COOKING AND FOOD PREPARATION.

KITCHEN

KITCHEN FIXTURES:SINKRANGEKITCHEN HOOD

KITCHEN FIXTURES SETTINGS TIME: SINK-BEFORE TILES SETTING.RANGE AND KITCHEN HOOD AFTER PLASTERING OR TILES SETTING

KITCHEN

SINK

KITCHEN FIXTURES

KITCHEN RANGE

KITCHEN FIXTURES

KITCHEN HOOD

KITCHEN FIXTURES

KITCHEN CABINETS

KITCHEN FIXTURES

A TOILET IS A SANITATION FIXTURE USED PRIMARILY FOR THE DISPOSAL OF HUMAN URINE AND FECES. THEY ARE OFTEN FOUND IN A SMALL ROOM REFERRED TO AS A TOILET/BATHROOM/LABORATORY

TOILET

BASINSHOWERSURINALSWATER CLOSETS (WC)LOW PAN

TOILET FIXTURES SETTING TIME: W.C , LOW PAN AND BASIN- BEFORE TILES SETTING

TOILET FIXTURES

BASIN

TOILET FIXTURES

SHOWERS

TOILET FIXTURES

C 6’-6”

C 3’-6”

URINALS

TOILET FIXTURES

WATER CLOSET

TOILET FIXTURES

LOW PAN

TOILET FIXTURES

ELECTRICAL SYSTEMS IS THE ELECTRICAL WIRING AND ASSOCIATED DEVICES SUCH AS SWITCHES, METERS AND LIGHT FITTINGS USED IN BUILDINGS OR OTHER STRUCTURES.

ELECTRICAL SYSTEMS

ELECTRICAL SYSTEMS COMPONENT:ELECTRIC POWERELECTRIC SERVICEELECTRIC CIRCUITSELECTRIC WIRINGELECTRICAL OUTLETS

ELECTRICAL SYSTEMS

ELECTRIC POWER

ELECTRICAL SYSTEMS COMPONENT

ELECTRIC SERVICE

ELECTRICAL SYSTEMS COMPONENT

ELECTRICAL SYSTEMS COMPONENT

ELECTRIC CIRCUITS

ELECTRIC WIRING

ELECTRICAL SYSTEMS COMPONENT

ELECTRIC OUTLETS

ELECTRICAL SYSTEMS COMPONENT

ELECTRICAL SYSTEMS SETTING TIME

FIRST ELECTRICAL SERVICES (PIPE) – BEFORE CASTING OF ROOF AND AFTER BRICK WORKSELECTRICAL CIRCUITS-BEFORE WALL PALSTERINGELECTRIC WIRING- AFTER ELECTRICAL CIRCUIT SETTINGELECTRICAL OUTLETS - AFTER WALL PLASTERING AND WALL PAINT OR TILES FITTINGS

ELECTRICAL SYSTEMS

AN ELEVATOR (LIFT IN BRITISH ENGLISH) IS A TYPE OF VERTICAL TRANSPORT EQUIPMENT THAT EFFICIENTLY MOVES PEOPLE OR GOODS BETWEEN FLOORS (LEVELS, DECKS) OF A BUILDING, OR OTHER STRUCTURE.

LIFTT

LIFT