CLIENT:Mr.Abdulla Abdul Rahman Mohd Al Mohammad

IR No: 59 Date: 22-06-2015 Rev. 00 PROJECT: (B+G+12+GYM+ROOF) Resident Building At Al Nahda

CLIENT:Mr.Abdulla Abdul Rahman Mohd Al Mohammad

CONSULTANT:Access Engineering Consultancy

CONTRACTOR:M/s Modern Executive Contracting System L.L.C

Inspection Required on Date:, ArchitecturalStructural/CivilMEP

A/CElectrical Plumbing

Drawings/Specifications/Standard references

Drawings

Inspection Request For(IR):Location of Item:

Drainage High Level9th Floor

For MESC: Project Manager: Mep MESC : Date: Received by Consultant: Results of Inspection:

A

Work may proceed.

BWork may proceed subject to incorporate the below comments

CWork may not proceed, corrections must be implemented, re-inspection required

DWork may not proceed, work done not as per contract specific actions

Comments:

Consultant Engineer:Date:Resident Engineer :Date:

Received by contractor: Date: