The Marin Builders Association weekly bulletin will be
available exclusively online beginning November 1, 2010.
The MBA Board of Directors in their continuing effort to be more environmentally aware and fiscally responsible have decided to discontinue the printing and mailing of the weekly bulletin as of November 1, 2010. We now have the capabilities to offer a more comprehensive weekly bulletin, color advertising, guest articles, and up to date information. All for the benefit of membership!! We will be distributing a weekly e‐bulletin and the uploaded version can be read at www.marinba.org. If you would like to have a white paper copy, please stop by the Association and say hello. We will keep a hot cup of coffee and a few copies of the bulletin available for those individuals who want to pick one up!!
To sign up for your MBA E‐Bulletin!! Please contact janet@marinba.org.
WEEKLY BULLETIN
President Dave Trahan ~ Patriot Mechanical
Vice President
Mark Silvia ~ Marin Mechanical Inc
Chief Financial Officer Jeff Mertel ~ Mertel Carpets Inc
Secretary
Aimi Dutra~ The Dutra Group
Past President Jeff Grady ~ Grady Consulting Services
2010-2011 MBA Directors & Officers
Barry Arends ~ Morris Roofing Tyler Doherty ~ Cal West Rentals Inc
Gary Frugoli ~ Construction Consultant Peter Migale ~ Migale Painting Co
Keith Dotto ~ Dotto Glass, Inc.
Jim Schalich ~ Schalich Brothers Construction
Dick Ghilotti ~ Ghilotti Construction Company
Dave Garbarino ~ Marin Sanitary Service, Inc.
Jeff Pottorff ~ North Bay Landscape Management
Staff
Klif Knoles ~ General Manager / Safety Director
Paula Krause ~ Assistant General Manager
Sue Peterson ~ Controller
Diane Van Renselaar ~ Planroom
Joan Szarfinski ~ Front Office Assistant
Janet Alessandra ~ Website – Weekly Bulletin ~ Notary
Casey Mazzoni ~ Legislative Analyst
The weekly bulletin is owned by MBA & is available to member firms only :
www.marinba.org or email
660 Las Gallinas Avenue, San Rafael CA 94903.
Publisher: Klif Knoles; Data Editor: Janet Alessandra
MMBBAA FFLLUU SSHHOOTTSS && HHEEAALLTTHH FFAAIIRR
FFLLUU SSHHOOTTSS $$1155..0000 eeaacchh
FOR ALL MBA MEMBERS, EMPLOYEES AND THEIR FAMILIES
Thursday – October 28th, 2010 3:00 P.M. – 6:00 P.M.
Marin Builders Association, 660 Las Gallinas Avenue, San Rafael
FLU SHOT SIGN‐UPS ARE REQUIRED IN ADVANCE Refreshments will be provided
The Sign‐Up DEADLINE is Friday ‐ October 22nd so act now!
Our Benefits Consultant Chelsea Sabre Lee will be on hand to answer questions and discuss our health plan program.
IMPORTANT: If you have a history of hypersensitivity to eggs or egg products, do not sign up for a flu shot. Women in the first trimester of pregnancy can not have a flu shot; second and third trimester must have a doctor’s note. Due to liability the flu shot will not be administered to anyone under age 18.
***REGISTRATION FORM*** Please complete & return no later than Friday, October 22nd to:
MBA, 660 Las Gallinas Ave., San Rafael, CA 94903 or Fax to (415) 462‐1225
Please print all names clearly. Attach a list of additional names if needed.
Company Name____________________________ Phone ______________ Fax _____________ Name___________________________________ ( ) Flu Shot ($15 ea.) ( ) Pneumonia ($45 ea.)
Name___________________________________ ( ) Flu Shot ($15 ea.) ( ) Pneumonia ($45 ea.)
Name___________________________________ ( ) Flu Shot ($15 ea.) ( ) Pneumonia ($45 ea.)
Name___________________________________ ( ) Flu Shot ($15 ea.) ( ) Pneumonia ($45 ea.)
Name___________________________________ ( ) Flu Shot ($15 ea.) ( ) Pneumonia ($45 ea.)
Completed by: _____________________________________ ____________________________________
Print Name of Authorized Person Signature of Authorized Person
Presents
CPR ~ FIRST AID CLASS
Wednesday, November 17, 2010 8:30 A.M. – 2:30 P.M.
660 Las Gallinas Avenue, San Rafael
$65 Members ~ $100 Nonmembers
Attendees receive CPR and First Aid Certifications
This course encompasses the new CPR (hands‐only) and traditional CPR for adult/child/infant. Also includes activation of EMS system, heart healthy behavior/nutrition and foreign body airway obstruction management. The first aid portion includes management of medical emergencies in the crucial first few minutes while help in on the way.
