Inspection Report

State Bank of MysoreChikkanayakana Halli, Tumkur Dist.

Ground Floor

Water Ingress from the roof top at Safe Locker Room

Ground Floor

Water Ingress from the Crack formed due to Structural Damage at Safe Locker Room

Ground Floor

Crack on back side of the building due to structural damage

Ground Floor

Crack due to Structural Damage

Ground Floor

Soil Settlement on the rare side of the building causing structural damage

Ground Floor

Soil Settlement near the Column on the rare side of the building

Ground Floor

Damage in Rain Water Pipe

Ground Floor

Cracks on the roof of ground floor building

Ground Floor

Cracks on additional screed done on main slab

Ground Floor

Additional Screeding done on roof of ground Floor

First Floor

Chipping of Screeding on 1st Floor Roof Top

First Floor

Cracks on 1st Floor Columns

First Floor

Carbonation and Scaling of Reinforcement

First Floor

Cracks developed on the 1st Floor Roof Top

First Floor

Damaged Parapet wall on 1st Floor

First Floor

Cracks on Parapet Wall