Nigel Curry

Helices Consulting LtdRethinking Construction

and Centre for Construction Innovation

From Procedures to ProcessFrom Procedures to Process

• The Company had a ‘Management System’

This Comprised;

23 volumes of Manuals and System Procedures files

= 1.15m in length ?

• The Company recognised the need to change – or did it ?, but

• Rationalise of number of Manuals and consolidate the information contained within them

• Raise the awareness of staff to the Company requirements – the content of these system manuals

• 12 Documented Management Policies• 11 System Manuals• An unknown number of Proformae to record or

convey information• Company Intranet, huge spend on IT within the

Business• Coupled with a recruitment drive & therefore a

dilution of the company culture!

• SMM – Site Management Manual• TEN – Tendering Procedure• DES – Design / Design & Construct• PRO-1 – Material Procurement• PRO-3 – Subcontract Procurement• COM – Commercial Management & Reporting• CVC-1 – Cost Value Comparison (project)• CVC-2 – Cost Value Comparison (Business Unit)• CMH – Contract Management Handbook (Head Office

Management Systems)• PER – Personnel Procedures

• The Site Management Manual was a consolidation from those Company Procedures pertaining to the management and control of the Company’s projects.

• Some 40 number separate procedures just for carrying out business on a project site

• The Revised

• ‘Management System’

Now

= 0.65 m in length

We lost 0.5 of a meter

We must be Leaner !

• Now to educate the staff

• The Newly recruited, and • The Old Guard

• The ‘revised’ procedures were issued to all ‘Management’ to use and implement

• This would give a consistent approach to they way business was done

• Culture would improve• Margin would increase

BRILLIANT

NOBut Why

• No one had time to read it• It was still 0.65 meters long• They had concrete to pour• Subcontracts to award• Jobs to build

• “The manual has, generally, been laid out in a sequence where the sections occur in the logical progression of a project.”

Or Was IT?

Now look at the process’s

We started with:

a BIG sheet of ‘brown’ paper & a box of pens

We realised,

• Our processes were many• They were all intrinsically linked• They were unknown, by all but a few• They were not followed / implemented• Generally not measured• Therefore, were unlikely to be improved

• How can we improve this situation• Really disseminated the information contained within

the Procedures• Ensure we did what we said we would do for our

‘customers’

(internal & external)

PROCESS !

Process Protocol Collaboration Process Protocol Collaboration - Project Aims- Project Aims

• To increase the visibility of where the current procedures fit into the construction process.

• To allow construction project teams greater visibility of their involvement in the process.

• Enhance collaborative and concurrent

working styles as well as enhancing project information flows.

A0

Processes

InformationMaterialsInstructions

ProceduresStandardsGuidelinesRulesConditions

INPUTS

CONTROLS

People /FunctionsMachinesToolsComputing

MECHANISMS

InformationEquipment

PROCESSES

The IDEF building block[International DEFinition]

PROCESSES

Process Owner

Procedure

Action /Decision

Collate

Document

Process

Procedure

Process

Action /Decision

Collate

Documentation

Materials /InformationAction InoutsActionOutputsExternal Action

Prepared by

ND CurryApproved byProcess

Process Title ?

Date

Date

Date

date

Page 1 of 1Client

Contractor Ltd

Procedure

ExternalProcess

Schedule

MultipleDocument

Text TextTextWork FlowLoop

Text TextTextWork FlowLoop

Board of Management

Board ofManagement

STENCILSConnectorsNDC StencilTQM Diagram Shapes

Kipling's friends

 

- define what is to be done

 

- explain why it is done

 

- establish when it is to be done

 

- control how it is done

 

- show where it is done

 

