knowledge transfer plan (ktp) highlights
Post on 11-Jan-2022
4 Views
Preview:
TRANSCRIPT
Knowledge Transfer Plan (KTP) Highlights In preparation for the departure of key staff within the organization, this planning template assists in the effort to lessen the impact of those departures by capturing their institutional knowledge. The KTP is a knowledge transfer tool, in Microsoft Excel format, that will: ● Ease role transition efforts ● Capture essential position information ● Group knowledge needs into logical and separate components ● Provide a process to transfer knowledge in a scheduled, structured manner Note: The KTP template is intended to be a fluid system and may be customized to fit your organization's needs. It is recommended that template responses be completed in Microsoft Excel format as some data is formula driven and automatically populates a response (i.e., minimum/maximum dates and total hours are calculated, etc.). Contact the following for assistance in completing the template or to request an electronic copy:
Somer Ratanamany Succession Planning Unit
Phone: (916) 376-5379 Email: Somer.Ratanamany@dgs.ca.gov
Downloaded from http://www.tidyforms.com
template assists in the effort to lessen the impact of those departures by capturing their
Note: The KTP template is intended to be a fluid system and may be customized to fit your organization's needs. It is recommended that template responses be completed in Microsoft Excel format as some data is formula driven and automatically populates a response (i.e., minimum/maximum dates and total hours are calculated,
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xlsTOC 3
1Key Contacts & Relationships
2Assignments
3Deliverables
4Activities
5Meetings
6Vital Information
7Issues & Risks
8Lessons Learned
Table of Contents
Component
Production Schedule
Component Instructions
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xlsTOC 4
Information Captured PageAn automated schedule (with instructions) to track status, dates and hours required to completecomponents 1 – 8. 2
Provides instructions to complete components 1 – 8. 4
Identifies key contacts (internal & external) and their relationships to the position's functions.5
List and description of the position's assignments.7
List and description of the position's deliverables, status of work in progress and deliverables not yetstarted. 9
Identifies the position's activities which are not planned or part of a deliverable.11
List and detail on meetings regularly attended/coordinated by the position.13
Catalog and storage location of vital information pertinent to this position that consists of: (1)technology, (2) processes, (3) performance enhancement and (4) resource tools. 15
Active list of issues and risks inherent with (or observed by) this position. 18
List of lessons learned from the individual's experiences while in this position.20
Table of Contents
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xlsProduction Schedule 5
u vw x y zComponent Status Hours Required Start Date End Date
1. Key Contacts & Relationships Not Started 1.25 01/21/10 02/04/10
2. Assignments Not Started 13.50 02/08/10 03/02/10
3. Deliverables Not Started 9.00 05/06/10 06/09/10
4. Activities Not Started 11.50 07/01/10 07/13/10
5. Meetings Not Started 8.00 01/02/10 02/03/10
6. Vital Information Not Started 7.75 05/01/10 08/06/10
7. Issues & Risks Not Started 7.00 02/08/10 02/16/10
8. Lessons Learned Not Started 9.75 02/15/10 04/08/10
67.75
01/02/10 08/06/10
Types of Knowledge Transfer Strategies Used
Date Signed
~ (dd/mm/yy)
KTM Plan (initial approval) Manager/Supervisor
Overall KTM Process Person Giving KT
Completion Person Receiving KT
(sign-off) Manager/Supervisor
Note: Instructions follow on next page (for u - ~ )
Comments
Overall Start/End Dates
v
{
}
|TOTAL Knowledge Transfer Effort Required (in hours)
Name
(Dates & Total hours are auto-generated)
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xlsProduction Schedule 6
uvw
x
y
z
{
|
}
~
Overall Start/End Dates ● These fields represent the overall start and end dates for the entire knowledge transfer process (i.e. "Start Date" is the earliest start date for any of the components and "End Date" is the latest end date for any of the components).● The earliest start and latest end date automatically populates.
“Types of Knowledge Transfer Strategies Used”● List the Knowledge Transfer Strategies (e.g. mentor programs, job shadowing, procedures manual, etc.) used during the course of this process.
“KTM Plan (initial approval)" and "Overall KTM Completion (sign-off)”● Prior to starting the transfer process, Manager or Supervisor reviews/approves draft KTM plan; and then signs & dates "KTM Plan (initial approval)"● Once the entire KTM process is complete, the knowledge transfer giver and receiver sign-off by entering their name and date of final completion (insert additional sign-off rows as required if responsibility was transferred to multiple persons). ● The Manager or Supervisor signs-off overall once he/she concurs the knowledge giver and receiver have completed the entire process. Note: Overall sign-off implies that the knowledge transfer process is successfully complete.
