G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

By Ir. Dr. Gue See Sew

http://www.gnpgeo.com.my

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

CONTENTS

• SOIL NAIL– INTRODUCTION– DESIGN CONCEPT– MODES OF FAILURES– CONSTRUCTION SEQUENCE– TESTING

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

Soil Nail Slope Failure

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

FACE FAILURE

CORRECTMain reinforcement at back of steel plate

INCORRECTMain reinforcement in front of steel plate

Main reinforcement

Steel plate

Main reinforcement

Steel plate

Shotcrete facing

Shotcrete facing

Soil face

Soil face X

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

INTRODUCTION

• ADVANTAGES– Minimum Loss of Land– Minimum Temporary Shoring– Minimum Earthwork

**More suitable for cut ground.

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

Required Space

SLOPE CHASING

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

INTRODUCTION

• DISADVANTAGES– Nail Encroachment Lot Boundary

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

DESIGN CONCEPT

• Common design reference– BS8006 : Code of practice for Strengthened/

reinforcement soils and other fills (1995)– Federal Highway Administration (FHWA) :

Manual for Design & Construction Monitoring of Soil Nail Walls (1998)

– Department of Transport (DoT) : Design Manual for Roads and Bridges, Vol. 4, Section 1, Part 4, HA68/94 (1994)

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

FREE LENGTH FIXED LENGTH

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

DESIGN CONCEPT- FRICTION

• Ultimate Unit Friction– fsu=4~6 NSPT

• Ultimate Friction for Each Nail– fsuAsL

As = Surface Area of NailL = Length of Nail

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

DESIGN CONCEPT- GROUT-STEEL BOND STRESS

Conditions of Contact Surface

Ultimate Bond Stress

Locally Noded Strand3,000kPa

Clean Deform Bar2,000kPa

Clean & Crimped Wire1,500kPa

Clean & Plain Bar/Wire1,000kPa

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

DESIGN CONCEPT- STEEL

• BS8110 (Ultimate) : TN = 0.87 × fy × As

• FHWA (Allowable) : TN = 0.55 × fy × As

• Steel Elements/Connection : BS5950• Reinforced Concrete : BS8110

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

MODE OF FAILURES

• Three Modes of External Stability

SLIDING TOPPLING BEARING CAPACITY

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

Failure Mode –

Nails Pull Out of Resistant Zone

b) Pullout Failure

Failure Mode –

Face Failure and “Active” Zone Sliding Off Front of Nails

a) Face Failure

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

MINIMUM FOS: 1.40

Failure Mode –

Tensile Failure of Tendon

c) Nail Tendon Failure

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

CONSTRUCTION

Maximum 2.0m

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

DRILLING- Down the Hole Hammer

Backheads

Chuck Valve

WearsleeveSpring

Distributor

Internal Cylinder Piston Piston

Retainer Ring

Bit Retainder

Ring

Bit

• DTH Piston : Direct impact on bit & less loss of impact energy

• Penetration Rate ∝ Air Pressure

• Compressed Air : Power Source & Flushing Medium

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

DRILLING- TRICONE BIT

79mm NW Casing Advancer

75mm TriconeDrillbit

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

DRILLING BIT – TUNGSTEN CARBIDE

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

SOIL NAIL

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

SOIL NAIL SPECIFICATION

• Galvanized thickness of 85µm (Minimum)

• To be checked with Magnetic Gauge

• 2 coats of zink coater (6 hours apart) should be applied after threading and to scratched surfaces

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

SOIL NAIL- CENTRALIZER

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

SOIL NAIL- CENTRALIZER

• Minimum size = Hole diameter – 12mm

• Minimum of grade D PVC pipe

• Must not collapse under weight of nail

• Maximum 4m c/c spacing

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

GROUT MIX

• Specify NON-SHRINKAGE grout

• W/C ratio = 0.45

• Grout Mix = Cement : A/Shrinkage Agent : Water50kg :0.5kg (or as specified) : 22.5kg

• Grout Strength (28 days)= 30MPa( 7 days)= 21MPa (70%)

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

GROUTING METHOD

• Low pressure pump

• To be grouted on the same day as drilling

• Tremie bottom up with grout pipe installed till the end of nail.