- identify who is to do it

PROJECT START-UP

TenderHandover File

TenderProgramme

Prepared by

ND CurryApproved byProcess

Project Start-Up

Date

23 Feb 00

Date

Date

Page 1 of 1Client

Contractor Ltd

Levels ofAuthority

Start-UpChecklists /

MeetingRecord

MobilisationProgramme

SMM-9Material

Procurement

SMM-10SubcontractProcurement

SMM-7Method

Statements

SMM-8Inspect &Testing

SMM-6Planning,

Monitoring &Progress

Advice ofAppointment

AccountsDept

SMM-4Project

Quality Plans

SMM-11Site

ControlledDesign

SMM-12DrawingRegister

SMM-13Setting OutEquipment

SMM-14Plant &LabourMonitor

Award ofContract

Start-UpMeeting

Action /Decision

What

Procedure Flow

GeneralManager

Site/ProjectManager

QuantitySurveyor

SeniorEngineer

SiteEngineer

CommercialManager

Prepared by

Approved byProcess

Date

17/11/01

Date

17/11/01

Page 1 of 1Client

Contractor Ltd

Cross Functional Flow

GeneralManager

Site/ProjectManager

QuantitySurveyor

SeniorEngineer

SiteEngineer

CommercialManager

Prepared by

Approved byProcess

Project Start-Up

Date

17/11/01

Date

17/11/01

Page 1 of 1Client

Contractor Ltd

Award ofContract

Start-UpMeeting

Tender HandoverFile

TenderProgramme

Levels of Authority

Start-UpChecklists /

Meeting Record

MobilisationProgramme

SMM-9Material

Procurement

SMM-10SubcontractProcurement

SMM-7Method

StatementsSMM-8

Inspect &Testing

SMM-6Planning,

Monitoring &Progress

Advice ofAppointment

Accounts

SMM-4Project

Quality Plans SMM-11Site

ControlledDesign

SMM-12DrawingRegister

SMM-13Setting OutEquipmentSMM-14

Plant &LabourMonitor

Actions

SILOS

Processes need to Flow

TenderProgramme

Appx 3.7Levels ofAuthority

Appx 3.1Start-Up

Checklists

MobilisationProgramme

SMM-9Material

Procurement

SMM-10SubcontractProcurement

SMM-7Method

Statements

SMM-8Inspection &

Test

SMM-6Planning,

Monitoring &Progress

Appx 3.8Advice of

Appointment

AccountsDept

SMM-4ProjectQualityPlans

SMM-11Site

ControlledDesign

SMM-12Document

Control

SMM-13Setting OutEquipment

SMM-14Plant &LabourMonitor

Start-Up Meeting

Action /Decision

ClientInauguralMeeting

'Partnering Pact'

SMM-15Non

Conformance

ProjectProcedures

ProjectOrganisation

Chart

SMM-5Filing &Archives

NominatedSignatures of

Delivery Tickets

ScheduleInternal &

External Audits

SMM-16Auditing

SMM-17Petty Cash

Appx. 6.25

Risk Analysis

ClientRepresentative

Authority/Powers

ALLREMAININGSMM & CNLProcedures

Minutes ofMeeting

Procedure ProcessDocument Action /

DecisionExternalProcess

CollateInputs / Materials /

Outputs

LEGEND

ExternalAction

Schedule

Prepared by

ND Curry

Andrew Partridge - QAMApproved byProcess

SMM-3 : Contract Start-Up

Date

21 Jul 00

Date

21/7/00

Page 1 of 1Client

Contractor Ltd

Issued For Use

Rev B

Tender Process

TEN 17.1Tender Handover

File

Award ofContract

Contract AwardSheet

COM 16.1

Authorised byOps Director[commit to

expenditure]

Tender HandoverMeeting

Procurement Dept.

Procurement Dept.

QA Dept.

Prepared by

ND CurryApproved by

Andrew Partridge - QAMProcess

SMM-9 : Material Procurement

Date

21 Jul 00

Date

21/7/00

Page 1 of 1Client

Contractor Ltd

PrepareSummary of

ContractMaterials

Prepare DetailedRequisition

PRO Appx. 2.16Material

Requisition

Review &Authorise

H.O.Procurement

Procedure

Issue Enquiries

PRO Appx. 2.7

QuotationAnalysis Sheet

Review &Approve

ReturnAuthorised

Analysis Sheetto HO

Purchasing

Prepare &Issue

PurchaseOrdersincl QA

Questionnaire

Update Material /Procurement

Schedule

Call ForwardMaterials as

required

PRO Appx. 2.40Call Forward

Request

Schedule of CallForwardRequests

Update ScheduleSupply Materials

/ Goods

Delivery Ticket& Certification

Book Goods asReceived

Forward toAccounts

Dept.