"Start Date" column:● This is the start date (i.e., dd/mm/yy) of the first KT activity scheduled for the component.● Data is automatically generated and extracted from the worksheet for the specific component. Ensure the dates and data formula calculation in each worksheet is accurate (insertion of additional cells may alter preset calculations).
"End Date" column:● This is the end date (i.e., dd/mm/yy) of the last KT activity scheduled for the component.● Data is automatically generated and extracted from the worksheet for the specific component. Ensure the dates and data formula calculation in each worksheet is accurate (insertion of additional cells may alter preset calculations).
TOTAL Knowledge Transfer Effort Required (in hours)● This is the total hours required to complete the entire KTM process.● The total number of hours automatically generates (ensure cell formula calculation is accurate).
"Hours Required" column:● This is the total time required to transfer knowledge for the specific component.● Data is automatically generated and extracted from the worksheet for the specific component.● Ensure the formula and data in each worksheet is accurate (insertion of additional cells may alter preset calculations).
Complete all eight (8) components PRIOR to completing fields 2 through 10 of the "Production Schedule.""Status" and "Comments" are entered manually.
"Status" column:● Enter data manually by selecting a value from the drop down list.● Select the applicable status from the drop down list: "Not Started", "In Progress" or "Complete"● Set the color of the cell as applicable: ►Green - On schedule to complete by the "End Date" ►Blue - Behind schedule but will complete by the "End Date" (insert reason into the "Comments" cell) ►Red - Behind Schedule and will NOT complete by the "End Date" (insert reason into the "Comments" cell)
Instructions
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xlsProduction Schedule 7
Comments
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xlsProduction Schedule 8
Overall Start/End Dates ● These fields represent the overall start and end dates for the entire knowledge transfer process (i.e. "Start Date" is the earliest start date for any of the components and "End Date" is the latest end date for any of the components).● The earliest start and latest end date automatically populates.
“Types of Knowledge Transfer Strategies Used”● List the Knowledge Transfer Strategies (e.g. mentor programs, job shadowing, procedures manual, etc.) used during the course of this process.
“KTM Plan (initial approval)" and "Overall KTM Completion (sign-off)”● Prior to starting the transfer process, Manager or Supervisor reviews/approves draft KTM plan; and then signs & dates "KTM Plan (initial approval)"● Once the entire KTM process is complete, the knowledge transfer giver and receiver sign-off by entering their name and date of final completion (insert additional sign-off rows as required if responsibility was transferred to multiple persons). ● The Manager or Supervisor signs-off overall once he/she concurs the knowledge giver and receiver have completed the entire process. Note: Overall sign-off implies that the knowledge transfer process is successfully complete.
"Start Date" column:● This is the start date (i.e., dd/mm/yy) of the first KT activity scheduled for the component.● Data is automatically generated and extracted from the worksheet for the specific component. Ensure the dates and data formula calculation in each worksheet is accurate (insertion of additional cells may alter preset calculations).
"End Date" column:● This is the end date (i.e., dd/mm/yy) of the last KT activity scheduled for the component.● Data is automatically generated and extracted from the worksheet for the specific component. Ensure the dates and data formula calculation in each worksheet is accurate (insertion of additional cells may alter preset calculations).
TOTAL Knowledge Transfer Effort Required (in hours)● This is the total hours required to complete the entire KTM process.● The total number of hours automatically generates (ensure cell formula calculation is accurate).
"Hours Required" column:● This is the total time required to transfer knowledge for the specific component.● Data is automatically generated and extracted from the worksheet for the specific component.● Ensure the formula and data in each worksheet is accurate (insertion of additional cells may alter preset calculations).
Complete all eight (8) components PRIOR to completing fields 2 through 10 of the "Production Schedule.""Status" and "Comments" are entered manually.
"Status" column:● Enter data manually by selecting a value from the drop down list.● Select the applicable status from the drop down list: "Not Started", "In Progress" or "Complete"● Set the color of the cell as applicable: ►Green - On schedule to complete by the "End Date" ►Blue - Behind schedule but will complete by the "End Date" (insert reason into the "Comments" cell) ►Red - Behind Schedule and will NOT complete by the "End Date" (insert reason into the "Comments" cell)
Instructions
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xlsComponent Instructions 9
Part u (Knowledge Transfer Subject Information )Follow the specific instructions included in the beginning of each component and ensure Part u is completed prior to starting Part v.