• Overspill for 30 seconds

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

SCHEMATICS

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

FACE FAILURE

CORRECTMain reinforcement at back of steel plate

INCORRECTMain reinforcement in front of steel plate

Main reinforcement

Steel plate

Main reinforcement

Steel plate

Shotcrete facing

Shotcrete facing

Soil face

Soil face X

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

HORIZONTAL DRAIN

• Inserted deeper within the slope (Weepholes likely to get clogged)

• Wrapped around with geotextile (TS20)

• Waterstop to be wrapped with geotextileand secured with steel wire

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

HORIZONTAL DRAIN

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

FACING

• Three types of facing– Pad Facing

• Used when soil is not susceptible to surface erosion

• Presence of obstruction

– Shotcrete • For soils which are prone to erosion

– Grid Beam• Used when soil is not susceptible to surface

erosion

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

PAD FACING

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

SHOTCRETE FACING

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

GRID BEAM FACING

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

PULLOUT TEST

• To measure and confirm fixed end frictionof soil nail

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

PULLOUT TESTS

• Preliminary Pull Out Test– Sacrificial test of additional point

• Working Pull Out Test– Nail is stress only to working load

• Instrumented– With strain gauge

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

PULLOUT TEST

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

By Ir. Dr. Gue See Sew

http://www.gnpgeo.com.my

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

CONTENTS

• Introduction• Types of Failures• Options

• Design Concept of Rock Bolt

- Netting

- Scaling

- Shotcreting

- Rock Bolt

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

INTRODUCTION

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

INTRODUCTION

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

INTRODUCTION

• Used to stabilize weak rock mass.

• Acts in the same manner as soil nail.

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

TYPES OF FAILURES - SLIDING

MULTIPLE BLOCKS/MULTIPLE PLANE SLIDING

SINGLE BLOCK/SINGLE PLANE SLIDING

SINGLE BLOCK/STEPPED PLANE SLIDING

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

SLIDING FAILURE

Planar Failure

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

TYPES OF FAILURES - WEDGE

SINGLE WEDGE

/MULTIPLE INTERSECTING PLANES

SINGLE WEDGE

/TWO INTERSECTING PLANES

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

WEDGE FAILURE

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

TYPES OF FAILURES - TOPPLING

Toppling failure in hard rock which can form columnar structure separated by steeply dipping discontinuities

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

TOPPLING FAILURE

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

STEREOGRAPHIC PLOT ANALYSIS

Wedge Failure Zone

Toppling Failure Zone

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

OPTIONS

• Shotcreting– To prevent loose rocks from falling

• Scaling– To chisel off small loose rocks

• Rock Bolt– To stabilize large rock mass

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

NETTING

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

SCALING

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

SHOTCRETING

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

ROCK BOLT

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

Fg

Fgx

Fgy

Ff

'cos'sin φµφ mgmg =

'cos'sin φµφ =

µφφ =

'cos

'sin

'tanφµ =

fgx FF =

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

ROCK BOLT

FAILURE PLANE

GROUT

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

SCHEMATICS

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

COMPONENTS OF ROCK BOLTT40 Galvanized Steel Bars

Galvanized Steel Plates

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

ROCK BOLT SPECIFICATION

• Galvanized thickness of 85µm (Minimum)

• To be checked with Magnetic Gauge

• 2 coats of zink coater (6 hours apart) should be applied after threading and to scratched surfaces

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

CENTRALIZER

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

ROCK BOLT CENTRALIZER

• Minimum size = Hole diameter – 12mm

• Minimum of grade D PVC pipe

• Must not collapse under weight of nail

• Maximum 4m c/c spacing

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

THINGS TO CHECK - SHOTCRETE

• Ensure sufficient:– Properly protected weepholes– Lapping of BRC wire mesh– Cover of BRC & rock surface

• Ensure shotcreting is done TOP DOWN

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))

CONCLUSION

• 100% Check and Review Design

• Site Supervision

G&P G&P GeotechnicsGeotechnics SdnSdn BhdBhd ((www.gnpgroup.com.mywww.gnpgroup.com.my))