Carry outMaterial

Reconciliation

PRO Appx. 2.53Reconciliation

Sheets

Suppliers'Process

Update VendorListing

Updated VendorListing

On Completionof SupplyComplete

PerformanceReport

Project Start-Up

Issue toPurchasing Dept

No

Yes

PRO Appx. 2.1Return QA

Questionnaire toCNL

PRO Appx. 2.2Performance

Report

Appx. 3.7Level of

Authority

Procedure ProcessDocument Action /

DecisionExternalProcess

CollateInputs / Materials /

Outputs

LEGEND

ExternalAction

Schedule

Appx. 6.11

Summary ofContractMaterials

ReturnQuotes

Use Materials inthe Works

PRO Appx. 2.46

Complete GSRRSheet - Weekly

Issued For Use

Rev B

NationalAgreement- Suppliers

"Pre Tender Deal" onMaterial Supply

ProjectManagement Plan

NominatedSignatories for

Del Tickets

Monthly Report

Return to

CNL QAM

Copy Records

Copy Site

PRO Appx. 2.20Original toSupplier

& PRO Appx. 2.1

Process Flow

CONCRETEINSPECTION

RECORD

Procedure ProcessDocument Action /

DecisionExternalProcess

CollateInputs / Materials /

Outputs

LEGEND

ExternalAction

Schedule

Prepared by

ND CURRYApproved byProcess

POURING CONCRETE

Date

17 / 8 / 00

Date

date

Page 1 of 1Client

Contractor Ltd

WEEKLYPROGRAMME /

CONCRETEREQUIREMENTS

MAKE POURREADY

ORALNOTIFICATION

TO CLIENT

CNLINSPECT POUR

CALL FORWARDCONCRETE

CHECKDELIVERY &

REVIEW TICKET

CUBE SAMPLES&

TEST SLUMP

MARK UP &DATE AS-BUILT

DRAWINGS

REGISTERRESULTS

REVIEW &ANALYSERESULTS

(Mean & Stnd Dev)

2-WEEKLYPROGRAMME

CLIENTACTION ?

CALL FORWARDREQUEST

PRO Appx 2.40

I&T Status

AS-BUILTRECORDS

CUBE TESTCERTIFICATE

CUBE RESULTSREGISTER

STATISTICALANALYSIS

(Mean & Stnd Dev)

No RFI / IRreq'd

DEL TICKET &MIX DETAILS

ITP Concrete Prepared - Approval ?Suppliers - Aproval ?Mix Designs - Approval ?Trial Mixes & Results - Approval ?Trail Pannels Constructed - Approval ?Fmwk/Falsewk Design - Approval ?Methods Agreed ?

MethodStatement

Procedure forPlacing,

Compacting,Finishing &

Curing

CHECKSS.O.FormationBlindingConstruction JtsRebarFmwkCoverBuilders wk, etcEmbedmentsEncast ItemsCleanliness& ?

SMM-9NominatedSignatories

SlumpDensityAir ContentCube Samples

POST POURINSPECTION &

SURVEY

CONCRETEINSPECTION

RECORD

CRUSHTEST

CUBES

MethodStatement

Inspection& Test Plan

POURCONCRETE

Inspection& Test Plan

SMM-9GSRReports

CONCRETETEST RECORD

(Del & Sampling)

MATERIALRECONCILIATION

Inspection& Test Plan

Good PracticeGuidance Note

PRE POUR

POST POUR

CC HH RR II SS TT II AA NN II && NN II EE LL SS EE NN

F A C S IM IL E

CCHHRRIISSTTIIAANNII && NNIIEELLSSEENN LLTTDDOOrriioonn HHoouussee,, AAtthheennaa DDrriivvee,, TTaacchhbbrrooookk PPaarrkk,, LLeeaammiinnggttoonn SSppaa,, WWaarrwwiicckksshhiirree CCVV3344 66RRQQ

TTeelleepphhoonnee:: ((0011992266)) 888866666666 FFaaccssiimmiillee:: ((0011992266)) 888866665566

RReeggiisstteerreedd iinn EEnnggllaanndd NNoo.. 226666006688

T o : R e f . :

C o : D a te :

F ro m : F a x N o :

c c : P a g e s := = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =

C A L L F O R W A R D F R O M P U R C H A S E O R D E R

C o n tra c t N o . :-S e c tio n :-

P .O . R e f . N o . : .. .. .. .. .. .. ... .. .. .. .. .. .. / .. .. .. .. .. .. .. ... .. .. .. ..Q u a n tity U n it D e s c rip tio n U n it C o s t

C o m m e n ts

D a te / T im e re q u ire d : .. .. .. .. .. .. .. .. ... .. .. .. .. .. .. ... .. .. .. .. ..

D e liv e re d to : .. .. .. .. .. .. .. .. ... .. .. .. .. .. .. ... .. .. .. .. ..

R e q u e s te d b y : .. .. .. .. .. .. .. .. ... .. .. .. .. .. .. ... .. .. .. .. ..

P R O 0 2 -4 0 - r 2 5 /8 /9 9

C H R IS T IA N I & N IE LS E N

T W O W E E K L Y P R O G R A M M E

C o n tra ct_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ C o n tra ct N o . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

C u rre n t W e e k W e e k N u m b e r : W e e k N u m b e r :AC T IV IT Y Q u a n t O u tp u t R e so u rce s F ri S a t S u n M o n T u e W e d T h u F ri S a t S u n M o n T u e W e d T h u F ri

INSPECTION AND TEST PLAN NO. GENERAL CONCRETE - Railtrack

REVISION 0 SHEET of

INSPECTION VERIFYINGDOCUMENT

INSPECTION CODESAND AUTHORITY

REMARKS

ItemNo.

Activity ControllingSpecification By Whom Freq Description

Submitto

Client

S/C CNL EngRep

1.1 Concrete Supplierincluding Back-Up supply

Spec cl. 105.1 SM Once NotificationLetter

Y

1.2 Concrete Mix DesignApproval

Spec cl. 1703.4 +1704.6(viii)(ix)+ 1705.2

SM Once SubmittedDetails

Y

1.3 Trial Mixes Spec cl, 80.016 SM Once Notification Y1.4 Mix Informtion Spec cl, 80.018 SM Once Mix

information &Test Results

Y

1.5 Trial Panels Spec cl 80.028& 80.030

SM Once Trial PanelAcceptance

2.1 Concrete Supply Spec cl. 80.018& 80.021

Supplier QSRMC &Material TestRecords (byUKASlaboratory)

Y

2.2 Reinforcement Supply Spec cl. 80.043 Supplier CARES Certfor each typeof rebar used

Y

2.3 Method of Working Spec cl. 130.004SMM-7

SM Prior to start M/S Y

2.4 Inspecting the Works Spec cl. 130.006SMM-8

SMM Prior to Start this ITP Y

3. Formwork Design DES& SMM-11

Temp WksCo-ordinator

Once FormworkLayout Drgw

4. Setting Out Spec cl. 10.040 Eng 100% PCIR - Issue RFI(inspection)

5. Formation Approval Spec cl. 51.015 EngEng Rep

Ea. Pour PCIR Issue RFI(inspection)

6. Blinding CNLGPGN-004

EngEng Rep

Ea. Pour PCIR - Issue RFI(inspection)

7 Fixing of Re-bar Spec cl. 80.045& 80.046& 80.047

Foreman/Engineer

Ea. Pour PCIR Issue RFI(inspection)

CCHHRRIISSTTIIAANNII &&NNIIEELLSSEENN LLttdd

DDooccuummeenntt TTiittllee::

CCOONNCCRREETTEE PPOOUURR RREECCOORRDD

DDoocc..RReeff..NNoo::

CCPPRR//

SShheeeett ooff

PPrroojjeecctt TTiittllee:: NNoo..::

11 PPOOUURR LLOOCCAATTIIOONN && DDEESSCCRRIIPPTTIIOONN

22 RREEFFEERREENNCCEE DDRRAAWWIINNGGSS

GGAA DDrrwwgg..//RReevv..::RRCC DDrrwwgg..//RReevv..::

TTeemmpp..WWkkss..DDrrwwgg..//RReevv..::

33 DDEETTAAIILLSS

PPllaannnneedd SSttaarrtt ((DDaattee//TTiimmee)):: PPllaacciinngg MMeetthhoodd::

CCoonnccrreettee CCllaassss:: PPllaacciinngg RRaattee::

VVoolluummee ((mm33)):: TTaarrggeett SSlluummpp ((mmmm)):: CCuurriinngg MMeetthhoodd::

44 PPRREE--PPOOUURR CCHHEECCKKSS (( ** -- EEnntteerr NNAA ffoorr NNoonn AApppplliiccaabbllee iitteemmss,, **** AAss rreeqquuiirreedd bbyy tthhee CCoonnttrraacctt))

IItteemm CCNNLLIInniittiiaallss && DDaattee **

CClliieenntt''ssIInniittiiaallss && DDaattee ****

RReemmaarrkkss((PPrroobblleemmss oorr DDeellaayyss))

SSeettttiinngg OOuutt

RReeiinnffoorrcceemmeenntt

FFoorrmmwwoorrkk && TTiieess

FFaallsseewwoorrkk

JJooiinntt DDeettaaiillss ((IInnccll.. WWaatteerr bbaarrss))

CClleeaannlliinneessss

CCaasstt iinn IItteemmssCCiivviill

MM && EE

OOtthheerr ((SSttaattee))::

55 PPOOUURR RREECCOORRDD

SSttaarrtteedd:: FFiinniisshheedd:: VVooll.. PPllaacceedd::

WWoorrkkaabbiilliittyy RReessuullttss SSaattiissffaaccttoorryy:: CCuubbeess TTaakkeenn ((NNoo..))::