Status # of Hours Required Start Date End Date01/21/10 01/22/1002/04/10 02/28/10
0.00 Dates & Totals in this box are auto-generated
01/21/10 02/28/10
Name Date Person Giving KT
Person Receiving KT
Introduction: Each of the eight (8) knowledge transfer (KT) components has two parts to complete (Parts u and v).
Part v (Knowledge Transfer Production Schedule)The purpose of this schedule is to assist you in identifying tasks that relate specifically to the transfer of knowledge. Furthermore, it provides a plan and timeframe for the knowledge receiver to fully understand a component's subject information. Part v instructions include:►Identify and list all tasks or steps necessary to transfer knowledge for the specific component.►For each task/step, complete the following: • Status – Input “Not Started,” “In Progress,” or “Complete” • # of hours required – Input the amount of time KT will take for the task/step as this will measure the total KT effort needed for this component Note: show hours in decimal format and quarter hour increments (e.g. 15 mins is shown as .25; 1 hour & 30 mins is shown as 1.5, etc.) • KT start/end dates – Input the planned start/end dates for this task/step►Enter additional information in the comments column (as needed)►Ensure the "TOTAL Effort Required" cell is correctly populated ►Component Sign-Off: The person giving KT and the person(s) receiving KT must sign-off by entering their name and the date of completion once overall KT for this component is complete (insert additional sign-off rows as required if transferring knowledge to multiple persons)
KT Task/Step
(Insert rows as needed)
TOTAL Effort Required
Start/End Dates for KT
Component Sign-Off
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xlsComponent Instructions 10
Comments
Introduction: Each of the eight (8) knowledge transfer (KT) components has two parts to complete (Parts u and v).
Part v (Knowledge Transfer Production Schedule)The purpose of this schedule is to assist you in identifying tasks that relate specifically to the transfer of knowledge. Furthermore, it provides a plan and timeframe for the knowledge receiver to fully understand a component's subject information. Part v instructions include:►Identify and list all tasks or steps necessary to transfer knowledge for the specific component.►For each task/step, complete the following: • Status – Input “Not Started,” “In Progress,” or “Complete” • # of hours required – Input the amount of time KT will take for the task/step as this will measure the total KT effort needed for this component Note: show hours in decimal format and quarter hour increments (e.g. 15 mins is shown as .25; 1 hour & 30 mins is shown as 1.5, etc.) • KT start/end dates – Input the planned start/end dates for this task/step►Enter additional information in the comments column (as needed)►Ensure the "TOTAL Effort Required" cell is correctly populated ►Component Sign-Off: The person giving KT and the person(s) receiving KT must sign-off by entering their name and the date of completion once overall KT for this component is complete (insert additional sign-off rows as required if transferring knowledge to multiple persons)
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls1. Key Contacts & Relationships 11
Component Description & Purpose
External or Client Relationships/ContactsName Organization Address Phone & Email
(Insert rows as needed)
Internal DGS Relationships/ContactsName Division/Office Location Phone & Email
(Insert rows as needed)
Note: Proceed to the next page to complete the Production Schedule (Component - Part v). Sample KT tasks/steps are included.
Description: A list of key contacts (both internal and external) and details/definitions of each relationship. Purpose: The purpose of this component is to identify and define the relationships of the position's key contacts. (Note: Component has two parts to complete.)
Instructions: Completing the "Key Contacts & Relationships" worksheet (Part u)u List of Key Contacts & Relationships
►List and complete all columns for each key contact you maintain in this position ►"Relationship Description" column: Identify relationship type, responsibilities and services provided/received►"Comments" column: Include additional information about the contact (as necessary)
Relationship Description
Relationship Description
Production Schedule (Component - Part v)*
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls1. Key Contacts & Relationships 12
Status # of Hours Required
Start Date End Date
Not Started 0.50 01/21/10 01/22/10Not Started 0.75 02/04/10 02/04/10
TOTAL Effort Required 1.25 Dates & Totals in this box are auto-generated
Start/End Dates for KT 01/21/10 02/04/10Name Date
Component Sign-Off Person Giving KTPerson Receiving KT
* Refer to the Component Instructions page to complete Part v.
