home renewal experience in rakvere, estonia · my background information • andres jaadla •...

Post on 04-Oct-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Home Renewal Experience

in Rakvere, Estonia Andres Jaadla

Founder and Chairman of the board - Estonian Union of Housing Cooperatives EKÜL

Member of the board – Housing Europe

ANDRES JAADLA 1 RIGA

My background information

• ANDRES JAADLA • 10.03.1965. • Tartu University – Master of Law , 1991 • My housing backround • Founder and Chairman of the board - Estonian Union of Housing

Cooperatives EKÜL (largest Housing Organisation In Estonia) - 1996. – .. • Co-owner and Management Board member of Domen Grupp AS • Member of te board - BUCHA - Baltic Union of Housing Cooperatives

1999… • Member of the UNECE Housing and land management UNECE Real Estate

Market Advisory Group (REM) 2015 - …

• Member of the board – Housing Europe – 2014 - … Housing Europe – Largest Housing Organisation in Europe of 42 national & regional federations gathering about 41.400 providers in 22 countries who manage over 25 million homes)

ANDRES JAADLA 2 RIGA

The Estonian Union of Co-operative Housing Associations (EKYL)

… is an independent organization that brings together over 1500 co-operative housing associations/ apartment

associations all over Estonia.

Largest housing organisation in Estonia. Membership of EKYL is voluntary, accounting for

approximately 15 % of the national co-operative housing stock.

EKYL represents Estonian co-operative housing associations on local, national and international level. It works in

partnership with state institutions, municipalities, universities, private companies and NGOs.

ANDRES JAADLA 3 RIGA

Estonia

ANDRES JAADLA 4 RIGA

Estonian Housing reform 2018

ESTONIA 2018

Country of Housing Cooperatives !

ca 90 % of housing stock

22 856 cooperatives ANDRES JAADLA 5 RIGA

The Estonian Union of Co-operative Housing Associations (EKYL)

• In 1996 Estonian Union of Cooperative Housing Associations

was formed from union of 6 cooperatives .

• The new organization started to organize training courses which were based on 3 pillars.

• �People (leadership and communication skills)

• �Building (basic knowledge in technical

matters)

• � Management (knowledge about

legislation,accounting etc) ANDRES JAADLA RIGA 6

RIGA ANDRES JAADLA 7

Trainings in EKYL's training centre to offer its members a universal,

professional, high-quality service - legal services, representation in

courts, bookkeeping-consultations and

trainings in EKYL's training centre.

ANDRES JAADLA 8 RIGA

Trainings in EKYL's training centre

Today the housing managers study in 160 – hours courses

which have official licence from the Ministry of Education.

Manager of a housing co-operative is a new profession in Estonia

ANDRES JAADLA 9 RIGA

e- training

ANDRES JAADLA 10 RIGA

e- training

ANDRES JAADLA 11 RIGA

e- training

ANDRES JAADLA 12 RIGA

EKÜL SUMMER UNIVERSITYS

ANDRES JAADLA 13 RIGA

Development of legislative and other acts of law

EKYL's objectives are:

to develop and advertise the housing association movement;

to influence and participate in legislation - observe and contribute to the development of legislative and other acts of law;

to provide help with the management and administration structures of Estonian housing associations;

ANDRES JAADLA 14 RIGA

Publish relevant leaflets and materials, including own magazine

• to gather and forward the information to the members; to publish relevant leaflets and

materials, including own

magazine ELAMU (HOUSING);

ANDRES JAADLA 15 RIGA

Apartment

building stock in Estonia

ANDRES JAADLA 16 RIGA

Apartment building stock in Estonia

• ~65% population living in

apartment buildings

• ~95% of apartments are in

private ownership

• not insulated, not ventilated …

ANDRES JAADLA

0,0

0,5

1,0

1,5

2,0

2,5

3,0

3,5

Ne

t a

rea

of

ap

art

me

nt

bu

ild

ing

s,

m2

(x 1

06)

Construction year

Wood

Large-block

Brick

Large-panel

17 RIGA

Reconstruction grant in Estonia

• Reconstruction grant is suitable for apartment

associations planning full-scale reconstruction.

