njedge portal proof of concept (poc) update

16
1 NJEDge.net Portal NJEDge.net Portal Proof Of Concept (POC) Update Proof Of Concept (POC) Update Joe Walter Enterprise Solutions Center (ESC) Verizon ESG June 11, 2003

Upload: leane

Post on 19-Jan-2016

48 views

Category:

Documents


0 download

DESCRIPTION

NJEDge.net Portal Proof Of Concept (POC) Update. Joe Walter Enterprise Solutions Center (ESC) Verizon ESG June 11, 2003. NJEDge – Proof of Concept Update. AGENDA Why Proof Of Concept (POC)? Enterprise Solution Center (ESC) Role Test Update Q & A. Why POC?. Network Design Validation - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: NJEDge Portal  Proof Of Concept (POC) Update

1

NJEDge.net PortalNJEDge.net Portal Proof Of Concept (POC) Update Proof Of Concept (POC) Update

Joe Walter

Enterprise Solutions Center (ESC)

Verizon ESG

June 11, 2003

Page 2: NJEDge Portal  Proof Of Concept (POC) Update

2

NJEDge – Proof of Concept UpdateNJEDge – Proof of Concept Update

AGENDA

• Why Proof Of Concept (POC)?

• Enterprise Solution Center (ESC) Role

• Test Update

• Q & A

Page 3: NJEDge Portal  Proof Of Concept (POC) Update

3

Why POC?Why POC?

• Network Design Validation

• Vendor Interoperability

• Service Provider Interoperability

• Portal Implementation Strategy Development

Page 4: NJEDge Portal  Proof Of Concept (POC) Update

4

The Challenge The Challenge

• Take the Idea to Reality

• Complex Network Design in a Multi-vendor Environment

• Emerging IP Video Technology– H.323 standard (V1 - V4, with

options)

– Real Time Applications on a Non-Deterministic Data Network

Page 5: NJEDge Portal  Proof Of Concept (POC) Update

5

ESC InvolvementESC Involvement

PEOPLE PROCESS

TECHNOLOGY

ISO 9001CERTIFIED

ENGINEERS

LAB FACILITY

• Complex Solutions

• Network Integration Focused

Page 6: NJEDge Portal  Proof Of Concept (POC) Update

6

Enterprise Solutions CenterEnterprise Solutions Center

NETWORK ARCHITECTURE

NETWORK DESIGN

PROOF OF CONCEPT TESTING

KNOWLEDGE TRANSFER

Solving Enterprise Business Problems with Technology

Page 7: NJEDge Portal  Proof Of Concept (POC) Update

7

ESC CharterESC Charter Develop Integrated SolutionsDevelop Integrated Solutions

– Research new products and technologies

– Conduct product assessments & evaluations

– Conduct proof-of-concept integration testing

– Provide skills transfer Design Complex, Large-scale NetworksDesign Complex, Large-scale Networks

– Consult on design portion of strategic engagements

– Provide technical leadership and design review Support Laboratory ServicesSupport Laboratory Services

– Support customer trials

– Provide customized testing and evaluations

– Provide ongoing development of technical staff

Page 8: NJEDge Portal  Proof Of Concept (POC) Update

8

TE

ST

T

OO

LS

TRANSPORT

SONET DWDM

CORE NETWORK SERVICES

IP ATM Frame Relay

MULTI-SERVICE ACCESS

Wireless T1/T3 OC-N Ethernet

APPLICATIONS

IP Video IP Telephony

CO

MP

UT

ING

EN

VIR

ON

ME

NT

ESC Lab FacilityESC Lab Facility

Page 9: NJEDge Portal  Proof Of Concept (POC) Update

9

NJEDge.net DesignNJEDge.net Design

Page 10: NJEDge Portal  Proof Of Concept (POC) Update

10

ANJ/NJEDge Interop Test BedANJ/NJEDge Interop Test Bed

Internet

IP VPN/ATMCloud

Polycom FX

Cisco 2651Gatekeeper

DelawareATM

DE-7204-GK

Newark-GK

DEL-3660/GKHigh School

DEL_2651

Polycom FX

ANJ_FX

Internet(ISP)

Data

Data

NEWARK LATA

NJ ATM Core

DELAWARE LATA

.1

Newark-WAN

NJEDge Portal

ANJ Polycom MCU

ANJ Portal

NJEDge-GK1

NJEDge-GK2

CTM Servers Polycom VS_4000

HSRP

Cat_5505 NJEDge Polycom MCU

Cisco 7200WAN

NJEDgeRemote Site

Cascade MCM GK

CAT 6509/MSFC

ISDN

Page 11: NJEDge Portal  Proof Of Concept (POC) Update

11

Proof Of Concept Test OutlineProof Of Concept Test Outline

• FVC Click To Meet Premier (CTMP) Validation

• CTM/H.323 with Security - Firewall • IP Addressing scheme (Private vs. Public)• Dialing Plan (Private vs. Public)• Quality of Service (Marked vs. Unmarked)• Inter-Portal Gatekeeper Interoperability• Vendor Interoperability• Remote to Portal - IP VPN Connectivity • Trouble Shooting Procedure for NJEDge

network

Page 12: NJEDge Portal  Proof Of Concept (POC) Update

12

Current Status in Test BedCurrent Status in Test Bed

• Test Plan developed • IP Addressing and Dial Plan validated• Inter-Portal design and connectivity confirmed• Gatekeeper Redundancy configured and

tested• FVC Click-to-Meet scheduling application

staged and verified between devices• Cisco IOS software validated• Tandberg Endpoint Interoperability tested

Page 13: NJEDge Portal  Proof Of Concept (POC) Update

13

FVC Screen CaptureFVC Screen Capture

Page 14: NJEDge Portal  Proof Of Concept (POC) Update

14

Screen Shot of Conference SetupScreen Shot of Conference Setup

Page 15: NJEDge Portal  Proof Of Concept (POC) Update

15

Next StepsNext Steps

• Security Enhancement via Cisco PIX Firewall

• Quality Of Service (QoS) Validation

• Deployment and Pilot testing in early July

Page 16: NJEDge Portal  Proof Of Concept (POC) Update

16

Q & AQ & A

THANK YOU!