njedge portal proof of concept (poc) update

Post on 19-Jan-2016

48 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

NJEDge.net Portal Proof Of Concept (POC) Update. Joe Walter Enterprise Solutions Center (ESC) Verizon ESG June 11, 2003. NJEDge – Proof of Concept Update. AGENDA Why Proof Of Concept (POC)? Enterprise Solution Center (ESC) Role Test Update Q & A. Why POC?. Network Design Validation - PowerPoint PPT Presentation

TRANSCRIPT

1

NJEDge.net PortalNJEDge.net Portal Proof Of Concept (POC) Update Proof Of Concept (POC) Update

Joe Walter

Enterprise Solutions Center (ESC)

Verizon ESG

June 11, 2003

2

NJEDge – Proof of Concept UpdateNJEDge – Proof of Concept Update

AGENDA

• Why Proof Of Concept (POC)?

• Enterprise Solution Center (ESC) Role

• Test Update

• Q & A

3

Why POC?Why POC?

• Network Design Validation

• Vendor Interoperability

• Service Provider Interoperability

• Portal Implementation Strategy Development

4

The Challenge The Challenge

• Take the Idea to Reality

• Complex Network Design in a Multi-vendor Environment

• Emerging IP Video Technology– H.323 standard (V1 - V4, with

options)

– Real Time Applications on a Non-Deterministic Data Network

5

ESC InvolvementESC Involvement

PEOPLE PROCESS

TECHNOLOGY

ISO 9001CERTIFIED

ENGINEERS

LAB FACILITY

• Complex Solutions

• Network Integration Focused

6

Enterprise Solutions CenterEnterprise Solutions Center

NETWORK ARCHITECTURE

NETWORK DESIGN

PROOF OF CONCEPT TESTING

KNOWLEDGE TRANSFER

Solving Enterprise Business Problems with Technology

7

ESC CharterESC Charter Develop Integrated SolutionsDevelop Integrated Solutions

– Research new products and technologies

– Conduct product assessments & evaluations

– Conduct proof-of-concept integration testing

– Provide skills transfer Design Complex, Large-scale NetworksDesign Complex, Large-scale Networks

– Consult on design portion of strategic engagements

– Provide technical leadership and design review Support Laboratory ServicesSupport Laboratory Services

– Support customer trials

– Provide customized testing and evaluations

– Provide ongoing development of technical staff

8

TE

ST

T

OO

LS

TRANSPORT

SONET DWDM

CORE NETWORK SERVICES

IP ATM Frame Relay

MULTI-SERVICE ACCESS

Wireless T1/T3 OC-N Ethernet

APPLICATIONS

IP Video IP Telephony

CO

MP

UT

ING

EN

VIR

ON

ME

NT

ESC Lab FacilityESC Lab Facility

9

NJEDge.net DesignNJEDge.net Design

10

ANJ/NJEDge Interop Test BedANJ/NJEDge Interop Test Bed

Internet

IP VPN/ATMCloud

Polycom FX

Cisco 2651Gatekeeper

DelawareATM

DE-7204-GK

Newark-GK

DEL-3660/GKHigh School

DEL_2651

Polycom FX

ANJ_FX

Internet(ISP)

Data

Data

NEWARK LATA

NJ ATM Core

DELAWARE LATA

.1

Newark-WAN

NJEDge Portal

ANJ Polycom MCU

ANJ Portal

NJEDge-GK1

NJEDge-GK2

CTM Servers Polycom VS_4000

HSRP

Cat_5505 NJEDge Polycom MCU

Cisco 7200WAN

NJEDgeRemote Site

Cascade MCM GK

CAT 6509/MSFC

ISDN

11

Proof Of Concept Test OutlineProof Of Concept Test Outline

• FVC Click To Meet Premier (CTMP) Validation

• CTM/H.323 with Security - Firewall • IP Addressing scheme (Private vs. Public)• Dialing Plan (Private vs. Public)• Quality of Service (Marked vs. Unmarked)• Inter-Portal Gatekeeper Interoperability• Vendor Interoperability• Remote to Portal - IP VPN Connectivity • Trouble Shooting Procedure for NJEDge

network

12

Current Status in Test BedCurrent Status in Test Bed

• Test Plan developed • IP Addressing and Dial Plan validated• Inter-Portal design and connectivity confirmed• Gatekeeper Redundancy configured and

tested• FVC Click-to-Meet scheduling application

staged and verified between devices• Cisco IOS software validated• Tandberg Endpoint Interoperability tested

13

FVC Screen CaptureFVC Screen Capture

14

Screen Shot of Conference SetupScreen Shot of Conference Setup

15

Next StepsNext Steps

• Security Enhancement via Cisco PIX Firewall

• Quality Of Service (QoS) Validation

• Deployment and Pilot testing in early July

16

Q & AQ & A

THANK YOU!

top related