KT Tasks and Steps
Compile list of contactsMeet and discuss contacts and relationships
(Insert rows as needed)
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls1. Key Contacts & Relationships 13
Comments
Comments
Description: A list of key contacts (both internal and external) and details/definitions of each relationship. Purpose: The purpose of this component is to identify and define the relationships of the position's key contacts. (Note: Component has two parts to complete.)
►List and complete all columns for each key contact you maintain in this position ►"Relationship Description" column: Identify relationship type, responsibilities and services provided/received►"Comments" column: Include additional information about the contact (as necessary)
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls1. Key Contacts & Relationships 14
Comments
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls2. Assignments 15
Note: Proceed to the next page to complete the Production Schedule (Component - Part v). Sample assignment titles and tasks are included.
Component Description & Purpose
Identify your role (e.g. supervisor, lead analyst, team member, etc.)
Provide current status (e.g. in progress, under review, etc.)
Description: A detailed list of current assignments which may include the following:• Regular ongoing projects• Special assignments• Data analyses & researchPurpose: The purpose of this component is to provide an overview of the position's current assignments.(Note: Component has two parts to complete.)
u Key Information and Responses
Key Information
Identify action steps for completion
Identify timeframes (e.g. deadlines, schedules, etc.)
Identify recipient(s) of the assignment
uConduct Data Analysis Create Procedure Toolkit
Describe the assignment and its purpose
ResponseResponse
Instructions: Completing the "Assignments" worksheet (part u)
►Replace the red text below with the assignment title►Insert additional response columns as needed for each assignment►Insert additional rows to include further key information as appropriate►Input the response to each key information as applicable
Identify frequency of assignment
Identify all parties involved (e.g. team members, contractors, etc.)
Identify where assignment information is stored (e.g. shared drive location, file folder name, etc.)
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls2. Assignments 16
Assignments / Tasks # of Hours Required
Start Date End Date
Conduct Data Analysis Compile/provide procedures 8.00 02/08/10 02/09/10 Provide on the job training 2.00 02/15/10 02/15/10
Create Procedure Toolkit Provide tool kit overview 1.00 03/01/10 03/01/10 Assign senior staff as mentor 0.50 03/01/10 03/01/10 Discuss content information 1.50 03/02/10 03/02/10 Discuss review process 0.50 03/02/10 03/02/10
(Insert rows as needed)
TOTAL Effort Required 13.50 Dates & Totals in this box are auto-generated
Start/End Dates for KT 02/08/10 03/02/10Name Date
Component Sign-Off Person Giving KTPerson Receiving KT
* Refer to the Component Instructions page to complete Part v.
Comments
Not StartedNot Started
Not Started
Not Started
Not Started
Not Started
Production Schedule (Component - Part v)*Status
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls2. Assignments 17
Description: A detailed list of current assignments which may include the following:• Regular ongoing projects• Special assignments• Data analyses & researchPurpose: The purpose of this component is to provide an overview of the position's current assignments.(Note: Component has two parts to complete.)
u Key Information and Responses
Create Procedure ToolkitResponse
Instructions: Completing the "Assignments" worksheet (part u)
►Replace the red text below with the assignment title►Insert additional response columns as needed for each assignment►Insert additional rows to include further key information as appropriate►Input the response to each key information as applicable
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls2. Assignments 18
Comments
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls3. Deliverables 19
Note: Proceed to the next page to complete the Production Schedule (Component - Part v). Sample deliverable titles and tasks are included.
Response
►Replace the red text below with the deliverable title►Insert a separate response column for each additional deliverable title►Insert additional rows to include further key information as appropriate►Input the response to each key information as applicable
Key Information
Identify reviewer(s)
Workforce Analysis Report
Identify action steps for completion
Describe the deliverable and its purpose
Component Description & Purpose
Identify your role
Provide current status (e.g. in progress, under review, etc.)
Identify timeframes (e.g. deadlines, schedules, etc.)
Description: A list of tangible deliverables that are currently in progress or have not been started (e.g. reports, documents, plans, etc.).Purpose: The purpose of this component is to identify the tangible deliverables assigned to the position.(Note: Component has two parts to complete.)
u Key Information and Responses
Identify how input is received (from who and/or where)
u
Instructions: Completing the "Deliverables" worksheet (part u)
Identify where information on the deliverable is stored (e.g. shared drive location, file folder name, etc.)
