HAYSVILLE USD 261 Updated Project Timeline

.5.04.16

Package J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

June 9th Election

1 Campus High School

2 Campus HS Natatorium

3 Haysville Middle School

4 Colt Stadium

5 Haysville West Middle School

HWMS Drive & Utilities

6 HWMS Athletic Facility

7 Rex Elementary School

7 Nelson Elementary School

7 Freeman Elementary School

7 Oatville Elementary School

7 Prairie Elementary School

8 Ruth Clark Elementary School

9 Transportation

10 Maintenance

11 Administration Building

12 The Learning Center

13 Tri-City Day School

Haysville High School

Design

Bidding & Construction

2015 2016 2017 2018

faira
Typewritten Text
TRANSPORTATION CAMPUS HIGH SCHOOL HHS / TRI-CITY SCHOOL HAYSVILLE MIDDLE SCHOOL RUTH CLARK ELEMENTARY REX, NELSON, FREEMAN, OATVILLE, AND PRAIRE ELEMENTARY SCHOOLS HAYSVILLE WEST MIDDLE SCHOOL
faira
Text Box
JUNE 20, 2016
faira
Snapshot
faira
Snapshot
faira
Snapshot
fairb
Snapshot
fairb
Snapshot
fairb
Snapshot
fairb
Snapshot
fairb
Snapshot

7337

S.

MER

IDIA

N

HA

YSVI

LLE

USD

261

TRA

NSP

OR

TATI

ON

FA

CIL

ITY

sheet

the Architect.

project no.15183.00

DATEBIDDING

10/12/15

HA

YSV

ILLE

, KA

NSA

S

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

SA-1.1

faira
Text Box
Transportation • Building is weather protected except for openings. • Overhead doors are currently being installed. • Paving is scheduled for next week. • Project is on schedule to be completed by August 2016.

BUILDING ABUILDING B

BUILDING C

BUILDING D

BUILDING E

BUILDING F

BUILDING G

BUILDING H

BUILDING I

NEWADDITION

2006 ADDITION

NEWADDITION

sheet

project no.15184.00

DATE12/15/2015

90% CONSTRUCTION

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

SITE

210

0 W

. 5

5th

STR

EET

S.

HA

YSVI

LLE

USD

261

CA

MPU

S H

IGH

SC

HO

OL

HA

YSV

ILLE

, KA

NSA

S

DOCUMENTS

faira
Text Box
Campus High School • Pre-cast panels for north storm shelter are being erected. • Geofoam is installed over pool area and upper concrete slab is to be poured next week. • Science room slabs have been cut for installation of under slab piping & conduits.

WES

T G

RAN

D A

VE

NEW

HA

YSVI

LLE

HIG

H /

TRI-C

ITY

SCH

OO

L

sheet

the Architect.

project no.15182.00

DATE1/26/2016

BID SET

HA

YSV

ILLE

, KA

NSA

S

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

A-1.2

FAAPFACPFDC

faira
Text Box
Haysville High / Tri-City Day School • Building pad is complete. • Foundations are in progress on the north (HHS) wing. • Awaiting response from KDHE & Corp. of Engineers before resuming site work.

90

0 W

. GRA

ND

AV

ENU

E

HA

YSVI

LLE

MID

DLE

SC

HO

OL

- AD

DIT

ION

& R

ENO

VATI

ON

sheet

the Architect.

project no.15215.00

DATE04/05/2016

HA

YSV

ILLE

, KS

670

60

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

A-2.1

BID SET

4/22/2016

ADD #1 REVISIONS

4/29/2016

ADD #2 REVISIONS

faira
Text Box
Haysville Middle School • Interior demolition has begun. • Driveway demolition has begun. • Building permit has been received. • NOI is anticipated to be received this week.

190

0 W

. 55

TH. S

TREE

T

RU

TH C

LAR

K E

LEM

ENTA

RY

SCH

OO

L - A

DD

ITIO

NS

& R

ENO

VATI

ON

S

sheet

the Architect.

project no.15217.00

DATE05/03/2016

WIC

HIT

A, K

S 6

7217

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

A-2.1

BID SET

fairb
Text Box
Ruth Clark Elementary • Proposed GMP has been submitted for BOE approval. • Building permit has been received.

