mofix easy to install spenncon rail as no - 3516 · pdf filespace-saving solution ... tel: +55...

Post on 26-Mar-2018

235 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

MOFIXQuick, efficient track pole solutions

MOFIXEASY TO INSTALLSpace-saving solutionMOFIX is an innovative precast concrete foundation for catenary poles or anti-noise barriers. The method of drilling used for installation requires little space, which can be a significant advantage if carried out close to other rail installations.

There is no risk of settlement around the foundation thanks to the drilling technique and casing used. As a consequence, sleepers do not have to be removed.

Phot

os: ©

Con

solis

/ De

sign:

Mali

ka B

enam

ara /

Cop

ywrit

ing:

Vict

oria

Mar

shall

/ CO

N-Ra

il M

ofix1

.0 -

09/1

6 - ©

201

6 CO

NSOL

IS

SPENNCON RAIL AS Hensmoveien 98NO - 3516 Hønefoss - NorwayTel: +47 452 01 228www.spennconrail.no

THE NETHERLANDSSPANBETON B.V. Hoogewaard 207 / 209 NL - 2 396 AS Koudekerk a/d Rijn The Netherlands Tel: +31 (0)71 342 02 00 Email: info@spanbeton.nl www.spanbeton.nl

NORWAYSPENNCON RAIL AS Hensmoveien 98NO - 3516 HønefossNorwayTel: +47 452 01 228www.spennconrail.no

POLANDWPS Wytwórnia Podkładów Strunobetonowych S.A. Mirosław Ujski 51 - 64 850 Ujście Poland Tel: +48 67 28 40 340www.wps-sa.com.pl

PORTUGALSATEPOR Edificio Coopali - Rua José Afonso 4-C, 1° PT-1600-130 Lisbon - (São Domingos de Benfica) Portugal Tel: +351 217 200 670

SERBIARAJ SCHWELLEN 28, Octobra 6613 320 Velika Plana SerbiaTel: +381 (0)26 515 140www.rajschwellen.rs

SWEDENSTRÄNGBETONG RAIL AB Svärdvägen 29SE - 182 33 DanderydSwedenTel: +46 (0)8 615 82 00www.strangbetongrail.se

UKSBC RAIL Littlewell Lane - Stanton-by-Dale Ilkestone, DerbyshireDE74QW, United Kingdom Tel: +44 (0)115 944 1448 Email: info@stanton-bonna.co.uk www.stanton-bonna.co.uk

HEAD OFFICECONSOLISTour Europe - 33, place des Corolles92400 CourbevoieFranceTel: +33 (0)1 46 53 24 00www.consolis.com

BRAZILCONSOLIS BRAZIL Rua Coronel Oscar Porto,736, Sala 12B04003-004 São Paulo BrazilTel: +55 (11) 32 63 08 26

ESTONIAAS SWETRAK Ehitusbetooni, Roodevälja küla, Sõmeru vald, 44207 Lääne-Viru maakondEstonia Tel: +372 6 71 2500 Email: swetrak@swetrak.ltwww.swetrak.lt

FINLANDPARMA RAIL OY Murrontie 330420, ForssaFinlandTel: +358 20 577 5500www.parma.fi

FRANCESATEBA Tour Europe - La Défense33, place des Corolles92400 Courbevoie FranceTel: +33 (0)1 46 53 24 00www.sateba.com

GERMANYDW SCHWELLEN GmbH Heerdterbuschstrasse 8 D- 41460 Neuss Germany Tel: +49 (0)2131 / 186-0 Email: info@dw-schellen.dewww.dw-schwellen.de

LITHUANIAUAB SWETRAK Gamyklų str. 1 LT-68108 MarijampoleLithuania Tel: +370 343 98712 Email: swetrak@swetrak.lt www.swetrak.lt

MOROCCOSATEBA MAROC Immeuble 1 - Zénith 1 - 1er Étage Sidi Maarouf - 20 000 Casablanca Morocco Tel: +212 522 78 78 68

CONSOLIS RAILWORLDWIDE

HIGH QUALITY AND GREAT STRENGTHThe MOFIX foundation is precast in a controlled factory environment, then delivered and installed with a specific concrete fixing process to guarantee high strength. Track poles do not have to be installed at the same time as MOFIX foundations.

A versatile solution, MOFIX is available in various dimensions:· 0.355 to 0.555 m in diameter· 1 to 6 m in length

KEY BENEFITSTried and tested by over two decades of use in Sweden and Norway, with more than 12,000 units installed in Norway since 1999.

· Quick and easy to install· Requires little space· Precast in controlled factory environment· Less concrete and water needed on site

MOFIX is currently commercialised by Spenncon Rail, CONSOLIS' Norwegian Rail subsidiary, under licence from its partner Steinar Mo.

IDEAL CHOICE FOR TIGHT CONSTRUCTION SCHEDULESVersatile and low impact In addition to foundations for catenary poles and catenary-cable anchoring, MOFIX can also be used for other infrastructure such as safety structures for level crossings, noise barriers and power supply poles.

MOFIX is well suited to all types of ground, whether it’s soil, sand, clay or rock, with minimum impact on the environment and surround-ing infrastructure. As the foundation is delivered ready to install, less parts, concrete and water are needed on site.