Identify frequency of deliverable
Identify recipient(s) of the deliverable
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls3. Deliverables 20
Deliverable Title / Tasks Status # of Hours Required KT Start Date KT End Date
Workforce Analysis Report Provide report overview Not Started 2.00 05/06/10 05/07/10 Assign senior staff as mentor Not Started 0.25 05/08/10 05/08/10 Discuss content information Not Started 1.00 05/19/10 05/19/10 Discuss report update process Not Started 0.50 05/20/10 05/20/10
Departmentwide ContractsProvide contracts overview Not Started 1.50 06/01/10 06/02/10Discuss process steps Not Started 2.00 06/03/10 06/04/10Discuss review process Not Started 1.75 06/08/10 06/09/10
(Insert rows as needed)
TOTAL Effort Required 9.00Start/End Dates for KT 05/06/10 06/09/10
Name Date
Component Sign-Off Person Giving KT
Person Receiving KT
* Refer to the Component Instructions page to complete Part v.
Production Schedule (Component - Part v)*
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls3. Deliverables 21
Departmentwide ContractsResponse
Note: Proceed to the next page to complete the Production Schedule (Component - Part v). Sample deliverable titles
►Replace the red text below with the deliverable title►Insert a separate response column for each additional deliverable title►Insert additional rows to include further key information as appropriate►Input the response to each key information as applicable
Description: A list of tangible deliverables that are currently in progress or have not been started (e.g. reports, documents, plans, etc.).Purpose: The purpose of this component is to identify the tangible deliverables assigned to the position.(Note: Component has two parts to complete.)
u Key Information and Responses
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls3. Deliverables 22
Comments
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls4. Activities 23
Note: Proceed to the next page to complete the Production Schedule (Component - Part v). Sample activity titles and tasks are included.
Component Description & Purpose
Identify all parties involved (e.g. team members, participants, recipients, etc.)
Identify activity due dates (if any)
Identify action steps for completion
Identify where activity information is stored (e.g. shared drive location, file folder name, etc.)
Description: A list of activities that are not part of a deliverable or assignment. These are miscellaneous responsibilities that need to be transferred. Examples may include the following:• Coordinating social events• Back-up hard drive• Provide travel information for newcomers• Organize/present internal training sessions Purpose: The purpose of this component is to identify activities not directly part of the position's main/essential responsibilities, but support the organization's goals and objectives.(Note: Component has two parts to complete.)
u Key Information and Responses
►Replace the red text below with the activity title►Insert additional response columns as needed for each activity ►Insert additional rows to include further key information as appropriate►Input the response to each key information as applicable
u Key Information Response ResponseKnowledge MGMT Training Teambuilding Event
Instructions: Completing the "Activities" worksheet (part u)
Describe the activity and its purpose
Identify frequency of activity
Identify your role (e.g. coordinator, leadsperson, supervisor, etc.)
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls4. Activities 24
Status # of Hours Required
Start Date End Date
Not started 4.00 07/10/10 07/10/10Not started 2.00 07/11/10 07/12/10
Discuss prep methods Not started 2.00 07/12/10 07/13/10
Not started 2.00 07/01/10 07/02/10Not started 1.50 07/01/10 07/02/10
11.50 Dates & Totals in this box are auto-generated
07/01/10 07/13/10Name Date
Component Sign-Off Person Giving KTPerson Receiving KT
* Refer to the Component Instructions page to complete Part v.
Discuss training overview Review material/handouts
Plan Teambuilding Event
TOTAL Effort RequiredStart/End Dates for KT
CommentsActivity / Tasks
Provide Knowledge MGMT Training
Production Schedule (Component - Part v)*
Provide event overview Discuss roles
(Insert rows as needed)
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls4. Activities 25
Description: A list of activities that are not part of a deliverable or assignment. These are miscellaneous responsibilities that need to be transferred. Examples may include the following:• Coordinating social events• Back-up hard drive• Provide travel information for newcomers• Organize/present internal training sessions Purpose: The purpose of this component is to identify activities not directly part of the position's main/essential responsibilities, but support the organization's goals and objectives.(Note: Component has two parts to complete.)
u Key Information and Responses
►Replace the red text below with the activity title►Insert additional response columns as needed for each activity ►Insert additional rows to include further key information as appropriate►Input the response to each key information as applicable
ResponseTeambuilding Event
Instructions: Completing the "Activities" worksheet (part u)
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls4. Activities 26
Comments
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls5. Meetings 27
u
Note: Proceed to the next page to complete the Production Schedule (Component - Part v). Sample meeting titles and tasks are included.
