OOiill  &&  GGaass  SSuubbsseeaa  _____________________________________________________________________________________________________________________  

1   

 

IINNTTRROODDUUCCTTIIOONN   Matrikon Moore is one of the world leaders in providing global Industrial Automation and 

Optimization turnkey solutions to a diverse range of industries including:  Oil & Gas, 

Petrochemical, Food & Beverage, Metals, Mining, Power and Water & Sanitation. 

Headquartered at Midrand, South Africa, the company has regional offices to service the  local petrochemical and heavy industries and in 2010 the company established a subsidiary company ‐ Moore LLC ‐ based in Houston Texas.  Matrikon Moore has been  involved  in  the Offshore Oil gas  industry  for more  than 10  years. Commencing  with  the  provision  of  commissioning  services  for  newly  deployed  FPSOs,  the company progressed to full Topsides ICSS and PMS development and, since 2007, the provision of Subsea Control Systems.  The  Company  is  fully  ISO  9001  accredited  and  carries  IEC  Safety  Certifications  for  the development of software for Safety Instrumented Systems (SIS).   

TTAABBLLEE  ooff  CCOONNTTEENNTTSS    

INTRODUCTION ............................................................................................................................... 1 

TABLE of CONTENTS ........................................................................................................................ 1 

FPSO MONDO ................................................................................................................................. 2 

FPSO SAXI‐BATUQUE ....................................................................................................................... 3 

KIZOMBA C – GAS GATHERING ....................................................................................................... 4 

KIZOMBA SATELLITES ...................................................................................................................... 5 

FO DEVELOPMENT .......................................................................................................................... 6 

CONTACTS ....................................................................................................................................... 7 

 

     

OOiill  &&  GGaass  SSuubbsseeaa  _____________________________________________________________________________________________________________________  

2   

 

FFPPSSOO  MMOONNDDOO   

 Scope of Project Provision of a Subsea Master Control System on FPSO Mondo.  

Project Description Moore was responsible for provision of both the Topsides ICSS system and the Subsea MCS, which provided a unique opportunity to seamlessly integrate the two systems. 

The DCS system chosen was the Siemens PCS7 system.  

Hardware  comprised  Siemens  S7‐400‐H  (redundant) systems,  redundant  severs  and  two  client Workstations. Approximately  200  000  soft  I/O  was  used.  The  project required  a  fully  customized  system  of  the  Siemens  PCS7 which included custom HMI overview, symbols, faceplates and functions blocks.  

The  Siemens  system  linked  directly  to  the  Veto  Gray subsea system via industrial Ethernet onto the SMUs.  

 

The  subsea  layout  included  3 drill  centers, which  consisted of  a maximum of  14  production wells, 8 water alternating gas injection wells, 4 water injection well, 3 production manifolds and 2 water  alternating  gas manifolds.  The  Siemens  system was  also  required  to  interface  and control the Hydraulic Power Unit (HPU) supplied by Anzett. 

In addition to the main MCS, the project scope included for Training simulators to be installed on  the  FPSO,  and  two  land‐based  simulator  and  test  facilities  at  Vetco  Gray  and Matrikon Moore premises. 

 

   

Project Main Points 

Subsea MCS 

3 Drill Centres 

14 Production Wells 

8 WAG Wells 

4 Water injection Wells 

Location:   Angola Block 15 

Client:    Vetco Gray 

Main Client:   Esso Exploration 

Duration:   2007‐2008 

 

Project Highlights 

FPSO Mondo broke SBM uptime records with a 99.99% uptime in its first year.  

Mondo was the first vessel that Vetco Gray incorporated a Siemens DCS system into subsea installation 

First SBM vessel to use Siemens PCS7 for Topsides and Subsea installation. 

OOiill  &&  GGaass  SSuubbsseeaa  _____________________________________________________________________________________________________________________  

3   

 

FFPPSSOO  SSAAXXII‐‐BBAATTUUQQUUEE   Scope of Project Provision of a Subsea Master Control System on FPSO Saxi‐Batuque 

 Project Description In  similar  fashion  to Mondo, Moore  provided  both  the Topsides ICSS system and the Subsea MCS.  

The  DCS  consisted  of  Siemens  S7‐400‐H  (redundant) systems,  redundant  servers  and  clients.  Approximately 200  000  soft  I/O  was  used.  The  Siemens  system  linked directly to the Veto Gray SMUs via industrial Ethernet.  

The  project  required  a  fully  customized  system  of  the Siemens  PCS7  which  included  custom  HMI  overview, symbols, faceplates and functions blocks. 

The  Siemens  system  linked  directly  to  the  Veto  Gray subsea system via industrial Ethernet onto the SMUs.  

 

 

The  subsea  layout  included  4 drill  centers, which  consisted of  a maximum of  16  production wells, 8 water alternating gas injection wells, 6 water injection well, 4 production manifolds and 2 water alternating gas manifolds. Interfaces to the Anzett HPU system were provided. 

In addition to the main MCS, the project scope included for Training simulators to be installed on  the  FPSO,  and  two  land‐based  simulator  and  test  facilities  at  Vetco  Gray  and Matrikon Moore premises. 

 

   

Project Highlights 

 

Using experience gained from the Mondo project, Saxi‐Batuque was completed in record time and on time.  

Moore engineers were awarded accolades for their contributions during the offshore commissioning. 

Project Main Points 

Subsea MCS 

4 Drill Centres 

16 Production Wells 

8 WAG Wells 

6 Water injection Wells 

Location:   Angola Block 15 

Client:    Vetco Gray 

Main Client:   Esso Exploration 

Duration:   2007‐2009 

 

OOiill  &&  GGaass  SSuubbsseeaa  _____________________________________________________________________________________________________________________  

4   

 

KKIIZZOOMMBBAA  CC  ––  GGAASS  GGAATTHHEERRIINNGG   Scope of Project: Extensions to the Mondo and Saxi‐Batuque Subsea Control System to accommodate the additional Gas Gathering wells for Kizomba C.  