WWeeaatthheerr CCoonnddiittiioonnss:: CCuurriinngg MMeetthhoodd::

AAnnyy PPrroobblleemmss//ddeellaayyss::

66 PPOOSSTT PPOOUURR CCHHEECCKKSS

FFoorrmmwwoorrkk ssttrriippppiinngg aacchhiieevveedd ffoorr SSttoopp EEnnddss // SSiiddeess // SSooffffiitt::((iinn DDaayyss))

SSuurrffaaccee ffiinniisshh ssaattiissffaaccttoorryy

CCuurriinngg//PPrrootteeccttiioonn

CCaasstt iinn iitteemmss

CCuubbee rreessuullttss ssaattiissffaaccttoorryy::

AAnnyy rreeqquuiirreedd rreemmeeddiiaall wwoorrkk::

CCoonnccrreettee ppoouurr ccoommpplleetteedd ccoorrrreeccttllyy

IInntteerrnnaall DDiissttrriibbuuttiioonn CCPPRR FFiillee QQAAPP--88bb

CCHHRRIISSTTIIAANNII &&NNIIEELLSSEENN LLttdd

DDooccuummeenntt TTiittllee::

CCOONNCCRREETTEE TTEESSTT RREECCOORRDD

DDoocc..RReeff..NNoo..::

CCTTRR//

SShheeeett ooffPPrroojjeecctt TTiittllee :: NNoo..::

SSttrruuccttuurree::

SSuupppplliieerr::SSppeecciiffiieedd SSlluummpp::

EElleemmeenntt::PPoouurr NNoo..::CCoonnccrreettee GGrraaddee::TToolleerraannccee::

DDeelliivveerryy TTiicckkeett CCoonnccrreettee DDeelliivveerryy SSaammpplliinngg DDeettaaiillss CCuubbee RReessuullttss RReemmaarrkkss

NNoo.. QQuuaannttiittyy AArrrriivvaallttiimmee

SSttaarrtt ttiimmee FFiinniisshh ttiimmee SSlluummpptteesstteedd

TTeemmpp CCoonnccrreettee ccuubbeeSSaammppllee rreeff NNoo

TTeesstt aaggee((ddaayyss))

SSttrreennggtthhNN//mmmm22

SSiiggnneedd:: PPoossiittiioonn:: DDaattee::

IInntteerrnnaall DDiissttrriibbuuttiioonn CCRR FFiillee QQAAPP--88cc

S A M P L EN U M B E R

D A T EC A S T

R E S U L T S (N /m m 2) M E A N O F 4 .

2 8 D a yR e s u lt

R E S U L T(N /m m 2)

7 D a y 2 8D a y

2 8D a y

10 20 30 40 50

C H R IS T IA N I & N IE L S E N L T DG O O D S & S E R V IC E S R E C E IV E D R E P O R T

C O N T R A C T N A M E : C O N T R A C T N O . : G S R R S h e e t N o . : ___________ ___W E E K E N D IN G : ____ ______

M ateria ls C o s tin g F o r H ea d O f f ice U se

D e liv e ry C & N S upp lie r D esc rip tion S upp lie r 's Q uan tity C & N

D a te P .O . N o . D /N N o . D e liv e red R a tes A m o un t C ost C ode Inv o ice N o . A m o un t

P repa red by : A p p rov ed by : R em arks:

_ ___________ ________ __________ ___________ ___( S ite A gen t / P ro jec t M anage r )

P R O -2 (21 ) (p rov .) 12 .12 .94

(P R O J E C T T IT L E )

(M E T H O D S T A T E M E N T )

(M E T H O D S T A T E M E N T )

D IS T R IB U T IO N

R e v N o . D a te D e s c r ip t io n

0

1

2

D o c u m e n t N o :

R e v is io n :

D a te :

P re p a re d ( IN IT IA L S & S IG N A T U R E )

A p p ro v e d : ( )T ic k a s a p p ro p r ia te

C H R IS T IA N I & N IE L S E N (D O C U M E N T N O . & R E V .)

