Malawi 2014

Building Progress

• Administration block and staff toilets internally painted with PVA and 2 topcoats

•Window frames repainted with 2 coats now glazed

Classrooms 1&2

• Re-painting all the glazed window frames with two coats of gloss and cleaning the glass

• Painted murals

Classroom 4

Cleared rubbish, swept and re-organised all the building materials (including 10 tonnes of roof timber), making room for next consignment of roof timber

Teachers Houses 1&2

• Cleared rubbish• Scraped concrete debris from

floors & walls• Swept & prepared for painting• PVA & 2 topcoats completed

in house 1• PVA completed in house 2

Builder & labourers work• Five sections of floors poured

for second school block

• Walkway between block 1 and toilet block poured

• Bricks made and 2 brick kilns built and fired

Fundraising Matters• £9125 was taken out for the

project this year.• Parachute purchased &donated to

the school• 200 book bags purchased • Personal donations given to mission

partners

Good Job done!

Time Out

Sunrise Devotions

Bible Translation Project

R&R at Lake Malawi

What Next?• Please continue to pray:• Head-teacher still needed.• Toilet block needs completing

before school can be inspected & opened

• Second block of 4 classrooms + library to be built

• 6 more teachers houses to build

Staff Team Plans

David & Pauline are still committed to lead the Malawi project forward.