• it is possible to apply for the grant in the amount of 15%, 25% and 40% of the total cost of the construction work depending on the level of integration in reconstruction of apartment buildings.

ANDRES JAADLA 18 RIGA

Grants 15%, 25% and 40%

ANDRES JAADLA

15% 25% 35% 2010-

2014

Current state 15% 25% 40% nZEB 2015-

2020 + more strict ventilation and other requirements

19 RIGA

Main steps in the KredEx grant

application process • Housing association decision – simple majority

50% +1 in general assembly meeting

• Qualified technical consultant – steering the

preparation

• Energy audit/EPC of the building and

investigations (stacks etc.)

• Detailed technical design: full set of building

design documents (including calculated EPC

for compliance approval)

• Building permit applied/issued

• Credit decision from bank issued ANDRES JAADLA 20 RIGA

Main steps in the KredEx grant application process

• Grant application to KredEx:

– Investigation of design documents by third party

experts (KredEx)

– Revision of design documentation if needed

(applicant)

– Funding decision by KredEx if all requirements met

• Tendering with contractors

• Construction (KredEx has special supervision rights)

• Commissioning protocols for ventilation rates and

heating system

• Grant payment by KredEx after handing over

• EPC based on measured use after one year operation

ANDRES JAADLA RIGA 21

Results 2010-2014 (old system)

ANDRES JAADLA

• Grants - 38 million euros

• Total investments – 135 million euros

• 35% grant most popular (>50% in last years)

• Renovated apartment buildings – 663 (of

total of about 20 000 apartment buildings)

• Renovated net area – 1,9 million m2

• Average energy savings per building – 43%

• Total annual energy savings – 60 GWh

22 RIGA

Example: Sõpruse pst 202, Tallinn • 11 375 m² (162 ap. 2012-2013)

• Investment € 2 062 000, 181 €/m²

• Grant 35% € 721 600, 63 €/m²

• Credit € 1 340 000, 20 years

• Measured annual savings 63%, ~500 MWh

ANDRES JAADLA 23 RIGA

Example: Sõpruse pst 202, Tallinn • External insulation of facade + roof insulation

• Triple windows (+moved to the insulation layer)

• Heating system: exhaust air heat pump + district heating

• Ventilation system: ventilation radiators and old stacks for extract

ANDRES JAADLA 24 RIGA

2015-2020 KredEx new grants • No need for state-loan (private banks have resources, well

capitalized, low interest rates)

• 102 M€, grants 15, 25 and 40% (50% for design, technical consultants, supervision)

• More emphasis on preparation, ventilation, energy monitoring:

– More detailed building design documents (full energy calculation in

addition to energy audit + because of third party verification)

– Investigation of building design documents by third party experts (run by

KredEx having contracts with qualified experts)

– Technical consultants

– Commissioning protocols for ventilation airflow rates and heating

system balancing

– Agreements for post-maintenance

– Measured EPC after one full year of operation

• Guarantees are still inforce ANDRES JAADLA 25 RIGA

• 15% financial support – EPC class E

• 25% financial support – EPC class D (EP ≤180 kWh/(m2·y))

• 40% financial support – EPC class C (EP ≤150 kWh/(m2·y))

• + some additional technical requirements

especially for ventilation and insulation

• EPC class C – the same value for new and renovated (in some

countries could be called as renovation nZEB)

• 40% grant will keep the monthly payment for the occupant roughly at the

same level before and after the renovation – renovated building, improved

indoor climate and real estate value being a bonus

• 25% grant slightly less cost effective because of tight ventilation

requirements

ANDRES JAADLA

KredEx renovation grant reqs

26 RIGA

ANDRES JAADLA

Mechanical supply and extract heat recovery

ventilation – rooftop and facade installation –

no ductwork in apartments

27 RIGA

Experience with new system

ANDRES JAADLA

• 90% of the applications for 40% grant, first year was

slow start, but then more applications than planned

• Key figures for 40% grant projects:

– Average financial support 108 €/m2

– Average renovation cost (grant included) 270 €/m2

– Average renovation cost 702 000 € (40 ap./2600 m2)

– About 400 buildings (102 M€)

• Centralized mechanical supply and extract HRV with

rooftop AHU and facade ductwork installation one of

the most popular ventilation solutions

28 RIGA

2015 innovation – economic facade

installation of HRV ventilation

ANDRES JAADLA 29 RIGA

Future - quarter renovation

Quarter renovation

in

my city

CITY OF RAKVERE RIGA ANDRES JAADLA 30

Insulation of multiapartment buildings – Housing pilot project in Rakvere

Approx. 70% of

Rakvere’s citizens live in multi-apartment buildings.