For reservations call MBA at 4154621220
Or complete and return this form by fax to 4154621225 Or go to our website www.marinba.org and pay online
Company: _______________________________ Phone: ___________________
Person(s) attending: _______________________________________________
(Cancellations made after November 15th will be billed)
Presents
EPA’s New Renovation, Repair and Painting Rule (RRP)
What is the new RRP Rule & how does this EPA Regulation affect you?
Tuesday November 30, 2010 8:00 A.M. – 5:00 P.M.
660 Las Gallinas Avenue, San Rafael
$185 Members ~ $250 Nonmembers Must Be PrePaid
This course will meet the EPA Training requirements for persons performing renovation in pre1978 housing and child care facilities. Students that complete the course will become Certified Renovators and know how to perform all work using lead safe work practices. Students will also learn how to perform acceptance testing for their work.
For reservations please complete and return this form with a check made payable to: Marin Builders Association or go to our website www.marinba.org and pay online.
Company: __________________________________ Phone: _______________
Person(s) attending: ______________________________________________
All Participants Must Be PrePaid
Cancellations made after November 24th and noshows will be charged.
Basic HERS Training Announcement Nov. 29th thru Dec. 1st, 2010 in Concord, CA
Cost: $675.00
(covers class, materials, lunch and written exam)
TUITION ASSISTANCE AVAILABLE for unemployed and underemployed workers
through the EDD’s One Stop Career Centers and
UP TO 80% REIMBURSEMENT POSSIBLE for employees of qualified companies
through the California Employment Training Panel (ETP2) Program
For more information, contact Karen at 530-265-2802 or kmarinovich@gmail.com
• The CBPCA 2008 HERS Basic Rater Certification Training provides the classroom and field training required to qualify as a California Field Verification and Diagnostic Testing Rater under the new 2008 Standards. This course will qualify successful participants for rating existing homes for Title 24 field verifications and testing homes for utility HVAC incentive programs. The CBPCA is not yet certified for newly constructed buildings or whole-house home energy raters.
• Basic HERS also provides prerequisite training for Building Performance Contractor Trainings and Whole House Home Energy Rater Trainings (HERS ll – pending curriculum approval)
• Completion of the basic HERS class does not constitute legal certification as a HERS Rater. Visit www.cbpca-hers.org for course description and further requirements for legal certification.
An individually scheduled field test is also required at an additional fee after passing the written test.
CPBCA HERS raters who have not yet taken the 2008 Standards Update qualify for reduced tuition ($195 for the 3 day class) – call 530-575-7835 for information.
Class audits also available for those needing to retake Basic HERS
to register online visit: www.cbpca-hers.org For registration assistance, call 530-575-7835 or allisonm@cbpca-hers.org. .
CBPCA is certified as a Home Energy Rating System (HERS) provider for HERS Raters conducting field verification and diagnostic testing on alterations to demonstrate compliance with
the 2008 Building Energy Efficiency Standards with Enalasys as a Third-Party Quality Control Program Provider.
For Immediate Release: October 14, 2010 Media Contact: Susanne Garfield or Adam Gottlieb (916) 654-4989 sgarfield@energy.state.ca.us agottlie@energy.state.ca.us
$33 Million to California in Jeopardy
Court Freezes Stimulus Funds for Energy Efficiency Days Before Deadline SACRAMENTO – A $33 million statewide energy efficiency jobs program has been forced to stop after a Riverside County judge issued a temporary restraining order against the California Energy Commission. The judge, disregarding a looming federal deadline, also blocked the Energy Commission from spending the funding for any other purpose, including energy upgrades to residential, commercial or state buildings. The federal requirement for the state to encumber the funds is October 21. In a hearing this morning instigated by Western Riverside Council of Governments, a Riverside County Superior Court judge set a November 4, 2010 hearing date to consider if the Energy Commission is in contempt of court for canceling a solicitation that was rendered obsolete by changes in federal banking regulations. The Department of Energy awarded the Recovery Act money to the Energy Commission and encouraged the Commission to use it to set up financing systems that would make it cost-effective for homeowners to upgrade their homes so they use less electricity. “There is absolutely no basis for this order – this litigation centers on a solicitation that the Energy Commission has canceled,” said Karen Douglas, California Energy Commission Chairman. “Western Riverside’s lawsuit threatens to derail a comprehensive statewide jobs program by holding up $33 million in stimulus funds – funds that would benefit the entire state, including citizens of Riverside County. ” Late last year, the Energy Commission released a $30 million federal stimulus funded solicitation calling for proposals to create a Property Assessed Clean Energy or PACE program which would have financed energy efficiency and renewable energy systems for California residential and commercial consumers. Western Riverside submitted a $20 million PACE proposal but was disqualified because they ignored energy efficiency requirements in the guidelines and insisted that the funds should be spent only on installing solar panels. Western Riverside protested but was too late in filing their complaint to the Department of General Services (DGS). When DGS dismissed their complaint, Western Riverside sued DGS in Riverside County and a judge ordered DGS to hear their late protest. In addition, the judge also ordered the Energy Commission not to go forward with the winning contracts.
On July 6, 2010, however, the Federal Housing Finance Authority effectively pulled the plug on all PACE programs nationwide (including Western Riverside) making the Energy Commission’s $30 million financing award obsolete and soon afterward the financing solicitation and its five awards were canceled.
The Energy Commission has the discretion to cancel solicitations that will no longer achieve their intended objectives. In addition, the Energy Commission has the discretion and authority to determine how to best use the federal funds that it administers to meet state policy goals and the objectives of the Recovery Act. Racing against the federal time clock so the remaining $33 million in federal funds were not forfeited, the Energy Commission created Energy Upgrade California, a new comprehensive, statewide energy efficiency and renewable energy building improvement program sponsored by the PUC, utilities and local governments. Western Riverside returned to the Riverside court, filed a motion for a restraining order to stop Energy Upgrade California, claiming the Energy Commission should be held in contempt for violating the order that DGS should hold a protest hearing on the now-canceled PACE solicitation. “Western Riverside deliberately refused to engage the Energy Commission in a public forum and ambushed us with a baseless, last-minute contempt charge,” said Douglas. “This court order places us squarely in conflict with federal deadlines, at the expense of local governments across the state.” Energy Upgrade California would provide energy efficiency, renewable energy generation and water efficiency information on rebates and incentives, outreach and marketing, and financing opportunities to all California’s fifty-eight counties through an integrated web portal and a one-stop clearinghouse for financing options. “The misguided actions by Western Riverside will likely result in these Recovery Act dollars reverting to the federal government, thereby preventing the Energy Commission from launching a statewide, job creating energy efficiency program," said California Task Force Director Rick Rice. "Instead of working to put these Recovery Act dollars to good use, Western Riverside is choosing to put tens of millions of dollars at risk for local governments throughout the state that would otherwise be able to participate in this program.“ ###
SAN RAFAEL San Rafael appoints Assistant City Manager
The San Rafael City Council on Monday appointed Assistant City Manager Jim Schutz to interim city manager. The council made the unanimous decision in closed session.
In September, City Manager Ken Nordhoff announced he will take a job as Walnut Creek's city man-ager starting Nov. 18. Nordhoff has worked for San Rafael for 14 years.
Schutz will earn an annual salary of $169,903 while he serves as interim city manager. City officials expect the search for a permanent city manager to take about six months.
Cal Park Tunnel set to open in November
The $27 million Cal Park Hill Tunnel is expected to open to the public on Nov. 9. The tunnel will have a bike and pedestrian path and eventually trains and their riders.
The tunnel, last operational in 1978 and has been closed since the 1980s. The re-built tunnel, which is 30 feet wide and 25 feet tall, is divided, part dedicated to the rail right of way, the other to bicycle and pedestrian use.
NOVATO
Housing Element Community Meeting
The Novato City Council will hold a public meeting on October 26, 2010, at 6:30pm at City Hall at 901 Sherman Avenue, Novato, CA. The City Council will hear and discuss a status report on the Housing Element update process, schedule, proposed workshops, and the City Manager’s Working Group, in-cluding the membership, purpose and role of the Group.
SAN ANSELMO
San Anselmo council re-considers plan to ban PG&E's smart meters
The town of San Anselmo will not stop Pacific Gas and Electric Co. from installing trademarked Smart-Meters after all.
The council revisited the issue at Tuesday night’s meeting and split 2-2 on the question, with Council-woman Kay Coleman recusing herself. The council voted 3-0 last month to draft an ordinance that would place a one-year moratorium on the meters. The council was concerned with the use radio waves to transmit data on energy usage to PG&E. Critics of the meters fear the production of radio-frequency radiation from a growing list of digital devices in the home could pose health threats.
For more information on this issue or any other issues of interest to the construction industry please contact Casey Mazzoni at 415.342.3328 or casey@marinba.org.
Casey Mazzoni 415 .342 .3328 or casey@marinba.org .
