1M. Popovic

MuCool Collaboration Meeting

Milorad Popovichttp://www-bdnew.fnal.gov/proton_source/popovic/index.html

6-Feb-2002

2M. Popovic

3M. Popovic

View from the top of Wilson Hall, 2001

Access

4M. Popovic

Close Up, 2001

5M. Popovic

WarningAny usage of the facility should be completely parasitic to Linac Operations and maintenance. Construction will/should require only modest, ~ three weeks of invasive interaction with Linac, which will/should be schedule as part of regular shutdowns.

1. Liquid Hydrogen Absorber test facilitya. Engineering Tests no Beam----Jun-2001

b. Beam Related Hydrogen Absorber test ------Jun-2002

c. Short Fully Integrated Cooling Section, H-Abs., Be-Window RF Cavity, SC Solenoid----Sep-2002

2. High Power RF Test Bed, 200MHz and 805MHza. Be Window RF Cavity, High Power RF Test---Sep-2002

b. Grid Based RF Cavity, High Power Test—Sep-2002

c. Cryo Cold Copper Cavity

Near Future Activities

6M. Popovic

People&Groups• Universities&FNAL

D.Kaplan, M.A.Cummings, E.Black, J.Norem, D.Summers S.Geer,….

• FESSJ.Sims-Structural Eng. R. Alber-G.VanZandbergen-Architect

• Cryo B.Norris, A. Klebaner, A. MartinezC. Darve

• RFA. Moretti

• Beam LineC. Johnstone

• InstrumentationD. Errede, M. Shea

• SafetyJ. Priest-ES&HM.Gerardi-RadiationM.Ferguson-Linac AreaB.Fritz-Environment

• LH2-Safety?J.Kilmer, AllspachW.Smart

• ProtonSourceB.Webber-G.LeaderJ. Lackey

7M. Popovic

Target Dates• 1-May-01 End of Civil Construction for Phase I

Start LH2 Target InstallationStart Helium Plant Installation

• 20-April-01 Start Helium Plant Removal from PS4• 1-April-01 Cryo Moving/Assembly Contracts Awarded• 15-March-01 Cryo Related Bids Out• 1-March-01 Cryo Design Ready/Start of Civil Const. • 15-Feb-01 Civil Const. Contracts Awarded• 1-Feb-01 Const., LH2, He,.. Safety Issues Defined • 15-Jan-01 Enclose&Cryo Building Bids Ready/Out• 20-Dec-00 Enclose&Cryo Building Design Ready• 15-Dec-00 Architectural Design Review by Lab B.C.

8M. Popovic

History

9M. Popovic

Jan-30-2001

10M. Popovic

View from the top of Linac Berm

11M. Popovic

30-Aug-2001

12M. Popovic

1500kVA Transformer Piping

13M. Popovic

1500kVA Transformer, Oct-2001

14M. Popovic

MuCool Site Plan as Jan-02

15M. Popovic

Schedule page 1

16M. Popovic

Schedule, page 2

17M. Popovic

Spending Profile

MuCool Spending ProfileW/ OHP

$142,000

$0 $0

$70,840

$175,120

$292,160

$15,000

$344,160$298,640

$44,000

050000

100000150000200000250000300000350000400000

Jan-02

Feb-02

Mar-02

Apr-02

May-02

Jun-02

Jul-02

Aug-02

Sep-02

Oct-02

Nov-02

Dec-02

Amount Earned by Month

Dol

lars

18M. Popovic

Future

Looking North

Looking South