The city produces ca

16 000 tons of CO2.

CO2 emissions would be diminished by

8,2% if all multiapartment buildings went

through insulation works of houses

ANDRES JAADLA

Seminari street in Rakvere

31 RIGA

ANDRES JAADLA 32 RIGA

ANDRES JAADLA 33 RIGA

District with the highest density of population:

18 apartment buildings,

8 different types of apartment buildings,

about 900 apartments, area 1,8km²

ANDRES JAADLA

URB –

ENERGY

80 000 eur. 34 RIGA

Before

ANDRES JAADLA 35 RIGA

Plans

NU-NU Arhitektuur

ANDRES JAADLA 36 RIGA

ANDRES JAADLA

Today

37 RIGA

ANDRES JAADLA 38 RIGA

ANDRES JAADLA 39 RIGA

ANDRES JAADLA 40 RIGA

2018 Rаkvere

ANDRES JAADLA 41 RIGA

2018 Rаkvere

ANDRES JAADLA

Solar Panels in walls !

42 RIGA

TARTU 2015 … - quarter renovation H2020 SMART CITY PROJECT

ANDRES JAADLA 43 RIGA

TARTU - H2020 SMART CITY PROJECT.

ANDRES JAADLA 44 RIGA

Estonia

Revolution in renovation-

module renovation

ANDRES JAADLA RIGA 45

2018/18 innovation – economic facade installation of

HRV ventilation and module renovation

ANDRES JAADLA 46 RIGA

2018 – first nearlly zero renovated „ old building“ in Estonia

ANDRES JAADLA

VIDEO

47 RIGA

Estonia experience -wider scope

or renovation grants Estonian studies report highly significant economic benefits from renovation:

• quantified tax return of 32% of renovation total cost

• job creation of 18 jobs in a year per 1 M€ renovation cost

E. Pikas, J. Kurnitski, R. Liias, M. Thalfeldt. Quantification of economic benefits of renovation of apartment buildings as a basis for cost optimal 2030 energy efficiency strategies. Energy and Buildings 86 (2015) 151–160.

ANDRES JAADLA 48 RIGA

Tax return breakdown

ANDRES JAADLA

32% direct return

VAT return

16,7%

From consultancy 0,4%

From construction 16,3%

Labor tax return 15,6%

From consultancy 0,5%

From construction 11,9%

From manufacturing 3,1% 49 RIGA

54% 34%

12%

Material costs, € Labor costs for employer, € Project management costs, €

• Labor cost of 34% includes all labor cost in design, constructin and manufacturing

• Project management cost of 12% includes all costs in design and construction

Cost structure of renovation projects by

Kredex

ANDRES JAADLA 50 RIGA

Summary

ANDRES JAADLA

• Lessons learnt 2010-2014 period – poor ventilation sometimes resulting in moldy apartments the most significant problem

• 2015-2020 grant system requires HRV ventilation (and commissioning protocols for verification) and moving windows to insulation level in the

case of 40% grant as major changes

• Both changes were first seen as „fully impossible“ by stakeholders, but after 6 months

experience economic solutions were found

51 RIGA

Summary • Quarter renovation and Model renovation

solutions – KredEx renovation manual is prepared – designers can copy and customize

the model solutions by quarters

• Win-win-win situation for all :

- occupants benefit from increased real estate value

- government from tax return and economic growth, and

- environment from saved energy ANDRES JAADLA 52 RIGA

Welcome – to Study visit !!

Invitation !

Practical study visit

5- 6 march 2019

„ Renovation in Estonia - quarter and module

renovation, Tallinn - Rakvere “ ANDRES JAADLA RIGA 53

THANK YOU !

ANDRES JAADLA 54 RIGA

top related