frankston reservoir masterplan · no dogs construction. no fishing no cycling dogs allowed on lead...

Post on 18-Sep-2020

3 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Frankston Reservoir Draft Master Plan September 2011 MASTER PLAN OVERVIEW

Legend

Reserve boundary

Visitor entry road & parking

Fuel break

No access to water’s edge

Vehicular roads

Primary pedestrian trail (3.8km approx.)

New primary pedestrian trail

Secondary pedestrian trail

Management vehicles only track

Management track

Emergency/Fire access point

Visitor entry point

Pedestrian bridge

Existing fence

Proposed fence

Existing catch drain

Viewing point

Disabled access

Signage

Walking trail

Picnic table

Contours at 1m intervals

Visitor sites

Grassy Woodland

Gully Woodland

Damp Heathland

Damp Heathy Woodland

Aquatic Sedgeland

Submerged Aquatic Herbland

CASUARINA DRIVE

SWEE

TWA

TER

CR

EEK

CALADENIA COURT

OVERPORT PARK

NO ACCESS TO RESERVE

NO ACCESS TO RESERVE

NO ACCESS TO RESERVE

DOGS ALLOWEDLEAD FREE

SOMERSET

ROAD

JEREMY

WAY

WA

TER

WA

Y

LAWSON AVENUE

ML

EH

EH

T

LAWSON RESERVE

SWEETWATER NATURE RESERVE

DER

INYA

DR

IVE

FONTAYNE COURT

ALICUDI AVENUE

RINELLA BUSHLANDRESERVE

MABERLEY C

RESCENT

ROSEDALE GROVE

CHRISTOPHER DRIVE MO

OR

OO

DU

C H

IGH

WA

Y

WATER TANK

TANK

NO PUBLIC ACCESS TO WATER BODY

Signpost: Management vehicle access

NO PUBLIC ACCESS

SWEE

TWAT

ER C

REEK

UPGRADED ACCESS

BIRD HIDE

Access

Vehicular and pedestrian entry point. No night/after hours access for vehicles or pedestrians. Provide dir ectional and regulatory signage.

Access to bird hide.

SWEETW

ATER CREEK

Boardwalk crossing of creek. Hand cut trails and hand tool construction.NO DOGS

NO FISHINGNO CYCLING

DOGS ALLOWED ON LEAD

NO ACCESS TO RESERVE

0102

Project Name Frankston Reservoir

DrawingAX002639-Masterplan Working Draft

Scale1:2500 @ A1 1:5000 @ A3

Date12.08.2011

25 100 200m0

FRANKSTON RESERVOIRMASTERPLAN

E1

P2

P1

W

W

W

W

W

W

W

WC2

P3

C1

C2

Circulation

C1

E1

Hydrology

Potential location for natural treatment of stormwater fromSurrounding streets, though rocks and reed beds, to top up thereservoir.

Picnic area with two picnic tables & seating.

Activities

Pedestrian and vehicle entry and car park for 24 cars. Map, directional and regulatory signs. Access gate will be open during daylight hours only.

Seat at high point with views across the reserve.

P1

P2

P3

W

Conservation values management

• Targeted pest plant control• Research opportunities• Local school and community involvement

top related