SAFETYASSESSMENT
REPORT1
TAYTAY SA KAUSWAGAN INC. San Roque Ex t., Roxas City
I. OBJECTIVESII. SHORT PROJECT DESCRIPTIONIII. ENFORCING AUTHORITYIV. CODES AND STANDARDSV. FIRE PROTECTION AND LIFE SAFETY ISSUES
a. Building Classification and Constructionb. Hazard Contentsc. Occupancy Classificationd. Structural Requirements/Separation of Building Spaces e. Exit and Egress Description
i. Basis of Designii. Number of Exitsiii. Travel Distancesiv. Exit Calculationsv. Timed Exit Analysis
f. Fire Suppressioni. Design Criteria for Sprinkler Systemii. Other Suppression Systemiii. Water Supplyiv. Portable Fire Extinguishersv. Hydraulic and Other Calculationsvi. Riser Diagram
g. Fire Detection, Alarm, Communication and Evacuation System
i. Descriptionii. Sound Pressure
h. Smoke Control Management i. Description of Smoke Control Strategies
ii. Design Criteria Used iii. Calculationsi. Exit Light and Emergency Lightning System i. Description ii. Location of Exit Lights and Emergency Lighting Systems
iii. Design Criteria iv. Calculations
j. Emergency Power Supplyi. Descriptionii. Capacityiii. Calculations
k. Fire Department Access i. Description and Locationl. Other Issues
I. OBJECTIVE
The objective of this Fire and Life Safety Report is to provide a comprehensive Fire and Life evaluation of the safety features of this project. To ensure that there is no unnecessary danger to life and property.
II. SHORT PROJECT DESCRIPTION
The project involves a proposed business building primarily used as Bank and Lending office.
III. ENFORCING AUTHORITY/IES
a. For Structural and Building Codes and Laws, the City Engineer.
b. For Zoning and other Local Regulations, the City Government.
c. For Environmental Concerns, the Department of Environment and Natural Resources.
d. For Fire Safety, the Bureau of Fire Protection.e. For Insurance and Accreditation, the Central Bank of the Philippines.f. For Business registration and Authorization, the Department of Trade And Industry.
IV. CODES AND STANDARDS
Construction sketch plan and Specifications submitted is in accordance to provisions of National building code, Electrical Code, Fire Code of the Philippines and approved by Agency concerned.
V. FIRE PROTECTION AND LIFE SAFETY ISSUES a. Building Classification and Construction
Building is a business type occupancy and reinforced concrete construction, structural
steel works done in accordance with pertinent specifications indicated, all electrical works shall be done in accordance to specifications. All electrical works shall be done under the supervision of Electrical Engineer and Architect.
b. Hazard Contents
Hazard contents of the project is from the use of hot works, forms, batters and scaffolds
During construction.
c. Occupancy Classification
Under the New Fire Code of the Philippines, the project is classified as Business Occupancy.
d. Structural Requirements/Separation of Building Spaces
Structural steel works on the design is in accordance to plans and specification submitted and evaluated by the Structural Engineer of the City Engineers Office.
Every section usage is provided of smoke partition, concrete type from floor to undersideOf roofing above of two (2) hour fire resistance.
e. Exit and Egress Description
i. Basis of Design
The basis for the design of the Exit and Egress of the project under Division 5 means of Egress section 10.2.5.3, exit door should have not less than seventy one
centimeters (71 cm) in clear width opening swing out the direction of
exit.
ii. Number of Exits
Due to sectional usage and concrete smoke partition the project required to provide one exit door in every section swing out to exit direction.
336 square meters/9.3 square meters perperson
= 36.12 pers / 100pers / UWE =0.36 UWE (55) cm/UWE =19.8cm 224/9.3 =24.1/60 pers/UWE =0.40 (55) cm =22.17
iii. Travel Distances
Travel distance a person may travel when inside the building measured in accordance with section of IRR shall not exceed forty six meters (46 m)
iv. Exit Calculations
Exit can accommodate almost of the occupants due to numbers of exits require in every usage.
v. Timed Exit Analysis
Exit discharge of the occupancy based on the number of exits show safety margin for occupants.
f. Fire Suppression
i. Design Criteria for Sprinkler System Building does not provide for a sprinkler system.
ii. Other Suppression system
Building does not have any suppression System.
iii. Water Supply
Water supply is provided directly byRoxas City Water District.
iv. Portable Fire Extinguishers
Approved type of first aid fire fighting equipment is provided during construction and prior to occupancy additional units will be provided.
v. Hydraulic and other Calculations
vi. Riser DiagramThe project has a single phase riser diagram
g. Fire Detection, Alarm, Communication and Evacuation System
i. Description
The proposed project does not provided with alarm, communication and evacuation system.
ii. Sound PressureNone
h. Smoke Control Management
i. Description of Smoke Control Strategies The proposed project is provided of concrete smoke partition in every sectional usage.
ii. Design Criteria UsedConcrete Design
iii. Calculations2 hours fire resistance
i. Exit Light and Emergency Lighting System
i. Description
Automatic transfer switchtype emergency Light.
ii. Location of Exit Lights and Emergency Lighting Systems
Emergency lighting will be installed at every lobby of sectional usageiii. Design Criteria Automatic transfer switch. ACDC power Source type emergency light
iv. CalculationsFour hour duration
j. Emergency Power Supply
The building does not have an emergency power supply.
i. Description – none ii. Capacity – none
iii. Calculations – none
k. Fire Department Access
Building does not have Fire Department Access.
i. Description and location
l. Other Issues
Life safety issues to be considered are
during hotworks and construction phase.