S IT E M A N A G E M E N T M A N U A L D A T E : 0 1 /1 0 /9 8 A P P E N D IX 7 .3

A M E N D M E N T C O N T R O L

CONCRETEINSPECTION

RECORD

Procedure ProcessDocument Action /

DecisionExternalProcess

CollateInputs / Materials /

Outputs

LEGEND

ExternalAction

Schedule

Prepared by

ND CURRYApproved byProcess

POURING CONCRETE

Date

17 / 8 / 00

Date

date

Page 1 of 1Client

SUNDERLAND DIRECT - Christiani & Nielsen Ltd

WEEKLYPROGRAMME /

CONCRETEREQUIREMENTS

MAKE POURREADY

ORALNOTIFICATION

TO CLIENT

CNLINSPECT POUR

CALL FORWARDCONCRETE

CHECKDELIVERY &

REVIEW TICKET

CUBE SAMPLES&

TEST SLUMP

MARK UP &DATE AS-BUILT

DRAWINGS

REGISTERRESULTS

REVIEW &ANALYSERESULTS

(Mean & Stnd Dev)

2-WEEKLYPROGRAMME

CLIENTACTION ?

CALL FORWARDREQUEST

PRO Appx 2.40

I&T Status

AS-BUILTRECORDS

CUBE TESTCERTIFICATE

CUBE RESULTSREGISTER

STATISTICALANALYSIS

(Mean & Stnd Dev)

No RFI / IRreq'd

DEL TICKET &MIX DETAILS

ITP Concrete Prepared - Approval ?Suppliers - Aproval ?Mix Designs - Approval ?Trial Mixes & Results - Approval ?Trail Pannels Constructed - Approval ?Fmwk/Falsewk Design - Approval ?Methods Agreed ?

MethodStatement

Procedure forPlacing,

Compacting,Finishing &

Curing

CHECKSS.O.FormationBlindingConstruction JtsRebarFmwkCoverBuilders wk, etcEmbedmentsEncast ItemsCleanliness& ?

SMM-9NominatedSignatories

SlumpDensityAir ContentCube Samples

POST POURINSPECTION &

SURVEY

CONCRETEINSPECTION

RECORD

CRUSHTEST

CUBES

MethodStatement

Inspection& Test Plan

POURCONCRETE

Inspection& Test Plan

SMM-9GSRReports

CONCRETETEST RECORD

(Del & Sampling)

MATERIALRECONCILIATION

Inspection& Test Plan

Good PracticeGuidance Note

PRE POUR

POST POUR

STAGEINSTALLATION

RECORD SHEET

DRAINAGEINSPECTION &

RECORD/CHECKLIST

CLIENTACTION ?

FINALINSPECTION &ACCEPTANCE

OF ea.DRAINRUN

DRAINAGEINSPECTION &

RECORD/CHECKLIST

Procedure ProcessDocument Action /

DecisionExternalProcess

CollateInputs / Materials /

Outputs

LEGEND

ExternalAction

Schedule

Prepared by

ND CurryApproved byProcess

Duct, Drainage & Pipe installation

Date

17 / 8 / 00

Date

date

Page 1 of 1Client

Contractor Ltd

WEEKLYPROGRAMMEOF ACTIVITIES

INSTALLDUCT /

DRAINAGE /PIPES

ORALNOTIFICATION

TO CLIENT

CNLVISUALLYINSPECT

PIPEWORK etc.

BACKFILLTRENCH

MARK UP &DATE AS-BUILT

DRAWINGS

2-WEEKLYPROGRAMME

CLIENTACTION ?

Marked Schedule

I&T Status

AS-BUILTRECORDS

No RFI / IRreq'd

ITP Drainage/Ducts Prepared - Approval ?Type of Tests Required ?ALL Suppliers / Materials - Approval ?Methods Agreed ?Setting out completedExisting Services ChartedM/H tie-in inverts surveyed

MethodStatement

CHECKSS.O.FormationBedding / SurroundPipe dia & TypeJoint AlignmentGeotextilesConnection toExisting SystemAir/Water Test on pipe

MethodStatement

Inspection& Test Plan

Inspection& Test Plan

MATERIALRECONCILIATION

Good PracticeGuidance Note

AIR/WATERTEST

(Prior to B/F)

PREPAREDRAINAGE

INFORMATIONSHEET/SKETCH

DRAINAGE & M/H INFORMATION

MethodStatement

FOREMANREVIEW

OPERATIONS

AIR/WATERTEST

STAGEINSTALLATION

RECORD SHEET

DRAINAGEINSPECTION &

RECORD/CHECKLIST

DRAINAGEINSPECTION &

RECORD/CHECKLIST

STAGEINSTALLATION

RECORD SHEET

PREPAREMATERIAL

RECONCILIAT'N

CONSTRUCTM/H's;

CHAMBERS;etc.

