Dinner Talk 1st February 2012
Floating Storage Regasification Unit (FSRU):
Its implication to Indonesia’s Gas Business Landscape, Including Commercial, Technical and Operational Aspects
Hendra Jaya
President Director : PT Nusantara Regas
WEST JAVA FLOATING STORAGE REGASIFICATION TERMINAL (FSRT)
The presentation is made solely for the purpose of this event and is not intended to be andshould not be used by any other person or entity. The contents may contain copyrightand/or legally privileged information and the reader must therefore not use, copy, discloseor take any action based on this presentation material or any information herein.
PT Nusantara Regas (or by any of their respective officers, employees or agents) will not inany manner whatsoever be deemed or construed to implicitly or explicitly represent orwarrant the accuracy or completeness of the information or the contents of thispresentation material. All consequences and/or liabilities (including without limitation,those arising from negligence) to other parties for the utilization of the documents arespecifically disclaimed.
Disclaimer
3
LNG terminal 1
Potential for additional FSRU
Sumatra
Natuna
Kalimantan
Sulawesi
Nusa Tenggara
Papua
xx Conventional
Potential
reserves 2007
4.6
1.4
7.9
2.4
14
2.4
0.1
3-7
0.1
24
4553
32
xx CBM Recoverable
reserves 2007
Existing Java gas supply
shortfall of 1.1 bcfd
Existing Java gas supply
shortfall of 1.1 bcfd Java island reserves inadequate to
supply entire local demand
• R/P ratio* of just 16 years if Java fully
supplies demand today
Java island reserves inadequate to
supply entire local demand
• R/P ratio* of just 16 years if Java fully
supplies demand today
3.60.43.9
SurplusLocal
demand
Produc
tion
1.72.1
Local
demand
0.5
Produc
tion
Surplus
0.1
Surplus
0
Local
demand
0.1
Produc
tion
Source: Wood Mackenzie; Pertamina Team Analysis
Cirebon
Semarang
Cilegon Jakarta
ONWJ
Muriah
TubanBrantas
Sampang
Madura offshoreMadura Strait
Kangean(Tiung Biru/Jambaran, Cepu, Gundih)
(Haurgeulis, Pamanukan, Jatibarang)
(Pangkah, W Madura, Ketapang, Poleng)
SSWJ
Surabaya
Gresik
Mmscfd
Wortel
Demand1
Localproduction
SSWJ imports2
Shortfall
Infrastructure needed
Cepu
Gas production
Planned location for LNG regasterminal
Proposed pipeline
Existing pipeline
East JavaCentral JavaWest Java
2012 20202015 2012 20202015 2012 20202015
1800 23502050
600 400600
700-900
500-600
700-980
300-500 1350-1450470-750
200 250220
150 150200
0 00
50 10020
670700-800
650-750
850 700600
0 00
N/A 0-10050-150
Shortfall after FSRU
0-50 20-300 400-500 - - - - - -
JAVA GAS SUPPLY-DEMAND
4
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Mahakam PSC Demand
LNG SUPPLY
MTPA
Contract Year 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
ACQ in MT 1.50 1.25 1.25 1.25 1.00 1.00 1.00 1.00 1.00 0.75 0.75
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Additional Supply? Mahakam PSC Demand
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Domestic Supply? US LNG Additional Supply? Demand
1 MTPA Additional Supply 1 MTPA US LNG Additional Supply
Domestic Supply to fulfil 3 MTPA
5
LOCATION: 5o 58’ 28,920” LS dan 106o 47’ 57,96” BT
RADIUS : 2 KM , WATER DEPTH: 22 – 23 M PIPING LENGTH FROM SHORE: 15 KM
Power Plant Capacity Gas Req. Gas Supply Balance
MW mmscfd mmscfd mmscfd Muara Karang :
- Existing- Repowering
508720
290 110 -180
Tanjung Priok :- Existing- Repowering
1,180750
300 10 -290
TOTAL 590 120 -470
Gas demand in this area for PLN’s powerplants on Tanjung Priok and Muara Karangbrings to around 400 mmscfd (~3 MTPA) ofadditional gas supply need.
To fulfill this requirement, HoA between NRand PLN has been signed on 12 October2010
FSRU
LOCATION
PLN MUARA KARANGN
WEST JAVA FSRT PROJECT
LOKASI FSRT DI TELUK JAKARTA
6
FAST TRACK FSRT PROJECT
• Aquarius Vessel
• Indonesian Owner
and Flag
Rekayasa Indsutri
LOKASI FSRT DI TELUK JAKARTA
7
Source: Golar LNG Energy
FSRU KEY TERM
Source: Golar LNG Energy
8
PROGRESS UPDATE
FSRU Conversion Progress
December 2011: 88.29%
9
PROGRESS UPDATE Subsea Pipeline-ORF Progress
December 2011: 86.41%
10
• LNG supply for domestic gas consumption could be realized by operation
of West Java FSRT.
• This project as the 1st Indonesian floating LNG receiving terminal is a
milestone on gas infrastructure, and is expected to be commissioned in the
1st quarter or early 2nd quarter 2012.
• Fast track project has caused the project becomes very challenging.
• Additional LNG supply to fulfill FSRU capacity will be beneficial to West
Java’s gas consumers.
CLOSING REMARK
THANK YOU