Specify meeting format (e.g. face to face, conference call, online meeting, etc.)
Identify meeting frequency (e.g. daily, weekly, etc.)
Response
List the deliverables you provide (or feed into)
List the type(s) of input you provide
Identify meeting coordinator (name/contact information)
Identify scribe (name/contact information)
Provide meeting minutes storage location
Component Description & PurposeDescription: A list of meetings regularly attended and/or coordinated by the position (e.g. committees, ad hocs, taskforce, all staff, one-on-one, etc.). Purpose: The purpose of this component is to identify and provide a detailed schedule of the position's recurring meetings and responsibilities thereto.(Note: Component has two parts to complete.)
►Replace the red text below with the meeting title►Insert a separate response column for each additional meeting►Insert additional rows to include further key information as appropriate►Input the response to each key information as applicable
u Key Information and ResponsesInstructions: Completing the "Meetings" worksheet (part u)
Workforce Ad HocKey Information
Identify your role
Response
State meeting purpose or objectives
Specify set day/time and/or location (as applicable)
Weekly Team Meeting
Describe how to ensure actions are followed up and completed on time
Identify chairperson/facilitator (name/contact information)
List attendees and their role
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls5. Meetings 28
Meeting Title / Tasks # of Hours Required KT Start Date KT End Date
Weekly Team Meeting Discuss meeting overview 2.00 01/02/10 01/03/10 Provide sample deliverables 1.00 01/05/10 01/05/10
Workforce Ad Hoc Discuss meeting overview 1.00 02/01/10 02/02/10 Provide debriefing process 4.00 02/03/10 02/03/10
(Insert rows as needed)
TOTAL Effort Required 8.00 Dates & Totals in this box are auto-generatedStart/End Dates for KT 01/02/10 02/03/10
Name Date
Component Sign-Off Person Giving KTPerson Receiving KT
* Refer to the Component Instructions page to complete Part v.
Not Started
Production Schedule (Component - Part v)*
Not Started
Status Comments
Not StartedNot Started
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls5. Meetings 29
Description: A list of meetings regularly attended and/or coordinated by the position (e.g. committees, ad hocs, taskforce, all staff, one-on-one, etc.). Purpose: The purpose of this component is to identify and provide a detailed schedule of the position's recurring meetings and responsibilities thereto.(Note: Component has two parts to complete.)
►Replace the red text below with the meeting title►Insert a separate response column for each additional meeting►Insert additional rows to include further key information as appropriate►Input the response to each key information as applicable
u Key Information and ResponsesInstructions: Completing the "Meetings" worksheet (part u)
Workforce Ad HocResponse
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls5. Meetings 30
Comments
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls6. Vital Information31
Description & Purpose
Instructions: Technology (related Information) u
Technology
Process
Note: Proceed to the next page to continue with the "Vital Information" worksheet (subject areas w and x).
u
v
Description & Purpose
Description: A list of vital information pertinent to this position which includes the following subject areas: u technology, v processes, w performance enhancement mediums, and x resource tools. (Examples are provided within the instructions for each subject area.) Purpose: The purpose of this component is to identify information pertinent to this position and its source and/or storage location.
Information Source/Storage Location
Instructions: Processes (related Information) v
Information Source/Storage LocationDescription & Purpose
►List all technologies used by this position aside from MS Office programs (e.g., software, applications, database, ABMS, PIE, MIRS, Adobe Photoshop, etc.)►Complete the description and purpose of information and its source location (e.g., file paths, intranet/internet site, etc.) ►Provide additional comments if needed (e.g., special instructions to obtain/access information, frequency of usage, etc.)
►List all documented processes used by this position (e.g., State Contracting Manual, SPB Policies [Pinkies], procedures, standards, etc.)►Complete the description and purpose of information and its source location►Provide additional comments if needed (e.g., special instructions to obtain/access information, frequency of usage, etc.)
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls6. Vital Information32
Performance Enhancement Medium
Resource Tools
Note: Proceed to the next page to complete the Production Schedule (Component - Part v). Sample vitial information titles and tasks are included.
w Description & Purpose
x
Information Source/Storage Location
Information Source/Storage LocationDescription & Purpose
Instructions: Resource Tools x
►List all performance enhancement mediums relative to the position (e.g., industry newsletters/articles, networking venues, webcasts/webinars, etc.)►Complete the description and purpose of information and its source location (e.g., online or physical archives of newsletters, etc.)►Provide additional comments if needed (e.g., special instructions to obtain/access information, frequency of usage, etc.)
