kbe parking structures
Post on 26-Jan-2015
113 Views
Preview:
DESCRIPTION
TRANSCRIPT
parking structures
Cora Harkins, Manager of Business DevelopmentP: 860.284.7622E: charkins@kbebuilding.com
DESIGN-BUILDER | CONSTRUCTION MANAGER | GENERAL CONTRACTOR
For clients in Municipal, Retail, Education, Senior Living, Hospitality, Corporate, and Federal markets
CONNECTICUT | NORTHEAST REGION & MARYLAND | MID-ATLANTIC REGION
a trusted partnerThrough our diverse experience, KBE Building Corporation can support the many construction needs of parking structures. Our preconstruction and construction experience includes work in municipal, university, retail, and senior living facilities.
KBE is committed to being a trusted construction partner for our clients and design teams. That trust is built on the integrity and experience of our people, and our many years of proven performance for hundreds of clients throughout Connecticut, the Northeast, and the Mid-Atlantic US.
a successful construction firm with integrity� KBE is a 54-year-old construction services firm with projects throughout New England and Mid Atlantic, and more than
$2.3 billion in construction volume over the last decade.
� Highly experienced Design-Builder, CM at Risk, CM as Advisor, and General Contractor.
� Committed to putting communities to work and exceeding our client’s SBE/MBE/WBE goals.
� One of the region’s largest merit shop construction firms. KBE offers our clients access to an extensive pool of qualified trade contracting firms, regardless of union or non-union affiliation, providing our clients with the most competitive pricing from the best qualified firms.
expert in-house staff� Staff of 120+ experienced construction professionals and support staff.
� Preconstruction and Estimating Groups with Certified Professional Estimators and Specialists in BIM, Site, and Mechanical/Electrical.
� 16 LEED Accredited Professionals, including Preconstruction and Construction staff.
experienced in...� Design|Build, Construction Management and General Contracting, with in-depth Preconstruction Planning Services.
� Partnering, LEED/Sustainable Design, Building Information Modeling, and Quality Control.
proven management processesWe initiate expansive communication throughout the Preconstruction and Construction process utilizing:
� Leading-edge web-based communication subcontractor and online plan room portals providing access to all project team members.
� Technology focus - we support our clients, staff and projects utilizing multiple software resources.
safety� Award winning safety program and performance.
� Experience Modification Rate significantly better then industry average of 1.0.
� All field staff are OSHA 30-Hour Certified for Construction Safety.
about kbe :: capabilities
science park parking garageNew Haven, CT
ownerWinstanley Construction Management, LLC
New Haven, CT
architect BL CompaniesMeriden, CT
services Design-Build & Constructor
cost $37.3 million
size/scope1,186 car structured parking; 5-story
22,700 sf retail space
schedule Aug 2008 to Oct 2009
description
The precast garage provides parking for 1,186 cars and supports the parking needs of tenants at the nearby 25 Science Park office building and surrounding area. The facility includes an additional 22,700 sf of street-level retail space for stores and restaurants. Science Park Parking Garage is set on an 80+ acre setting of industrial reuse land and buildings located near Yale’ University’s Science Hill.
summer place parking garageStamford, CT
ownerCity of Stamford
Stamford, CT
architect BL CompaniesMeridan, CT
services Design-Builder
cost $13 million
size/scope158,004 sf
498-car, 5-story
schedule May 2005 to Mar 2006
descriptionSet on a challenging site, adjacent and abutting an existing retail center. The elevator core was separated from the garage proper and enclosed by a decorative multi-colored curtain wall along its front.
stamford courthouse garageStamford, CT
ownerState of Connecticut, Department of Construction Services
Hartford, CT
architect BL CompaniesMeriden, CT
services Design-Builder and Constructor
cost $9.2 million
size/scope167,525 sf
509 parking spaces, 6-levels
schedule Feb 2005 to Sep 2005
description
The precast concrete superstructure is set on cast-in-place concrete foundations, with precast concrete shear walls for lateral force resistance. Openings have been provided in interior shear walls for passive security. One and a half levels of the new garage are set below grade, incorporating the required fire protection and ventilation measures. In the southeast corner, the new garage ties in at two levels of the existing underground parking facility. At the area of tie-in, the new facility spans the existing structure to avoid applying additional loads to the existing parking structure. Landscaping for the site has been designed for minimal maintenance and to preserve the open green space.