A C

B D

WES

T G

RAN

D A

VE

REX

ELE

MEN

TAR

Y SC

HO

OL

REN

OVA

TIO

N

sheet

the Architect.

project no.15216.01

DATE2/16/2016

PROGRESS SET

HA

YSV

ILLE

, KA

NSA

S

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

A-2.1

fairb
Text Box
Rex Elementary • Schedule for construction is summer 2016. • Majority of asbestos panels have been removed. • Glass block demo is in process &12 openings ready for Window frame installation. • Restroom demo is complete and under slab plumbing is in progress.

BA

D

C

WES

T G

RAN

D A

VE

NEL

SON

ELE

MEN

TAR

Y SC

HO

OL

REN

OVA

TIO

N

sheet

the Architect.

project no.15216.02

DATE2/16/2016

PROGRESS SET

HA

YSV

ILLE

, KA

NSA

S

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

A-2.1

fairb
Text Box
Nelson Elementary • Schedule for construction is summer 2017. • Asbestos removal will need to be coordinated with construction schedule.

WES

T G

RAN

D A

VE

FREE

MA

N E

LEM

ENTA

RY

SCH

OO

L R

ENO

VATI

ON

sheet

the Architect.

project no.15216.03

DATE2/16/2016

PROGRESS SET

HA

YSV

ILLE

, KA

NSA

S

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

A-2.1

fairb
Text Box
Freeman Elementary • Schedule for construction is summer 2016. • Window demolition is in progress. • Gym fascia demolition has begun.

4335

SO

UTH

HO

OV

ER

OA

TVIL

LE E

LEM

ENTA

RY

SCH

OO

L R

ENO

VATI

ON

sheet

the Architect.

project no.15216.04

DATE

WIC

HIT

A, K

AN

SAS

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

SA-1.1

3/08/2016

BID SET

4335

SO

UTH

HO

OV

ER

OA

TVIL

LE E

LEM

ENTA

RY

SCH

OO

L R

ENO

VATI

ON

sheet

the Architect.

project no.15216.04

DATE2/11/2016

PROGRESS SET

WIC

HIT

A, K

AN

SAS

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

A-2.1

fairb
Text Box
Oatville Elementary • Schedule for construction is summer 2016 & 2017. • Roof and Parking lot are to be completed in summer of 2016. • Building permit and NOI have been received.

WES

T G

RAN

D A

VE

PRA

IRIE

ELE

MEN

TAR

Y SC

HO

OL

REN

OVA

TIO

N

sheet

the Architect.

project no.15216.05

DATE2/09/2016

PROGRESS SET

HA

YSV

ILLE

, KA

NSA

S

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

A-2.1

fairb
Text Box
Prairie Elementary • Schedule for construction is summer 2017.

sheet

the Architect.

project no.16105.00

DATEDESIGN DEVELOPMENT SET

04/05/16

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

SA-1.2

WES

T G

RAN

D A

VE

HA

YSVI

LLE

WES

T M

IDD

LE S

CH

OO

L A

DD

ITIO

NH

AY

SVIL

LE, K

AN

SAS

fairb
Text Box
Haysville West Middle School • Design development is in progress. • Plans have been updated to include input from principal & staff. • Proposed GMP for drive and utility relocation work to be submitted to BOE for approval. • Schedule for building renovations and addition work to begin is fall 2016.

sheet

the Architect.

project no.16105.00

DATEDESIGN DEVELOPMENT SET

04/05/16

3500 north rock roadbldg. 500 wichita, ks 67226316.634.1111 (p) 316.634.1016 (f)

PLAN

WES

T G

RAN

D A

VE

HA

YSVI

LLE

WES

T M

IDD

LE S

CH

OO

L A

DD

ITIO

NH

AY

SVIL

LE, K

AN

SAS

top related