frankston reservoir masterplan · no dogs construction. no fishing no cycling dogs allowed on lead...
TRANSCRIPT
Frankston Reservoir Draft Master Plan September 2011 MASTER PLAN OVERVIEW
Legend
Reserve boundary
Visitor entry road & parking
Fuel break
No access to water’s edge
Vehicular roads
Primary pedestrian trail (3.8km approx.)
New primary pedestrian trail
Secondary pedestrian trail
Management vehicles only track
Management track
Emergency/Fire access point
Visitor entry point
Pedestrian bridge
Existing fence
Proposed fence
Existing catch drain
Viewing point
Disabled access
Signage
Walking trail
Picnic table
Contours at 1m intervals
Visitor sites
Grassy Woodland
Gully Woodland
Damp Heathland
Damp Heathy Woodland
Aquatic Sedgeland
Submerged Aquatic Herbland
CASUARINA DRIVE
SWEE
TWA
TER
CR
EEK
CALADENIA COURT
OVERPORT PARK
NO ACCESS TO RESERVE
NO ACCESS TO RESERVE
NO ACCESS TO RESERVE
DOGS ALLOWEDLEAD FREE
SOMERSET
ROAD
JEREMY
WAY
WA
TER
WA
Y
LAWSON AVENUE
ML
EH
EH
T
LAWSON RESERVE
SWEETWATER NATURE RESERVE
DER
INYA
DR
IVE
FONTAYNE COURT
ALICUDI AVENUE
RINELLA BUSHLANDRESERVE
MABERLEY C
RESCENT
ROSEDALE GROVE
CHRISTOPHER DRIVE MO
OR
OO
DU
C H
IGH
WA
Y
WATER TANK
TANK
NO PUBLIC ACCESS TO WATER BODY
Signpost: Management vehicle access
NO PUBLIC ACCESS
SWEE
TWAT
ER C
REEK
UPGRADED ACCESS
BIRD HIDE
Access
Vehicular and pedestrian entry point. No night/after hours access for vehicles or pedestrians. Provide dir ectional and regulatory signage.
Access to bird hide.
SWEETW
ATER CREEK
Boardwalk crossing of creek. Hand cut trails and hand tool construction.NO DOGS
NO FISHINGNO CYCLING
DOGS ALLOWED ON LEAD
NO ACCESS TO RESERVE
0102
Project Name Frankston Reservoir
DrawingAX002639-Masterplan Working Draft
Scale1:2500 @ A1 1:5000 @ A3
Date12.08.2011
25 100 200m0
FRANKSTON RESERVOIRMASTERPLAN
E1
P2
P1
W
W
W
W
W
W
W
WC2
P3
C1
C2
Circulation
C1
E1
Hydrology
Potential location for natural treatment of stormwater fromSurrounding streets, though rocks and reed beds, to top up thereservoir.
Picnic area with two picnic tables & seating.
Activities
Pedestrian and vehicle entry and car park for 24 cars. Map, directional and regulatory signs. Access gate will be open during daylight hours only.
Seat at high point with views across the reserve.
P1
P2
P3
W
Conservation values management
• Targeted pest plant control• Research opportunities• Local school and community involvement