whitney center, parking garage and continuing care retirement communityHamden, CT
ownerWhitney Center,
Handen, CT
architect SFCS, Inc.Roanoke, VA
services Construction Manager at Risk
cost $50.6 million
size/scope 195,000 sf 7- story addition, and 2-level parking garage
schedule Jan 2010 to Aug 2011
description
2-level parking garage, new maintance garage and shop, renovation of multiple floors and areas of existing senior living facility, including kitchen/dining facilities, community center, and administrative offices. New addition of bistro, bank, library, salon, and restrooms. Upgrade of all related MEP and building systems. New addition provides 87 one- and two- bedroom living units, including all interior fit-out.
danbury police headquarters with parking garageDanbury, CT
ownerCity of Danbury
Danbury, CT
architect Jacunksi Humes Architects, LLC
services General Contractor
cost $26.3 million
size/scope 74,839 sf
schedule Aug 2007 Apr 2009
description
The new high-tech facility, with its graceful, 3-story Victorian-style aesthetic, provides both an engaging visual appeal and a high-visibility icon of public safety and security.
Interior features include a shooting range, 26-cell detention facility, bullet resistant sheathing, separate public areas, operational areas, high-density storage systems, central 911 dispatch for both fire and police, integrated security system. Exterior features include 5 vehicle bays, 2 bay sally port, CID lab, 3,000 sf precast parking deck with parking for 73 vehicles, and dual fuel mechanical systems, and landscaped plaza.
western connecticut state university centennial hall parking garage and residence hallDanbury, CT
owner State of Connecticut, Department of Construction ServicesHartford, CT
architect Newman ArchitectsNew Haven, CT
services Design-Builder and Constructor
cost $27 million
size/scope450-car parking garage
128,000 sf residence hall
schedule Oct 2003 to Oct 2004
noteworthy LEED-NC-v2 Certification
description
Design-Builder and Constructor for the 450-car, five-story, precast parking garage with adjacent 128,000 sf residence hall . Responsibilities included all related sitework, pre-cast wall-and-plank with traditional masonry, glass curtain walls, cold formed metal roof trusses, attic window freezes and all interiors. The parking structure is an open pre-cast spandrel system with a concrete frame. 11-month construction schedule.
sheraton hotel and parking garageWindsor Locks, CT
ownerR K Bradley Associates
West Hartford, CT
architect Steven S. Cohen ArchitectsPrinceton, NJ
services Construction Manager
cost $28 million
size/scope 300-car garage, 240 hotel rooms
description
300-car, two-level, below-grade precast parking garage and 240-room precast hotel. The garage houses the main electrical room for the garage and hotel as well as a large holding tank for the hotel sprinkler system. The first garage level is set on grade, and the second level precast double tee. The foundations for the garage perimeter is conventional spread footings. The central garage area supports the hotel with a six-foot thick concrete mat, which was constructed in a single continuous pour. The garage features open air ventilation and is fully sprinklered. The double-tees below the occupied hotel floors were sprayed with insulating material
The Sheraton Hotel is set between Terminals A and B of Bradley International Airport. Clear communication and intricate coordination among team members, as well as with the contractor for Terminal A, the FAA and the Aeronautics Division of the Connecticut DOT, was crucial to ensure the success of these concurrent construction projects.
bishop corner parking garageWest Hartford, CT
ownerE & A Northeast Limited Partners
Columbia, SC
architect Hoffman ArchitectsNorth Haven, CT
services General Contractor
cost $2.5 million
size/scope 450 car, 110,000 sf garage
schedule Dec 1998 to Mar 1999
description
Renovation of a 110,000 sf, 2-story parking garage. Scope of work included removal of the composite concrete slabs over metal deck, and replacement with new G-90 galvanized metal decking and concrete slabs that included admixtures to strengthen and enhance durability. Existing steel was cleaned and blasted, and repainted with special Tnemac coating.
www.kbebuilding.com
30 Batterson Park RoadFarmington, CT 06032P: 860.284.7110
Business Offices: 7150 Columbia Gateway Drive, Suite AColumbia, MD 21046P: 410.910.1028
top related