Marin Legislation
Legislative Analyst
Advertising
Services For Your Business
Kalb's Q&A for Contractors By David Kalb, President of Capitol Services, Inc. I will ‘mow’ down a common misconception about adding ‘landscaping’ work to your General license. Two other questions help clarify how and when a ‘special’ waiver may be obtained by “A”, “B” or “C” contractors. First, we share the rules on when a DBA is appropriate in advertising a business name… Q: I am familiar with the CSLB’s advertising guidelines after having reviewed these on your website Online Resources page. Nevertheless, there still seems to be some uncertainty associated with these statutes (B&P 7029.6 and 7030.5). Our interest is to simplify our advertising whereby both our companies can advertise under the same ‘DBA’. Two questions: will the Board allow two companies with the same business name? Will we need to list the FULL company name plus the DBA? I know we’ll likely need to register any changes with our local government. A: I’m glad you found these guidelines useful. In answer to your first question, YES, in general the Board will allow the same fictitious business name (DBA) for two companies. However, it is very unlikely the Board would allow a General Partnership (GP) or a Limited Partnership (LP) to list a ‘DBA’ as is the case with one of your business entities. In response to your second question, NO, you’re not required to list the full company name – only the “DBA’ portion. Q: We’ve had a “B” license for many years. Our interest is to secure a “C-27” class to handle landscaping. Do you feel the CSLB would issue a waiver of this class under 7065.3?
A: According to Section 7065.3, the CSLB will look at whether a Specialty (“C”) classification is “closely related” to the class presently held by the contractor. Or as it relates to “A” or “B” contractors, the applicant will need to apply for a classification “which is a significant component of the licensed contractors construction business as determined by the Registrar”. While current law allows for an “add class” waiver, I do not believe the CSLB would grant a waiver for the landscaping classification. Q: I have a large roofing company client who wants to add the “B” to his existing “C-39” license. He has experience in carpentry, HVAC, electrical and plumbing while performing commercial re-roof projects. I would like to get him an exam waiver under B&P 7065.3. Can you help with this and do you think the CSLB would approve such a request? A: I have yet to see the Board approve a waiver for a General classification when the present class held is a ”C” specialty. As I responded to the prior questioner, the classification being applied for must be sufficiently related to the class presently held by the contractor. When 7065.3 was added to the Board’s statutes in 1990, its “general” purpose was to allow “A” or “B” contractors to secure a waiver of a related additional class that had been performed or supervised on a regular basis. For General builders, this would likely include (but not be limited to) Plumbing, Plastering, Carpentry, Painting, Drywall, or Roofing. For General engineering contractors, this would include Sanitation Systems, Pipeline or Earthwork and Paving for example.
While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance immediately when you call 866-443-0657, email info@cutredtape.com, or write me at Capitol Services, Inc., 1225 8th St. Ste. 580, Sacramento, CA 95814.Researchpastcolumnsat www.cutredtape.com.
QQUUEESSTTIIOONN!!
WWWHHHAAATTT IIISSS YYYOOOUUURRR MMMOOOSSSTTT VVVAAALLLUUUAAABBBLLLEEE AAASSSSSSEEETTT???
YYYOOOUUURRR IIINNNCCCOOOMMMEEE!!!!!!
The CONSTRUCTION BUSINESS is a challenging business even while you are healthy & working. It creates cash flow to pay for your daily
living expenses such as your mortgage & other fixed expenses.
If you are not working…YOUR INCOME STOPS!!
Look into the “MARIN BUILDERS ASSOCIATION” Disability Program. It’s competitive and discounted to members!
