Supplier Opportunities

SaskPower Swift Current Combined Cycle Plant

A B O U T BU R N S & M C D O N N E L L

Presenter
Presentation Notes
You can change this photo to be of your local Burns & Mac office. Just make sure to keep the image the same size as the sample above.

Who We Are

100% EMPLOYEE- OWNED

TOP 5% TOP 500

DESIGN FIRMS

MORE THAN

5,300 PROFESSIONALS

STRENGTH

EXCELLENCE EXCELLENCE

SERVICE

TOP 1% SAFETY RANKING

35+ OFFICES

WORLDWIDE

STRENGTH

What We Do

MILITARY BASE

HYDROELECTRIC DAM

SOLAR FARM WIND FARM

MGP SITE

Among the Industries and Markets We Serve

TRANSMISSION LINE

ELECTRIC POWER

GENERATION

NUCLEAR POWER PLANT

EXPORT TERMINAL

WETLANDS

RAIL

AIRPORT

WATER TREATMENT PLANT

CLEAN COAL POWER PLANT

FOOD PROCESSING

PLANT

REFINERY

GAS PROCESSING

PLANT

HIGHWAY

RETAIL, OFFICE, MIXED USE URBAN

FACILITIES

BRIDGE

Presenter
Presentation Notes
We are moving away from listing our global practices and long lists of what we do and instead showing our clients the industries and markets we serve.

5

Canada Experience

Presenter
Presentation Notes
CCR/ELG is a big market for the Energy Group this year and next. In our brochures, SOQs, ads and related materials, we will be emphasizing our project execution approach. In 2015 we emphasized our knowledge of the CCR/ELG regulations. In 2016 we are emphasizing that we can deliver safe projects on time and on budget.

Queen Elizabeth Power Station Expansion Project: ► Increase Generation Capacity from 430

MW to 600 MW ► Addition of 6 heat recovery boilers to

increase efficiency by 15 to 20 percent ► Increased capacity will serve 205,000

additional households ► Joint Venture with Alberici ► ISD – Sep, 2015 Our Scope: ► EPCM Services

Engineering, Procurement, Field Engineering, Construction Management

► (2013-2015)

SASKPOWER | Saskatoon, Saskatchewan

TransCanada | Halton Hills, Ontario Project: ► 670 MW 2 SW 501F

CC Natural gas ► 100% Air Cooled ► Fully enclosed HRSGs

and steam turbine ► EPC Joint Venture ► Online August 2006 - 2010 Our Scope: ► Engineering ► Procurement ► Construction

Halton Hills Gas

Project: ► New 350MW, 1x1 Combined Cycle

Natural Gas Power Plant Our Scope: ► EPC Contractor (Responsible for

Engineering, Procurement, Construction, Start-Up)

SASKPOWER | Swift Current, Saskatchewan

Swift Current CC Gas Turbine Facility

9

Presenter
Presentation Notes
CCR/ELG is a big market for the Energy Group this year and next. In our brochures, SOQs, ads and related materials, we will be emphasizing our project execution approach. In 2015 we emphasized our knowledge of the CCR/ELG regulations. In 2016 we are emphasizing that we can deliver safe projects on time and on budget.

Swift Current CC Gas Turbine Facility

Presenter
Presentation Notes
Aaron, if there’s a way to just show the part within the boundaries (and not the writing along the bottom and the left side) that would be ideal. And then delineate the labels that Dave put on it and sent to us Wednesday (I’m not sure why they don’t show up on the version that’s pasted here).

HRSG

Gas / Steam Turbine

Air Cooled Condenser

Pipe racks / Piping

Major Electrical

Schedule: ► 2017 – Enclose HRSG, Gas Turbine

Building ► 2018 – Build out Powerhouse, Water

Treatment Building ► Early 2019 – Commissioning,

Completion

Swift Current CC Gas Turbine Facility – Project Schedule

1 7

Schedule

Sept

embe

r-16

Oct

ober

-16

Nov

embe

r-16

Dece

mbe

r-16

Janu

ary-

17

Febr

uary

-17

Mar

ch-1

7

April

-17

May

-17

June

-17

July

-17

Augu

st-1

7

Sept

embe

r-17

Oct

ober

-17

Nov

embe

r-17

Dece

mbe

r-17

Janu

ary-

18

Febr

uary

-18

Mar

ch-1

8

April

-18

May

-18

June

-18

July

-18

Augu

st-1

8

Sept

embe

r-18

Oct

ober

-18

Nov

embe

r-18

Dece

mbe

r-18

Janu

ary-

19

Febr

uary

-19

Mar

ch-1

9

April

-19

May

-19

June

-19

July

-19

Augu

st-1

9

Sept

embe

r-19

Oct

ober

-19

Clearing and grubbing / gen sitework

Piling

Foundations / underground utilities

Building steel erection

HRSG Erection

Piperack / piping erection

Gas turbine erection

Steam turbine erection

Air Cooled Condenser

Water Treatment building

Electrical installation

Start-up / commissioning

Presenter
Presentation Notes
CCR/ELG is a big market for the Energy Group this year and next. In our brochures, SOQs, ads and related materials, we will be emphasizing our project execution approach. In 2015 we emphasized our knowledge of the CCR/ELG regulations. In 2016 we are emphasizing that we can deliver safe projects on time and on budget.

1 8

EPC Lump Sum Contractor

Presenter
Presentation Notes
CCR/ELG is a big market for the Energy Group this year and next. In our brochures, SOQs, ads and related materials, we will be emphasizing our project execution approach. In 2015 we emphasized our knowledge of the CCR/ELG regulations. In 2016 we are emphasizing that we can deliver safe projects on time and on budget.

1 9

Purchasing Process

Presenter
Presentation Notes
CCR/ELG is a big market for the Energy Group this year and next. In our brochures, SOQs, ads and related materials, we will be emphasizing our project execution approach. In 2015 we emphasized our knowledge of the CCR/ELG regulations. In 2016 we are emphasizing that we can deliver safe projects on time and on budget.

2 0

Major Opportunities Prefabrication / Modularization

• Air cooled condenser fan deck and steam duct / distribution • Pipe rack modules • Pump skids • Electrical buildings / PDCs • Stack prefabrication • HRSG platforming / Transition Duct • Fire protection building • Valve stations

Material supply

• Piping • Structural steel • Cable / tray • Valves

Misc. services, supplies

Presenter
Presentation Notes
Aaron, from this slide remove steel, electrical and mechanical and then combine all the icons from the next slide onto here and make it all one slide.

2 1

Major Opportunities

Presenter
Presentation Notes
Aaron, from this slide remove steel, electrical and mechanical and then combine all the icons from the next slide onto here and make it all one slide.

2 2

Presenter
Presentation Notes
One of our better campaigns in terms of the contacts we generated. Bench Mark: 12 contacts; digital ads, 3 contacts; email campaign, 16 contacts.