Harry Carter – T4CM Meeting 7/13-14/2006

Type IV Cryomodule (T4CM) Design Meeting #2

H. CarterFermilab Technical Division

Harry Carter – T4CM Design Meeting #2 7/13-14/2006 2

OUTLINE

Some general meeting information Format of meeting Meeting goals Agenda

Harry Carter – T4CM Design Meeting #2 7/13-14/2006 3

General

Meeting will be in this room all day today and tomorrow two 20 min. scheduled breaks each day with

refreshments lunch duration is 1 hour and 15 minutesnearest restrooms are on the other side of the

east elevators security---this room will not be locked at lunch

time, so unattended items may be at risk

Harry Carter – T4CM Design Meeting #2 7/13-14/2006 4

Meeting Format

Meeting format is open. We are one working group and very few formal presentations are planned. Issues with supporting information will be raised and then discussed

Presentations and reference information will be posted on the web at a location TBD. Please provide me with

copies of information presented.

Harry Carter – T4CM Design Meeting #2 7/13-14/2006 5

Goals for this meeting are:

Further definition of the T4CM designWhat new or revised features are to be

incorporated into the design Implementation of the EDMS system Establish a timeline for T4CM design

completion

Harry Carter – T4CM Design Meeting #2 7/13-14/2006 6

Arriving at a T4CM Design (Revised)

1st Qtr

2006

Define design features

Perform engineering analyses

Complete drawing packages

All Components in house and ready for assembly

2007

2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr

Procure components

2008

1st Qtr

Now

Harry Carter – T4CM Design Meeting #2 7/13-14/2006 7

Meeting agenda

Please see me at this mornings’ break to request any additions or other changes to

the agenda