MethodStatement

STAGEINSTALLATION

RECORD SHEET

CHECKSS.O.ExcavationFormationBase PourChamber ConstructionConcrete SurroundBenchingCover & FrameMisc MetalworkFinal Location

CONCRETEINSPECTION

SHEET

CNLINSPECTION OFM/H & PIPERUN M/H INSPECTION

RECORD /CHECKLIST

NotifyClient

STAGE INSTALLATIONRECORD SHEET

DRAINAGEINSPECTION &

RECORD/CHECKLISTCLIENT

ACTION ?

FINAL INSPECTION &ACCEPTANCE OF ea.

DRAINRUN

Procedure ProcessDocument

Action / DecisionExternalProcess

CollateInputs / Materials / Outputs

LEGEND

ExternalAction

Schedule

Prepared by

ND CurryApproved byProcess

Duct, Drainage & Pipe installation

Date

17 / 8 / 00

Date

date

Page 1 of 1Client

SUNDERLAND DIRECT - Christiani & Nielsen Ltd

WEEKLY PROGRAMMEOF ACTIVITIES

INSTALLDUCT / DRAINAGE

/ PIPES

ORAL NOTIFICATIONTO CLIENT

CNLVISUALLY

INSPECT PIPEWORKetc.

BACKFILLTRENCH

MARK UP & DATE AS-BUILT DRAWINGS

2-WEEKLYPROGRAMME

CLIENTACTION ?

Marked Schedule

I&T Status

AS-BUILT RECORDS

No RFI / IRreq'd

ITP Drainage/Ducts Prepared - Approval ?Type of Tests Required ?ALL Suppliers / Materials - Approval ?Methods Agreed ?Setting out completedExisting Services ChartedM/H tie-in inverts surveyed

Method Statement

CHECKSS.O.FormationBedding / SurroundPipe dia & TypeJoint AlignmentGeotextilesConnection to Existing SystemAir/Water Test on pipe

Method Statement

Inspection& Test Plan

Inspection& Test Plan

MATERIALRECONCILIATION

Good PracticeGuidance Note

AIR/WATER TEST(Prior to B/F)

PREPARE DRAINAGEINFORMATION SHEET/

SKETCH

DRAINAGE & M/HINFORMATION

Method Statement

FOREMAN REVIEWOPERATIONS

AIR/WATER TEST

STAGE INSTALLATIONRECORD SHEET

DRAINAGEINSPECTION &

RECORD/CHECKLIST

DRAINAGEINSPECTION &

RECORD/CHECKLIST

STAGE INSTALLATIONRECORD SHEET

PREPARE MATERIALRECONCILIAT'N

CONSTRUCT M/H's;CHAMBERS; etc.

Method Statement

STAGE INSTALLATIONRECORD SHEET

CHECKSS.O.ExcavationFormationBase PourChamber ConstructionConcrete SurroundBenchingCover & FrameMisc MetalworkFinal Location

CONCRETEINSPECTION SHEET

CNL INSPECTION OFM/H & PIPERUN

NotifyClient

M/H INSPECTIONRECORD / CHECKLIST

DRAINAGEINSPECTION &

RECORD/CHECKLIST

C H R IS T IA N I & N IE LS E N

T W O W E E K L Y P R O G R A M M E

C o n tra c t_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ C o n tra c t N o . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

C u rre n t W e e k W e e k N u m b e r : W e e k N u m b e r :AC T IV IT Y Q u a n t O u tp u t R e so u rce s F ri S a t S u n M o n T u e W e d T h u F ri S a t S u n M o n T u e W e d T h u F ri

INSPECTION CHECKLIST : DRAINAGE - MANHOLES

CONTRACT : .................................................. No. : .............................

MANHOLE DATA Cover Level = m O.D.

MH No. : ...............................

MH Diameter : MH Lid Level = m O.D.

MH Rings required

No. @ mm

No. @ mm

No. @ mm

Invert Level = m O.D.

a) Show incoming pipelines for orientationb) Show orientation and sequence of step irons

Reference Drawing : .................................. Rev. : ............

Details required :

Manhole Details Prepared by :

Works Checked by :

Wastage Analysed by :

MATERIALS Required / Allowance Used Wastage % Waste Quant. Unit Cost

MH Rings

SURROUND

OTHER

Checklist Application 1) Instruction High Medium Low

2) Quality Control High Medium Low

3) Wastage High Medium Low

09/09/1998 CHRISTIANI & NIELSEN Ltd

INSPECTION CHECKLIST : DRAINAGE - PIPE RUN

CONTRACT : .................................................. No. : .............................

PIPELINE DATA

From MH/CP/HW No. : ............................... To MH/CP/HW No. : ...............................

DETAIL OF PIPE, BED AND SURROUND :-

Length of Pipe Run : ............................... m

Type of Pipe (i.e. Clay / Concrete) : ...............

