Presented to the Moffett Restoration Advisory Board

TRANSCRIPT

1

Former NAS Moffett Field

Hangar 1 Removal Action Update

Bryce Bartelma, PG

Navy BRAC PMO West

November 3, 2011

RAB Meeting

2

Presentation Overview

• Project Objective

• Progress Update Continued Monitoring

and ProtectionMeasures

Historic Mitigation/CARP

Scaffolding Installation

• Schedule

• Questions

Roof, Redwood, Siding &Window Removal

Coating Inspections &Touch-ups

Moving Scaffolding

3

• Control release of PCBs from Hangar 1 in accordancewith EE/CA (July 2008) and Action Memorandum(December 2008)

Demolition of interior structures

Removal of contaminated siding

Application of weather-resistant coating to steel frame

Project Objective

4

Continued Monitoring andProtection Measures

• No observed impacts to biologicalactivity

• Continued storm water and groundsurface protection

• Navy and NASA air monitoring datademonstrates control of air emissions

5

EPA and Water Board Site Inspection

6

Hangar 1 Interactive CD

• Delay in final production. CD will contain interactivehistory and interviews but not 3-D tour.

• Navy and NASAlooking into a webbased version thatwill be hosted byNASA website andwill contain both theinteractive materialsand 3-D tour!

7

Continued Mansard Panel Removal

8

Continued Redwood Removal

9

Continued Silver Siding Removal(Robertson Protected Metal)

10

Window and Door Removal

11

Zone 1 Exterior Coating & Touch-ups

• Use of man lifts forlower level touch-ups

12

Zone 2 East Progress – September 7

13

Zone 2 East Progress – September 20

14

Zone 2 East Progress – October 12

15

Zone 2 West Progress – September 6

16

Zone 2 West Progress – October 3

17

Zone 2 West Progress – October 12

18

Removing Scaffolding in Zone 1

19

Interior View

20

Installing Systems Scaffolding& Quick Deck in Zone 6

21

Clam Shell Door Mechanisms

22

Fiber Board Removal

• Fiber boards surroundtracks of Clam Shell doors

• Recently sampled anddetermined to containcontamination

• Not structural

• Navy to remove boardsbut keep rails in-place

• NASA to considerreplacement in re-use

23

Special Visitor at Moffett

24

Schedule

• Fieldwork in zones 1 – 6Ongoing

• Complete fieldwork,confirmation samplingand demobilizeSpring/Summer 2012

• Submit After ActionCompletion ReportSummer/Fall 2012

25

Questions?

Point of Contact:

Scott Anderson

BRAC EnvironmentalCoordinator

(619) 532-0938

scott.d.anderson@navy.mil