The Marin Builders Association has continued to offer this
Long Term Disability Program Serviced through the
Agency of David White & Associates 3150 Crow Canyon Place, Suite 200
San Ramon, CA 94583
www.dwassociates.com
California License No. 0504164
If you would like information, including details of coverage and costs please call: Carol Keller (925) 277-2664
Date Owner Contractor Project Address Work Value
Novato11-Oct John W Schaumlefel Owner 695 Orange Avenue Rmd 7,000.00$
Clemon Woodberry California Heating & Cooling 169 San Carlos Way HVAC 10,772.00$
Craig Bandalin Able Roofing Co 183 Michele Circle ReRoof 8,500.00$
Don Lesser Rec Solar Co 141 Windwalker Way Solar 56,000.00$
12-Oct Gerald R Shannon Owner 720 Santana Road Rmd 7,500.00$
Robert E Van Dis Contra-Spect LTD 259 San Ramon Way Rmd 15,500.00$
Redwod Blvd Invest Downing Heating & AC 7665 Redwood Blvd Plumbing 21,657.00$
Steward Property Alternative Roofing Solutions 61 Scottsdale Way ReRoof 6,490.00$
13-Oct Walter Kieckhefer Co CDK Builders Inc 490 Ignacio Blvd Bldg E rMD 17,100.00$
Becky Reetz Owner 1116 Ferris Drive Rmd 5,000.00$
Meryl Lynch Credit C J Electric 788 Rowland Blvd Electrical 6,500.00$
Mikhail A Posylkin Kelly Plumbing & Heating 205 San Felipe Way HVAC 7,600.00$
Johnny W Laurant Able Roofing Co 37 Brown Drive ReRoof 12,000.00$
14-Oct Diane Ackerman Gene Burch Plumbing & Heating 388 Sundance Way HVAC 5,588.00$
James Newgren Phillip Glen Jones 35 Sheila Court Rmd 16,500.00$
Mark Macquarrie Mac's Roofing Inc 400 Fairway Drive ReRoof 20,300.00$
Phillip J Brown SolarCraft Services Inc 16 Ramona Way Solar 32,300.00$
Tiburon
11-Oct P Fox 435-6884 Euro Const 987-3669 167 Avenida Miraflores Deck/Patio 18,865.00$
Byron Pollitt J H Olsen Construction 987-3669 68 Via Los Altos Kit/Rmd 74,454.00$
Permits - Permits - Permits - Permits - Permits
B Auld 435-2946 B Cantarutti Electric 577-5199 7 Palmer Court Conduit 59,000.00$
P Mathews 435-3885 United Contractors 479-9269 131 Esperanza Street Bath/Kit/Rmd 16,000.00$
12-Oct R Hill 435-2758 Dickson Co 456-1830 4655 Paradise Drive Furnace 14,000.00$
S Schwartz 323-2900 Superior Structures 336-4743 490 Ridge Road Bath/Kit/Rmd 125,000.00$
S Schwartz 323-2900 Superior Structures 336-4743 490 Ridge Road Spa/Fence 100,000.00$
Brian Conn Floyd Const 483-0645 5070 Paradise Drive Bath/Kit/Rmd 200,000.00$
John Nooteboom Koeford Const 378-7099 677 Hawthorne Drive Conversion 55,000.00$
A Hoybach 435-1277 Chris Wadleigh 246-6383 96 Sugarloaf Drive Addn/Rmd 400,000.00$
14-Oct J Boris 305-3368 Jim Thompson 328-7420 3 Apollo Road ReRoof 7,500.00$
Owner Address Contractor Work ValueReceived
16-OctHolly Zebroski 1105 Via Escondida Novato Bath/Rmd 7,000.00$
Robert M Dell 19 Tamal Vista Lane Greenbrae Ret/Wall 50,000.00$
Robert M Dell 19 Tamal Vista Lane Greenbrae Addn/Rmd 250,000.00$
Lee Unkrich 69 Rock Road Kentfield Fuel Cell 20,000.00$
Skywalker Properties 3800 Lucas Valley Road Nicasio 3 Antennas 15,000.00$
Brian D Rutana 40 Laurel Street Inverness Rmd 100,000.00$
Gerald M Schwartzbach 1049 Erica Road Mill Valley Decks 35,000.00$
David A Kell 136 Crane Drive San Anselmo Deck 35,000.00$
William H Rostenberg 115 Corte Anita Greenbrae Solar 17,816.00$
Minnie Corda 833 Chileno Valley Road Petaluma Solar 35,000.00$
Trinh Hong 1055 Bel Marin Keys Blvd Novato Demolition 25,000.00$
Francis R Currie 1 Balboa Avenue Inverness Solar 73,000.00$
Joseph M Bell 301 Morning Sun Avenue Mill Valley Windows/Siding 97,831.00$
Julian J Brandes 541 Marin Avenue Mill Valley Solar 15,000.00$
Issued16-Oct
Karl L Matthies 89 Rock Road Kentfield Caletti Jungsten Const Rmd 7,500.00$
Donald Barash 112 Laurel Grove Avenue Kentfield DeMello Roofing ReRoof 8,325.00$
Housing Authority 47 N Knoll Road Mill Valley Segue Construction Ret/Wall 7,000.00$
Mark H Ultsch 403 Shoreline Hwy Mill Valley Owner Conversion 8,500.00$
Gregory A Thornton 178 St Thomas Way Tiburon Zamgen Construction Entry 88,200.00$
Kathy Jannett 2650 Center Road Novato Second Generation Roof ReRoof 6,843.00$
K thl C L hi 508 F D i S A l O R d 10 000 00$
County of Marin Permits
Kathleen C Lanphier 508 Fawn Drive San Anselmo Owner Rmd 10,000.00$
Judy Porter 463 Calle De La Mesa Novato Agape All American Roof ReRoof 9,777.00$
Edward Denebeim 335 Robin Road Mill Valley Mizani Bijan Rpr/Rplc 6,000.00$
County of Marin 451 Airport Road Novato Womack Construction Rmd 10,000.00$