Dia : ............................ mm

Pipe Surround Materials :-

LONGITUDINAL SECTION

Invert Level = .................... Invert Level = ....................

Reference Drawing : ........................................................ Rev. : ............

Drainage Details Prepared by :

Works Checked by :

Wastage Analysed by :

MATERIALS Required / Allowance Used Wastage %Waste Quant. Unit Cost

PIPES

SURROUND

OTHER

Checklist Application 1) Instruction High Medium Low

2) Quality Control High Medium Low

3) Wastage High Medium Low

09/09/1998 CHRISTIANI & NIELSEN Ltd

CHRISTIANI &NIELSEN Ltd

Document Title:

MANHOLE INSPECTION& TEST RECORD

Doc.Ref.No:

DIT/

Sheet of

Project Title : SUNDERLAND DIRECT No: 197259

Location: Drain Type:

Drawing No.: Standard Detail Ref.:

RReeff NNooss..:: TTyyppee//DDiiaa:: SSttnndd..DDeettaaiill RReeff..::

MMAANNHHOOLLEESS For CNLInitials/date *

For CLIENTInitials/date **

LLiinnee && lleevveell

EExxccaavvaattiioonn // FFoorrmmaattiioonn

CCoonnccrreettee BBaassee PPoouurr

RRiinnggss//BBrriicckkwwoorrkk

BBeenncchhiinngg

SStteepp IIrroonnss//LLaaddddeerr

SSuurrrroouunndd && BBaacckkffiillll

CCoovveerr TTyyppee && LLeevveell

FFiinnaall IInnssppeeccttiioonn

CCoommmmeennttss // NNootteess::

As-Built Records & Survey Completed

Comments / Notes:

* Complete all boxes with initials & Date, NC - Not Checked or NA - Not Applicable

** As required by the Contract

Internal Distribution I&T Records File QAP-8e1

CHRISTIANI &NIELSEN Ltd

Document Title:

DRAINAGE INSPECTION& TEST RECORD

Doc.Ref.No:

DIT/

Sheet of

Project Title : SUNDERLAND DIRECT No: 197259

Location: Drain Type:

Drawing No.: Standard Detail Ref.:

Pipe Dia.: Type: Class:

Bedding Type: Backfill Type:

Drain Run: From Manhole/Chainage: To Manhole/Chainage:

PIPEWORK For CNLInitials/date *

For CLIENTInitials/date **

Line & Level

Formation

Type & Dia

Bed, Surround & Backfill

Geotextiles

Joint Alignment

Profile check Mandrel, Visual, Other *

Connection to Existing Pipework / Man Hole

Air Test(100mm manometer over 5 mins with ne 25mm loss inhead)Water Test(min 1.5m head water& 2 hours absorption - calc literslost over 30mins)Final Flushing

Final Visual Inspection

Video Survey

As-Built Records & Survey Completed

Comments / Notes:

* Complete all boxes with initials & Date, NC - Not Checked or NA - Not Applicable

** As required by the Contract

Internal Distribution I&T Records File QAP-8e1

CCHHRRIISSTTIIAANNII &&NNIIEELLSSEENN LLttdd SSTTAAGGEE IINNSSTTAALLLLAATTIIOONN // IINNSSPPEECCTTIIOONN RREECCOORRDD

DDoocc.. RReeff..NNoo..::____________________________________________

PPRROOJJEECCTT TTIITTLLEE:: AAccttiivviittyy::

IInnssttaallllaattiioonn oorr IInnssppeeccttiioonn SSttaaggee

((IIddeennttiiffyy))

SSeeccttiioonnss ooff WWoorrkk

11

22

33

44

55

66

77

88

99

1100

RReeccoorrdd IInnssppeeccttiioonn RReeppoorrtt NNuummbbeerrss oorr SSiiggnnaattuurree aanndd ddaattee ffoorr ssttaaggeess ccoommpplleetteedd QQAAPP--88gg

The next stageThe next stage

• To examine Company operating procedures.

• Develop Production Management Sub Process Map using Process Protocol Research Methodology.

• Map Company procedures to Production Management processes of the PP2.

• Validate and Test iteratively through site visits, staff interviews and an Audit style checklist.

• Finalise Procedure to Process Mapping.

• What happened next ?

TOO LATE

butDon’t let it be

too late forYOU

Nigel CurryNigel Curry

Helices Consulting LtdHelices Consulting Ltd

Rethinking ConstructionRethinking Construction

Centre for Construction InnovationCentre for Construction Innovation