lecture 3: case studies, mini-project introduction · pdf file•introduction to mini...
Post on 13-Mar-2018
214 Views
Preview:
TRANSCRIPT
D-LabSpring 2010
Development through
Dialogue, Design and Dissemination
1
Today’s Class
• Logistics• Charcoal Press Case Study• Technology Case Studies• Introduction to Mini Project
2
Logistics
• Project Selection (Mar 1) – Design challenge descriptions due for
review by Wednesday, Feb 17 – Slides due by noon on Wednesday, Feb
24
3
“Brute force engineering options often meet the criteria but somewhere there is a profound solution, which is simple, cheap, and beautiful. Hold out for this as long as possible.”
- Kurt Kornbluth Former D-Lab Instructor
4
Fuel from the Fields Charcoal Project
5
Forming Briquettes by Hand
6
Fragile Briquettes
7
Mechanized Briquette Maker ~$8,000
8
The First Prototype: ~$25
9
4 - 5 Briquettes/minute
10
Time Study
Hammer, 24%
Load, 34%
Cleaning, 17%
Eject, 42%
11
6 - 8 Briquettes/minute, $30
12
$30 $20
13
$20 $2
14
10 - 12 Briquettes/min
15
“If you want to make something 10 times as cheap, remove 90% of the material.” - Amy Smith D-Lab Instructor
16
“Brute force engineering options often meet the criteria but somewhere there is a profound solution, which is simple, cheap, and beautiful. Hold out for this as long as possible.” - Kurt Kornbluth Former D-Lab Instructor
17
“Everything should be made as simple as possible, but not
simpler.” - Albert Einstein
18
“Simplicity is the ultimate sophistication.”
- Leonardo Da Vinci
19
Now, Even Simpler
20
Design Mini Project
Affordable Rainwater Harvesting
21
Background and Inspiration • Pestel, Haiti • Rainwater Harvesting Systems
– Cisterns – Polytanks
• SODIS bags • Tippy Tap • IDE Drip Kits • Paul Polak’s divisible horse • Pigs
22
Pestel, Haiti
23
Pestel, Haiti
24
Pestel, Haiti
25
Pestel, Haiti
26
Pestel, Haiti
27
Other Storage Methods
28
Sodis
29
Tippy Tap
30
Paul Polak’s Divisible Horse
Photo of pack horse carrying water cans removed due to copyright restrictions.
31
Pigs
Photo courtesy of gurdonark on Flickr.
32
Pigs
33
Coming up… • Design Packet (v. 1.0) • Mini Project
– Information – Initial Ideas
• Project Selection (Mar 1) – Design challenge descriptions due for review by
Wednesday, Feb 17 – Slides due by noon on Wednesday, Feb 24
34
MIT OpenCourseWarehttp://ocw.mit.edu
EC.720J / 2.722J D-Lab II: Design Spring 2010
For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms.
top related