Denise J Dupree 608 kernberry Drive San Rafael Kelly Plumbing & Heating Boiler 5,900.00$
Douglas M Good 101 Laverne Avenue Mill Valley Miranda's Roofing ReRoof 7,500.00$
Michael A Heacock 43 Loring Avenue Mill Valley Owner Rmd 10,000.00$
Marinland Develop 475 E Strawberry Drive Mill Valley Plath & Company Inc Fitness Center 1,800,000.00$
Frank K Bacher 26 Madrone Park Circle Mill Valley Two Good People Const Rmd 150,000.00$
Sara J McMillen 42 Mt Muir Court San Rafael Renewal by Anderssen Windows 8,065.00$
Maria C Lucas 2645 Center Road Novato Henris Supply Inc ReRoof 9,500.00$
Max J Newman 45 Oak Knoll Drive San Anselmo Owner Addn/Rmd 15,000.00$
Adam F Petras 67 Ranchitos Road San Rafael DeMello Roofing ReRoof 14,000.00$
Jean L Mastagni 524 Marin Avenue Mill Valley McLeran Inc ReRoof 7,850.00$
James F Brock 530 Shasta Way Mill Valley Armstrong Installation ReRoof 23,000.00$
Juan A Garcia 93 Montego Key Novato PWD - No. California Windows 7,300.00$
John Hoy 208 Tiburon Blvd San Rafael Valentine Corporation Rmd 17,204.00$
County of Marin 10 Avenue of the Flags San Rafael Ghilotti Construction ADA Upgrades 366,000.00$
Jeffrey Felix 171 Mesa Road Point Reyes Station Excellence Heating & AC Furnace 6,100.00$
Michael Zachariou 706 Bay Road Mill Valley Owner Windows 8,883.00$
Tsutsui Koji 8 Madrone Park Circle Mill Valley Radco & Associates Inc SFD 300,000.00$
Tsutsui Koji 8 Madrone Park Circle Mill Valley Radco & Associates Inc Entry Stairs 10,000.00$
Tsutsui Koji 8 Madrone Park Circle Mill Valley Radco & Associates Inc Car Deck 50,000.00$
Holly Hernandez 10 Wolfe Glen Way Greenbrae Wine Country RemodelingReRoof 42,000.00$
Get Tech-Savvy Simple steps to make your website user friendly
In today's technological world, your customer will be accessing your business's website in all
kinds of new ways. It is important for owners of small businesses to consider devices like
iPads, smartphones, and netbooks when developing their online content. But how do you
please everyone when your costumers use such a wide array of gadgets? Here are a few
tips on how to make your website more usable for your tech-savvy audience:
• Utilize analytic applications. Use an analytics or metrics application to track
visitors to your website. Not only will you be able to see how many hits you are
receiving, but many applications will also show you the browser information for the
people viewing your site. Once you determine the most popular browsers and
operating systems and your customers' usage of mobile devices, you can decide how
to best develop your website to cater to your specific audience.
• Consider mobile devices. Check out how your website looks on the smaller screen
of a mobile device. If your audience is frequently accessing your website through
these devices, consider asking your web developer to create a less image-heavy site
targeted directly for these users. You could, for example, create a style specifically
for mobile web browsers, or create a program that adjusts your website to specific
devices and screen sizes.
• Install easy printing options. If you know that your audience likes to print content
off of your website, you might want to make it even easier for them to do so. For
example, ask your web developer to add a printer-friendly sheet that can be
accessed by your readers by a "print" icon on the webpage.
• Give your audience control. Demonstrate your flexibility to your customers by
allowing options on your website that cater to individual needs. For example,
including an option to increase or decrease font sizes for easier reading or adding
color controls to adjust the page's contrast are both good ideas to show your
customers that their preferences matter.
Advertising Services For Your Business
State Compensation Insurance Fund is not a branch of the State of California.
We protect the peoplewho build California.
Will my supplies be here on time? Am I going to get this bid? We understand those on the job in California have more on their mind than workers’
compensation insurance. So let us put your mind at ease: you cancount on the strength and stability of State Fund. We’ve never pulled
out of the market due to an economic downturn, and we never will. Visit statefundca.com today to learn about the 6% discount on premiums we
o�er eligible GSBE members. Your individual business may be eligible for even more discounts. Thanks for reading…we’ll let you get back to work.
