manual de bomba vertical.pdf
Post on 15-Sep-2015
342 Views
Preview:
TRANSCRIPT
-
SELLER DOCUMENT REVIEW
Permission to proceed does not constitute acceptance or approval of design detail, calculations, analysis, test methods, or materials developed or selected by SELLER, and does not relieve
SELLER from full compliance with contractual obligation.
1 Work may proceed
Revise & Resubmit. Work may proceed subject to incorporation of changes
2
3
4
5
Revise & Resubmit. Work may NOT proceed
Review not required. Work may proceed
Cancelled / Superseded
Reviewer Name:
Discipline:
Date:
Doc Type Code:
Job # VP #
Subm Equip #
Program #
Job # VP #
SEQ # Equip #
Document Status: 1Octavio Aravena
EM - Mechanical25580-220002
NA;
3/24/2011V1A
25580-220-V1A-MPVY-000140330-PPH-0001
-
1.1 1.2 1.3 1.4
2 .
2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8
3 .
4 .
5 .
6 .
6.1 6.2 6.3 6.4 6.5 6.6
7 .
8 .
8.1 8.2
-
9 .
9.1 9.2 9.3 9.4 9.5
9.5.2 9.5.3 9.5.4
1 0 .
10.1 10.2 10.3 10.4 10.5 10.6
1 1 .
11.1 11.2
-
1 .
-
4 .
-
1.
2.
3.
-
4. 5. 6.
7. 8. 9. 10.
-
8 .1
8 .2
-
ppp
p
p
p
pp
p
pp
p
p
p
pp
-
pp
p
p
p
p
p p
top related