multi-sync repair training dpm diversified products mfg inc. click the mouse or use the down arrow...

Post on 29-Dec-2015

216 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Multi-Sync RepairTraining

DPMDiversified Products Mfg Inc.

Click the Mouse or use the Down Arrow to advance to the next point.

DPM Multi- Sync Training

Part 1: Support Chemicals Part 2: Prepare the SumpPart 3: Weld Multi-Sync in PlacePart 4: Fill the Multi-Sync Boot

Multi-Sync RepairDPM

Multi-Sync RepairDPMFill Multi-Sync with DBF II

• Loosen clamp at pipe.

Multi-Sync RepairDPMFill Multi-Sync with DBF II

• Loosen clamp at pipe. • Remove plugs at tube & set

aside.

Multi-Sync RepairDPMFill Multi-Sync with DBF II

• Loosen clamp at pipe. • Remove plugs at tube & set

aside. • Insert mixing nozzle and secure

with nut.

Multi-Sync RepairDPMFill Multi-Sync with DBF II

• Loosen clamp at pipe. • Remove plugs at tube & set

aside. • Insert mixing nozzle and secure

with nut. • Fill mixing tube and pump about

2 oz. into a container and set aside.

Multi-Sync RepairDPMFill Multi-Sync with DBF II

• Insert nozzle into Sleeve fill port

(Cont’d)

Multi-Sync RepairDPMFill Multi-Sync with DBF II

• Insert nozzle into Sleeve fill port• Fill with constant pressure

(Cont’d)

Multi-Sync RepairDPMFill Multi-Sync with DBF II

• Insert nozzle into Sleeve fill port• Fill with constant pressure• When DBF II oozes out at pipe,

tighten clamp

(Cont’d)

Multi-Sync RepairDPMFill Multi-Sync with DBF II

• Insert nozzle into Sleeve fill port• Fill with constant pressure• When DBF II oozes out at pipe,

tighten clamp • Fill until DBF II comes out of vent

(Cont’d)

Multi-Sync RepairDPMFill Multi-Sync with DBF II

• Insert nozzle into Sleeve fill port• Fill with constant pressure• When DBF II oozes out at pipe,

tighten clamp • Fill until DBF II comes out of vent• Insert plug into fill port

(Cont’d)

Multi-Sync RepairDPMFill Multi-Sync with DBF II

• Insert nozzle into Sleeve fill port• Fill with constant pressure• When DBF II oozes out at pipe,

tighten clamp • Fill until DBF II comes out of vent• Insert plug into fill port• Recommended - coat outer

surface with DBF II

(Cont’d)

Multi-Sync RepairDPM

Watch the Filling the Multi-Sync Entry video in Part 4A

Contact Diversified Products Mfg5523 Baggett Marysville Road

Oroville, CA 95965(530)-534-3966

www.dpm-llc.comsales@dpm-llc.com

Multi-Sync RepairDPM

See our website for more informationwww.dpm-llc.com

Multi-Sync RepairDPM

top related