Together, we’ll help keep California working.statefundca.com
Member of Golden State Builders Exchanges
COMPLETIONS NOTICES LIENS
ADDRESS OWNER CONTRACTOR
CompletionsEntire Peninsula Road Belvedere City of Belvedere Ghilotti Brothers IncVarious Locations Belvedere City of Belvedere Coastside ContreteVarious -Delong Avenue Novato City of Novato Ghilotti Construction Company16 Jeannette Pradi Way San Rafael HVAC County of Marin Core ControlsWoodacre Fire Station Pavement County of Marin Team Ghilotti Inc2010 Pipe Bursting Homestead Valley Santiary Darcy & Harty IncMarin Orthopedics & Sports Medical Nov Lawler Solomon Kelly LLC Westridge Builders700 Miller Avenue Mill Valley Tamalpais UHS - Stariway Michael Paul Company IncSwimming Pool Alteration Novato HS Novato Unified School Dist R. McClure Electric IncGlenwood Forest Tank MMWD Piazza ConstructionRafael Highlands Tank Seismic MMWD Piazza ConstructionBayside Acres Pipeline MMWD Piazza Construction
Notice of DefaultCalifornia Reconveyance Company Douglas N AkayCal-Western Reconveyance Corporation Carlos D/Maria AlvaradoTD Service Company Yami AnolikAztec Foreclosure Corporation Patricia MerrillAztec Foreclosure Corporation William D GordonDeFault Resolution Network Leslie Baer-CarringtonDeFault Resolution Network Randall J/Sonia Duncan BobaCal-Western Reconveyance Corporation Kimberly/Robert B BourdetTD Service Company Pamela T BourkeNDEX West LLC Shirley Lee BroleyRSM&A Foreclosure Services LLC James E Brown
www.marinba.org
RSM&A Foreclosure Services LLC James E BrownCal-Western Reconveyance Corporation Christine Marie GuthrieCal-Western Reconveyance Corporation Brittany/Christopher KurtzCal-Western Reconveyance Corporation Martha J/Ollis N ThompsonCal-Western Reconveyance Corporation Pavana D ThongsilpCal-Western Reconveyance Corporation Sandra Acevedo-HannsCal-Western Reconveyance Corporation Lydia J MondalaCalifornia Reconveyance Company Catherine M DennesCalifornia Reconveyance Company Marianne RostchildCalifornia Reconveyance Company Elizabeth S/Ian RoseCalifornia Reconveyance Company Navjot LLCCalifornia Reconveyance Company Theresa CampbellDeFault Resolution Network Glenn Rogers CarringtonRecontrust Company Dawn C CostaNDEX West LLC Richard Lane CouchCR Title Services Inc Andrew H ShotzTD Service Company Francine E CrnichETS Services LLC Tam HoangETS Services LLC Tung NguyenQuality Loan Service Corporation Wanda EvrardFirst American Trustee Servicing Jerome FaszerNDEX West LLC Samuel GonzalezQuality Loan Service Corporation Eduardo GonzalezRecontrust Company Cameron G HartIntegrated Lender Services Elmer C/Lisbeth P Deleon-RodasIntegrated Lender Services Mollie K/Stephen M LawniczakDeFault Resolution Network Douglas K/Nancy McVickar
www.marinba.org
COMPLETIONS NOTICES LIENS
ADDRESS OWNER CONTRACTOR
Notice of DefaultNDEX West LLC Billy WeatherlyNDEX West LLC Amy R KitayPLM Lender Services Inc Donald/Carol PetersQuality Loan Service Corporation Eduardo GonzalezQuality Loan Service Corporation Maribel/Ramiro Jorge SaabedraRecontrust Company Cameron W HartRecontrust Company Jacqueline SantiagoRecontrust Company Doris/Ted L SimonRecontrust Company Dawn CcostaRegional Service Corporation Eric S/Susan L SchumanRegional Service Corporation Stacey Ann Collins
Homestead24 Florence Avenue San Anselmo Allison/Samuel Black26 Willow Lane Sausalito Patrick A/Shoko F Moloney622 Idylberry Road San Rafael Michael J/Martha Runco190 Ocean Parkway Bolinas Anne Vrolyk
Mechanic's Lien32 Wray Way Sausalito David Arden Bay Area General Const 21,290.00$ 52 Los Pinos Way Nicasio David Warhentin Arolo Company Inc 6,786.00$ 750-790 Lindaro Street San Rafael Seagate Properties Bagatelos Architectural 108,743.00$ 71 Creekside Drive San Rafael Elizabeth Blickman Michael B Mayock Inc 4,665.00$ 366 Margarita Drive San Rafael Susan Faramarzi California Retaining Wall 209,515.00$ 673 Bridgeway Sausalito Hooshang Seda Carrera Marble 9 500 00$
www.marinba.org
