measure j & measure n€¦ · measure j • new 21st-century classrooms at thomas edison,...
Post on 04-Jul-2020
1 Views
Preview:
TRANSCRIPT
Bond Construction Update Measure J & Measure N
San Juan Unified continues to build!
• Successful 2015 summer build season
• Signature Projects
• Churchill Middle School open
• Sylvan Middle School’s future campus
• Class size reduction projects
• Safety projects
• Innovation & Efficiency
Summer Construction • Started more than
$84 million in projects (construction and design) from Measure N and Measure J
• New 21st-century classrooms at Thomas Edison, Churchill, Pasadena and Dyer-Kelly
• Wireless upgrades at 54 schools
• LED lighting retrofit • Paving, landscaping • Restroom
renovations at five schools
• Signature Project Design
• Future Sylvan Middle School groundbreaking
High School Signature Projects
• Rio Americano Performance and Academic Center & Bella Vista Science Wing to break ground in 2016
• Completion of Rio and BV in Q1 of 2017
• Round 2 of signature project planning in 2016
Rio Americano Performance & Academic Center
• Two music classrooms
• 350-seat auditorium
• Floor level stage
• Used for music and
academic programs like
Civitas
• Lobby
• Displays student artwork
• Box office
Bella Vista High science wing
• Scheduled for March 2017 completion
• Innovative 10,000-square foot “flex space”
• 11 Classrooms • Biology • Chemistry • Anatomy • Technology
• Scheduled for fall of 2018 completion
• Still in early programming phase – Early concept
design – 500+ seats – Raised stage – Lighting with
catwalk
El Camino performing arts
center
Churchill Middle School
• Opened to students Jan. 6
• Nine 21st-century classrooms
– Two 70” flat screens in each room
– Flexible furniture
– Writing surfaces on multiple walls
• Media room
• Computer lab
• Physical education studio
• Grand opening event for public on Jan. 21, 2016
Future Sylvan Middle School campus
• Library • Music room • STEAM Lab • Resource center • Science labs • PE & Outdoor space • Entry improvements • Current classroom
renovations
www.sanjuan.edu/futuresylvan
New and modernized classrooms to accommodate Science, Technology, Engineering, Arts & Math curriculum include:
Class Size Reduction
• New buildings to accommodate smaller class sizes:
– Mariemont
– Del Dayo
– Greer
– Cowan
– Edison
– Sierra Oaks
– Thomas Kelly
• Fencing installed at Skycrest, Coyle, Thomas Kelly & Woodside
• Three more fencing projects being planned with input from Safe Schools
Safety projects
Innovation & Efficiency
• LED lighting project replacing 39,000 bulbs at all nine comprehensive high schools
• $400,000 SMUD rebate • $233,000 annual savings on utility
bills • Negotiating SMUD rebate for
middle school project this summer
• Technology standards that include 70” flat screen monitors and furniture standards that promote flexible learning spaces
• Wireless infrastructure
Questions?