i-35 and i-240 interchange reconstructionreconstruction the oklahoma department of transportation ....

Post on 30-Sep-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

I-35 and I-240 Interchange Reconstruction

The Oklahoma Department of Transportation

Agenda

• Introductions • Project Background • Design Overview • Video • CORSIM Analysis • Closing Remarks

Introductions Frank Roesler III, ODOT

• Brian Taylor, ODOT Division 4, Welcome 8 Year Work Plan

• David Streb, Poe & Associates, Background • Jerry Edgin, Poe & Associates, Design Concept • Helene Murdock, Poe & Associates, CORSIM

Welcome

Brian Taylor, ODOT Division 4

8 Year Construction Workplan

• 2016 Right of Way • 2016 Construction • 2017 Utilities • 2018 Construction • 2020 Construction • 2021 Construction

Brian Taylor, ODOT Division 4 Engineer

Project Background

• Last Public Meeting

• Access Points

• Environmental Assessment

David Streb, Poe & Associates

Design Overview Current Design

Jerry Edgin, Poe & Associates

Design Overview CORSIM Analysis

Helene Murdock, Poe & Associates

Closing Remarks

Brian Taylor, ODOT Division 4

top related