►List all resource tools used in the position (e.g., SPB's Recruitment Sources Directory, toolkits, information maps or binders, etc.)►Complete the description and purpose of information and its source location►Provide additional comments if needed (e.g., special instructions to obtain/access information, frequency of usage, etc.)
Instructions: Performance Enhancement Medium (related information) w
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls6. Vital Information33
Vital Information / Tasks # of Hours Required
Start Date End Date
Technology Related Information Provide overview 0.50 05/01/10 05/01/10 Provide hands-on demonstrations 1.50 05/01/10 05/01/10
Process Related Information Provide overview 1.00 06/08/10 06/11/10 Provide procedures manual 0.50 06/12/10 06/12/10
Performance Enhancement Provide overview 2.50 07/05/10 07/07/10 Discuss best practices 1.25 07/08/10 07/08/10
Resource Tools Discuss available tools 0.50 08/06/10 08/06/10
(Insert rows as needed)
7.75 Dates & Totals in this box are auto-generated
05/01/10 08/06/10Name Date
Component Sign-Off Person Giving KTPerson Receiving KT
* Refer to the Component Instructions page to complete Part v.
Production Schedule (Component - Part v)*Comments
Start/End Dates for KTTOTAL Effort Required
Status
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls6. Vital Information34
Comments
Comments
Description: A list of vital information pertinent to this position which includes the following subject areas: u technology, v processes, w performance enhancement mediums, and x resource tools. (Examples are provided within the instructions for each subject area.) Purpose: The purpose of this component is to identify information pertinent to this position and its source and/or storage location.
►List all technologies used by this position aside from MS Office programs (e.g., software, applications, database, ABMS, PIE, MIRS, Adobe Photoshop, etc.)►Complete the description and purpose of information and its source location (e.g., file paths, intranet/internet site, etc.) ►Provide additional comments if needed (e.g., special instructions to obtain/access information, frequency of usage, etc.)
►List all documented processes used by this position (e.g., State Contracting Manual, SPB Policies [Pinkies], procedures, standards, etc.)►Complete the description and purpose of information and its source location►Provide additional comments if needed (e.g., special instructions to obtain/access information, frequency of usage, etc.)
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls6. Vital Information35
Comments
Comments
Note: Proceed to the next page to complete the Production Schedule (Component - Part v). Sample vitial information titles
►List all performance enhancement mediums relative to the position (e.g., industry newsletters/articles, networking venues, webcasts/webinars, etc.)►Complete the description and purpose of information and its source location (e.g., online or physical archives of newsletters, etc.)►Provide additional comments if needed (e.g., special instructions to obtain/access information, frequency of usage, etc.)
►List all resource tools used in the position (e.g., SPB's Recruitment Sources Directory, toolkits, information maps or binders, etc.)►Complete the description and purpose of information and its source location►Provide additional comments if needed (e.g., special instructions to obtain/access information, frequency of usage, etc.)
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls6. Vital Information36
Comments
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls7. Issues & Risks 37
Note: Proceed to the next page to complete the Production Schedule (Component - Part v). Sample issue/risk titles and tasks are included.
Instructions: Completing the "Issues and Risks" worksheet (part u)
Description: A list of active issues/risks inherent with this position defined as:● Issue – An unresolved or disputed matter that has a critical impact or importance to the organization.● Risk – An unresolved or disputed matter that harms or exposes the organization to potential litigation or negative public scrutiny.
Purpose: The purpose of this component is to provide an understanding of the active issues/risks inherent with this position. (Note: Component has two parts to complete.)
u Key Information and Responses
Component Description & Purpose
Untimely Quarterly Report
Specify if this is an issue or risk
►Replace the red text below with the topic title►Insert additional response columns as needed for each topic►Insert additional rows to include further key information as appropriate►Input the the response to each key information as applicable
Describe the issue or risk
Key Information
Provide background information
Describe who and/or what is affected (include impact/loss)
Identify your role (e.g., supervisor, lead analyst, team member, etc.)
Identify where subject information is located (e.g., shared drive location, file folder, email, etc.)
