H E L K A G LO B A L LO G I S T I C S
PROJECT CARGO PORTFOLIOThink Forward Move Forward
-
Providing for YOURPROJECTS around the globeBeing able to trust your logistics provider is vital in meeting the demands of your
supply chain, not only for the on time delivery of goods, but also in terms of safety,
price, and overall quality of service. This reliability is the product of expertise,
knowledge, and contacts collected through years of experience. Therefore, with
more than 35 years of providing logistic services across the world, commitment to
quality is a natural part of HELKA GLOBAL LOGISTICS.
-
Projects AroundThe World
-
- Project management
- Feasibility study on distribution
- Multi-modal handling
- Defining contractual relationships between parties
- Process & supply chain management
- Single point contact window
- Documents & Customs formalities and fulfillment
PROJECT SERVICESO U T O F G A U G E C A R G O A T Y O U R S E R V I C E
-
HELKA is proud to be a partner of
World Project Group (WPG). WPG
is a group of worldwide specialists
dedicated to the transportation and logistics of project
cargo. The group covers a wide range of industries
including Oil and Gas, Power Generation, Water
Treatment, Mining, Renewables, and other fields.
WORLDWIDE PARTNERSW O R K I N G T O G E T H E R T O S E R V E Y O U B E T T E R
-
- Renewables: Windmills, Solar Panels, Hydro…
- Gas Equipment, Purification, and Reactor Systems
- Petrochemical Plants and Refineries
- Brewhouses and Turnkey Brewery Plants
- Cellular Towers
- Oil Rigs
- Minerals and Metals
- Boast vessels, Articulated Buses, …
PROJECTS HANDLEDO U R P O R T F O L I O O F P R O J E C T S
-
HFW STEEL PIPE
No. Of Pieces: 7,600 pieces
Cargo Weight: 7,535,351 KG
These pipes used for petroleum transportation are specifically
coated with an epoxy resin to prevent corrosion. The
requirements to transport this cargo called for unique
handling and loading/unloading arrangements to prevent any
damage to the coating while transported.
L I A N Y U N G A N G , C H I N A T O D A R W I N , A U S T R A L I A
-
LNG REGASIFICATIONMODULE SYSTEM
Cargo Details: 858,666 KG; 10,207 CBM
Dimension: 29.4 X 15.3 x 11.7 m
22.0 x 11.4 x 16.2 m
14.5 x 5.2 x 10.3 m
S H A N G H A I , C H I N A T O S I N G A P O R E
-
Cargo Details: 43 pkgs, 232.75 tons, 1827.68 cbm
Official logistics forwarder
Custom tailored supply chain platform
Services Procured:
Road Transport, Break Bulk Vessel Hire,
Safety Equipment for Transport …
GAS PURIFICATION UNITS H A N G H A I , C H I N A T O T E X A S , U N I T E D S T A T E S
-
Cargo Details: 6 pieces total
1) 63 x 3.51 x 3.94 m 90 tons x 2 pieces
2) 28.63 x 3.62x 4.07 m 93 tons x 2 pieces
3) 28.63 x 2.90 x 3.32 m 58 tons x 2 pieces
Delivered to a BPA Plant for installation
MELTING CRYSTALLIZERD O M E S T I C C H I N A S H I P M E N T - T I A N J I N
-
POWER STATION
BLACK POINT PROJECT – TUEN MUN
Rotor, Inner Casing, Guide Blade Carrier, Washer, Plate Ring,
Stiffening Plate, Storage Tank, Dissolving Tank, etc.
Cargo Details: 1600+ CBM; 110,000 KG+
The requirements for this shipment required barge transshipment
from vessel to barge before unloading at port as the water level near
the port of Tuen Mun could not facilitate the docking of the breakbulk
vessel.
S H A N G H A I , C H I N A
O R T O N A & C A G L I A R I , I T A L Y T O H O N G K O N G S . A . R .
H A M B U R G , G E R M A N Y
-
Cargo Details: 26,000 cbm; ~867 cbm per each shipment
Largest Item Handled: 13.08 x 4.62 x 3.04 m; 54.9 tons
Total 3 shipments: 2 gas compressors per each shipment
Services Procured:
Sea Vessel Transport & On-Carriage Inland Trucking
RECIPROCATING COMPRESSOR UNITS
H O U S T O N , U S A T O P U Y A N G , C H I N A
-
Total Cargo Volume: 2,106 cbm
Largest Item Handled: 15.65 x 4.88 x 4.47 m; 68 tons
A breakbulk vessel was hired to transport a total of 6 x Air Coolers
Services Procured:
Sea Vessel Transport & On-Carriage Inland Trucking
AIR COOLER UNITSH O U S T O N , U S A T O P U Y A N G , C H I N A
-
Total Cargo Volume: 20,000 cbm
Largest Item Handled: 10.36 x 5.5 x 5 meters; 30 tons
Onsite supervision
Services Procured:
Stevedoring, Transport, Marine Survey,
Customs Clearance, Cargo Inspection …
BREWERY EQUIPMENTN A N T O N G , C H I N A T O Y U C A T A N , M E X I C O
-
Windmill Length: 40 meters
Total Weight: 306MT
Coordinator among suppliers, project managers, transport operators,
and local authorities
Services Procured:
Road Transport, Full Charter Hire,
Safety Equipment for Transport …
WINDMILL BLADESL I A N Y U N G A N G , C H I N A T O K O B E , J A P A N
-
Zhongtian Hechuang Erdos Coal Deep Processing Demonstration Project
Total Weight: 609 MT
Total Volume: 1621 CBM
Dims. of Largest Item: 20.93 x 3.60 x 4.53 m
Weight of Largest Item: 185tons
REACTOR SYSTEMA N T W E R P , B E L G I U M T O O R D O S , M O N G O L I A
-
INCINERATOR UNITS
Zhenhai Hydrogen Production Project
2 x Incinerator units
Customs Declaration at 2 Destinations:
Daxie & Beilun Terminals in Ningbo
Final Mile Delivery to Zhenhai
Weight & Dims. of Oversized Cargo:
- 2 x 37 MT; 6.8 x 5.2 x 5.7 m each
- 2 x 34 MT; 7.4 x 5.4 x 6.3 m each
- 1 x 2.3 MT; 8 x 6 x 1.1 m
Y O K O H A M A , J A P A N
B U S A N , S O U T H K O R E A T O Z H E N H A I , C H I N A
P O R T K E L A N G , M A L A Y S I A
-
HEAT TRAIN SYSTEM
Weight: 457 MT
Volume: 973 CBM
Dimensions: 18.4 x 8.4 x 6.3 m
Cargo was loaded onto a 2 x 16 axle SPMT for transport
S H A N G H A I , C H I N A T O T E R N E U Z E N , N E T H E R L A N D S
-
300 x Articulated Buses
Total Weight: 5,130 MT
Total Volume: 43,134 CBM
Buses were shipped via RORO-vessel
Per Bus Details: 17.9 x 2.6 x 3.15 m
144 CBM
17.1 MT
ARTICULATED BUSESX I A M E N , C H I N A T O B A N D A R A B B A S , I R A N
-
Thank You