Project Description Utilizing  the  existing  Mondo  and  Saxi‐Batuque  systems, new  control modules where  incorporated  in  the  existing project. A new manifold  that  is controlled by  the Mondo MCS was  the merger point  for  the Gas  from  the other 3 vessels. The project  required  the engineering work  to be done on the online software, tested and then retro‐fitted to the live system. 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

Project Main Points 

Subsea MCS Extensions 

Location:   Angola Block 15 

Client:    Vetco Gray 

Main Client:   Esso Exploration 

Duration:   2008 ‐ 2009 

 

Project Highlights 

  

Moore received well earned praises for the completion of the project to tight deadlines. 

This project was used as a model towards Moore’s ISO accreditation. 

OOiill  &&  GGaass  SSuubbsseeaa  _____________________________________________________________________________________________________________________  

5   

 

KKIIZZOOMMBBAA  SSAATTEELLLLIITTEESS   Scope of Project: Provision of Subsea MCS for FPSOs Kizomba A and Kizomba B  

 

Project Description The  Kizomba  Satellites  project  included  some  unique features: 

Subsea connects both Kizomba A and Kizomba B FPSOs 

 Production may  be  routed  to  either  FPSO,  depending on the configuration of the Manifold Valves  

Control of individual Wells may be transferred between FPSOs, depending on Production requirements 

Software provision for a future additional manifold that may activated by a hard‐coded software switch. 

The subsea MCS comprised a Siemens PCS7 DCS, utilizing 14 S7‐400H redundant PLCs, 8 redundant Servers and multiple client (operator) stations. 

Moore provided all hardware and cubicles for the MCS 

Communications between the FPSOs  is achieved by redundant Fiber‐optic cables  for the two‐tier network, with a further backup facility provided by a dual microwave link between vessels. 

The initial phase of the project was devoted to developing a custom software library on behalf of  the  client  to  cater  for  some  of  the  unique  features  and  to  streamline  the  overall performance. The second portion was implementation, testing and eFAT.  

Commissioning on the FPSOs is currently ongoing, with 1st Oil anticipated for May 2012.  

 

   

Project Highlights 

  

The ability to route production to one of two FPSOs 

The ability to hand‐off control between the two FPSOs 

Multiple redundant communications links between FPSO 

Provision of a software “switch” to enable functionality for a future Drill Centre 

Project Main Points 

Subsea MCS 

5 Drill Centers 

18 Production Wells 

8 Manifolds 

11 Water injection Wells 

Location:   Angola Block 15 

Client:    Vetco Gray 

Main Client:   Esso Exploration 

Duration:  2011 to Present 

OOiill  &&  GGaass  SSuubbsseeaa  _____________________________________________________________________________________________________________________  

6   

 

FF‐‐OO  DDEEVVEELLOOPPMMEENNTT   

Scope of Project: Provision of a Subsea MCS for the F‐O Gas Field, tied back to the offshore FA platform.  

Project Description A subsea MCS is to be provided on the FA platform to control the F‐O gas field offshore of Mossel Bay, South Africa. The development consists of a North and South Tie‐In facility and 5 Gas Production Wells. 

The control system is to be implemented using a Siemens PCS‐7 DCS system comprising one S7‐400 redundant PLC, redundant Server and local client (operator) stations.  

Ancillary computer equipment and the MCS cubicles to house all equipment is included in the scope of supply.  

The Control System will interface to the land‐based DCS system, which will be able to take control of the wellfield via the MCS software. 

 

The project is currently ongoing.  

 

 

 

 

 

 

 

 

   

Project Main Points 

Subsea MCS 

2 Drill Centers 

5 Production Wells 

2 Manifolds 

Location:   F‐O Gas Field South Africa 

Client:    Vetco Gray 

Main Client:   PetroSA 

Duration:   2012 ‐ Present 

 

Project Highlights 

  

Provision for local control or remote control from the land‐based DCS system 

OOiill  &&  GGaass  SSuubbsseeaa  _____________________________________________________________________________________________________________________  

7   

 

CCOONNTTAACCTTSS   

Uwe Kurfurst – Director (Houston Office) ‐ uwe.kurfurst@moore‐us.com  

Richard Carlaw – Projects (South Office) – richard.carlaw@moore.co.za  

 

HEAD OFFICE MOORE PROCESS CONTROLS (PTY) LTD (Trading as MATRIKON / MOORE) 6/8 Monza Close, Kyalami Business Park, Midrand, Gauteng, South Africa Tel: +27 11 466‐1673/9 Fax: +27 11 466‐1618  

BRANCH OFFICE ‐ VANDERBILPARK 

MATRIKON / MOORE 

169 Louis Trichard Boulevard, 

SE 2, Vanderbijlpark, 1911, Gauteng, South Africa  

Tel: +27 16 932‐4421 Fax: +27 16 932‐4424  

BRANCH OFFICE ‐ SECUNDA 

MATRIKON / MOORE 

Hiz Place Building, C/O Mossie & Kiwiet Street 

Secunda, 2302 Mapumahlanga, South Africa  

Tel: +27 17 631‐2744  

USA OFFICE MOORE PROCESS CONTROLS (LLC) 9595 Six Pines Drive, The Woodlands, Texas, 77380, USA  Tel: +1 832 631 6349 Fax: +1 832 631 6001  

E mail: support@moore.co.za 

E mail: info@moore.co.za 

Web: www.moore.co.za 

 

top related