Identify resolution/mitigation actions taken
Identify the current status
u
Provide recommendations to resolve/mitigate (if any)
Provide additional comments or input (if any)
Resources Improperly AllocatedResponse Response
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls7. Issues & Risks 38
Issues & Risks/Tasks # of Hours Required
Start Date End Date
Untimely Quarterly Report Provide overview 1.00 02/08/10 02/08/10 Discuss concerns 2.00 02/08/10 02/08/10
Resources Improperly Allocated Provide overview 1.50 02/15/10 02/15/10 Discuss concerns 2.50 02/16/10 02/16/10
(Insert rows as needed)
7.00 Dates & Totals in this box are auto-generated
02/08/10 02/16/10Name Date
Component Sign-Off Person Giving KTPerson Receiving KT
* Refer to the Component Instructions page to complete Part v.
Not Started
TOTAL Effort Required
Not Started
Not Started
Comments
Start/End Dates for KT
Status
Production Schedule (Component - Part v)*
Not Started
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls7. Issues & Risks 39
Description: A list of active issues/risks inherent with this position defined as:● Issue – An unresolved or disputed matter that has a critical impact or importance to the organization.● Risk – An unresolved or disputed matter that harms or exposes the organization to potential litigation or negative public scrutiny.
Purpose: The purpose of this component is to provide an understanding of the active issues/risks inherent with this position. (Note: Component has two parts to complete.)
u Key Information and Responses
►Replace the red text below with the topic title►Insert additional response columns as needed for each topic►Insert additional rows to include further key information as appropriate►Input the the response to each key information as applicable
Resources Improperly AllocatedResponse
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls7. Issues & Risks 40
Comments
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls8. Lessons Learned41
Component Description & Purpose
Construction ProjectWhat went well? What needs improvement?
Data AnalysisWhat went well? What needs improvement?
(Insert Topic Title)What went well? What needs improvement?
Note: Proceed to the next page to complete the Production Schedule (Component - Part v). Sample topic titles and tasks are included.
Suggestions for Improvement Lessons Learned
Suggestions for Improvement Lessons Learned
Instructions: Completing the "Lessons Learned" worksheet (part u)u Lessons Learned► Replace the red text below with the topic title (Note: topics may include projects, special assignments, processes, significant role experiences, etc.)► Provide a response for each column header► Insert additional rows to include further subtopics
u
Description: An exercise conducted by the individual (in the position) to identify successes and failures at the completion of a project, activity or while performing ongoing work. The individual evaluates the process used (and its results) and then identifies what was done right and what could be done better the next time. Results can be shared and used in future projects or work activities.Purpose: To record and share the lessons learned from the individual while in the position. (Note: Component has two parts to complete.)
Suggestions for Improvement Lessons Learned
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls8. Lessons Learned42
Topic Title / Tasks Status # of Hours Required KT Start Date KT End Date
Construction ProjectCompile project information Not Started 1.00 02/15/10 02/15/10Provide overview Not Started 1.50 02/16/10 02/16/10Discuss concerns Not Started 2.00 02/17/10 02/17/10
Data AnalysisCompile data samples Not Started 2.00 04/05/10 04/06/10Provide overview Not Started 1.00 04/06/10 04/07/10Discuss concerns Not Started 2.25 04/07/10 04/08/10
(Insert rows as needed)
TOTAL Effort Required 9.75Start/End Dates for KT 02/15/10 04/08/10
Name DateComponent Sign-Off Person Giving KT
Person Receiving KT
* Refer to the Component Instructions page to complete Part v.
Production Schedule (Component - Part v)*
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls8. Lessons Learned43
Note: Proceed to the next page to complete the Production Schedule (Component - Part v). Sample topic titles and tasks are included.
Lessons Learned
Lessons Learned
u Lessons Learned► Replace the red text below with the topic title (Note: topics may include projects, special assignments, processes, significant role experiences, etc.)► Provide a response for each column header► Insert additional rows to include further subtopics
Description: An exercise conducted by the individual (in the position) to identify successes and failures at the completion of a project, activity or while performing ongoing work. The individual evaluates the process used (and its results) and then identifies what was done right and what could be done better the next time. Results can be shared and used in future projects or work activities.Purpose: To record and share the lessons learned from the individual while in the position. (Note: Component has two parts to complete.)
Lessons Learned
Downloaded from http://www.tidyforms.com
Knowledge Transfer Plan
Macintosh HD:private:var:folders:wj:v91nt3ds7l916b56tfklryr80000gp:T:Acr5202696102356-5396.tmp:FE81E38E99DF135F70D72EF58098ED9D.xls8. Lessons Learned44
Comments
Downloaded from http://www.tidyforms.com
top related