KIDS FIT FOR LIFEKIDS FIT FOR LIFE

Prepared by:

Michael Helsel Project Manager

Lloyd West Business Analyst

Roger Miller Hardware Engineer

Daryl Basarab Graphic Designer

INITIAL ANALYSISINITIAL ANALYSIS

• Project descriptionProject description

• Project requirementsProject requirements

• BudgetBudget

• ScheduleSchedule

Final Status ReportFinal Status ReportProject Name: Kids Fit For LifeTeam Member Name: Roger MillerDate: 05/07/2008Reporting Period: 04/03/2008 – 05/07/2008

Work completed this reporting period:- Initial use case diagram and narratives- ERD and Class Diagram- Flow chart and Story Board- RFQ’s- Analysis specifications delivered and given tentative approval.

Work to complete next reporting period:- Purchase hardware- Hardware setup- Create web site- Roll out product

What’s going well and why: - The Team continues to work well together due to weekly meetings where

problems and conflicts are addressed and resolved. - Tentative approvals have been given by the Client on project analysis; this has been

accomplished due to the diligence and cooperation of all team members.

What’s not going well and why: - Content development. The content is taking longer to develop as a result of client

changes and modifications.

Suggestions/Issues:

Project changes - Content scope now requires an end user survey to start after the user exits the

program.

LESSONS LEARNEDLESSONS LEARNED

• TEAMWORK TEAMWORK

• TIME MANAGEMENTTIME MANAGEMENT

• COMMUNICATIONCOMMUNICATION

• PROJECT SPONSORPROJECT SPONSOR

SOFTWARE DEVELOPMENTSOFTWARE DEVELOPMENT

• USE CASESUSE CASES

• ERDERD

• CLASS DIAGRAMCLASS DIAGRAM

USE CASEUSE CASE

NARRATIVENARRATIVE

ERDERD

PRODUCT

PK ProductID

ProductDescription

PAGE_NAVIGATION

PK ScreenID

ScreenName ScreenText BackgroundImage Narration Narrator ContentType BackgroundSoundFK1 ProductID

CONTROL_INTERACTION

PK ControlID

ControlName ControlProperty ControlValueFK1 ScreenID

CLASS DIAGRAMCLASS DIAGRAM

Get Health Information

SELECT LANGUAGESELECT LANGUAGE

SELECT CONTENT PAGESELECT CONTENT PAGE

EXERCISE PAGEEXERCISE PAGE

HARDWARE DEVELOPMENTHARDWARE DEVELOPMENT

Initial requirementsInitial requirements

- Kiosk- Kiosk

- Small Form PC (- Small Form PC (wireless capable)wireless capable)

- Touch-screen monitor- Touch-screen monitor

- Speakers- Speakers

- Phone- Phone

- Power protection- Power protection

- Accessories (cables, velcro, etc.)- Accessories (cables, velcro, etc.)

HardwareHardware

• Selection processSelection process– Preferred vendorsPreferred vendors– Research alternative vendorsResearch alternative vendors– Issue RFQ’sIssue RFQ’s

HardwareHardware• Comparison MatrixComparison Matrix

Dell Optiplex Dell Optiplex 755755

HP DC 5750HP DC 5750

CriteriaCriteria

Case SizeCase Size Small FormSmall Form Small FormSmall Form

Hard drive sizeHard drive size 80 GB80 GB 80 GB80 GB

MemoryMemory 1 GB PC53001 GB PC5300 1 GB DDR1 GB DDR

Processor SpeedProcessor Speed Intel Duo Intel Duo Core2.2 GHzCore2.2 GHz

AMD Athion Dual AMD Athion Dual Core 2.3 GHzCore 2.3 GHz

Service ContractService Contract 3 Yr NBD on site3 Yr NBD on site 3 Yr NBD on site3 Yr NBD on site

PricePrice $ 1056$ 1056 $ 1196$ 1196

Build TimeBuild Time 7 days7 days 7 days7 days

Notes: St. Andrews prefers to use Dell products. As the matrix shows similar products are available for close to the same price. Since HP is priced higher we chose to go with Dell. Using Dell products also simplifies St. Andrews Hardware support by keeping it uniform and consistent.

RFQRFQ

FLOW CHARTFLOW CHART

CONTENT DEVELOPMENTCONTENT DEVELOPMENT