673 Bridgeway Sausalito Hooshang Seda Carrera Marble 9,500.00$ 537 Biscayne Drive San Rafael Donna Collins Golden Restoration & Co 21,580.00$ 80 Montford Drive Mill Valley Josh Davis MRCW Design/Build 9,930.00$ 23 Reed Blvd Mill Valley Goldsmith Association DeMello Roofing Inc 444,525.00$ 9 Sky Road Mill Valley Paul Ghafoori Steven Schoonover 15,427.00$ 2135 Vistazo East Tiburon Joseph Quirk Timotny J Peterson 133,163.00$
Release of LienGeorge Quinn Chen Birite Restaurant Supply IncYvette/Michael Cummins Vision Builders IncDenise Carlette/Tim Ridges Pollough Construction
CA Tax Lien IRS Tax LienGeorge F Dumas Linq3 TechnologiesBetty D Price Brooks CoulsonGabriel Bensimhon National Appliances IncSamuel Kornhauser Michael Bronshvag MD IncCheedlet Hastings Gary L HowellCharles T Childs Helen L AmorosoAdrian A Balfour BinyerdJason D Beiler Barbara/Brannon KellerDonna A/James A Radu Barbara BrownTroy J Courtney Binyerd BrownsLisa D Demosourtney William A CarterDenni8s N Marada Doug MooreGregory G Clark Randall W RobinsonErnesto Velasquez Theresa Shugrue
www.marinba.org
COMPLETIONS NOTICES LIENS
ADDRESS OWNER CONTRACTOR
CA Tax Lien IRS Tax LienEsmidio R Vasquez McGarr House 1 & 2Thanh V Nguyen Augusta WhiteMiguel Avila Edward H MargolinBoat 15 LLC Carole A HarteKlab Consulting Kentfield Ross News Service IncDK2 Enterprises Limited Partnership Claudia GallagherDataval Inc Amberly/James R MillerCafé Reyes Estate Coffee Anna M StuartDennis Sullivan Electrical Services Frank M RiosFrank M Rios Dobbins-SellersYolanda Mendieta Gladys/Stephen BloseAntonio Jimenez Mary Jo/Michael PritvhardSean McLaird Howard I CartmillDonald W Schwartz Fernandos Auto Repair
Erwin Andrews Jose Luis Mazariegos
Sharon Butticci Aaron H Braun\
James M Underwood Joan P Dehovitz
Cindy/Michael J Runco Charles Tourkantonis
Karol R Janssen Kimberly A Salvail
Turk Kauffman Anthony P Dacosta
Daniel G Harris Wadleigh Group Inc
C D L Townsel Edwar A DeLeon
Heather Anderson James B Sanders
Chris Hinde Craig R Bailey
www.marinba.org
Talitha Hillman Brian J Smith
C Restored LLC Anya E Bandt
Graven Images Inc Scott Landeck
Eisenhardt Import-Export LLC Karen Davis
Clean System America Inc Magnolia Avenue Salon
Norlin J Merritt Peggy B Messer
Chad D Caliendo Marsha M Quinn
Robert Grossman Walter J Traver
Jerry P Wesson Tanya M/Thomas A Jaspering
Reynaldo H Mancilla Barry D Kushner
Adrian D Derenzy John R Storey
David T Heitz Samuel L Doe
Matthew D Earnhardt George H Elias Jr
Joseph/Jeremiah J Odonovan Deborah Nikkel
Nenad L Mirkovic Paul L Bacon
Christopher J Knoll C P Bartle
Victoria B Collins Trust E A Glassman
JS Ventures Leopoldo Garza
Demetrios Sgouros James Cooney
Karen K RasmussenDavid F MonsonChristopher J FleischmanHamid K RazaviWert TageTimothy T LeonardJohn H BallardArmando BenitezFreddy R Tamaycool
www.marinba.org
Tips for Incorporating Wellness Into Your Ergonomics Program
A good ergonomics program will address the occupational or physical risk factors of work. But, what about the non-occupational and individual risk factors such as obesity, physical inactivity, diet, smoking, and stress—all of which have been linked to an increased likelihood of developing musculoskeletal disorders (MSDs). Worksite wellness programs can help reduce non-occupational and physical risk factors as well as address other health concerns for employees.
Recent studies show that for every dollar invested in a worksite wellness program, approximately three dollars are returned through better employee health, improved productivity, and reduced absenteeism.
Below are some tips to encourage your employees to make small changes toward a healthier lifestyle.
• Educate your employees. Organize "lunch and learn" sessions on relevant topics such as nutrition, healthy cooking, weight management, smoking cessation, and stress reduction.
• Organize a wellness fair. Invite representatives from local medical facilities, gyms, or weight-loss clinics to set up tables for blood pressure and cholesterol screening, lifestyle evaluations, nutrition counseling, and fitness tests. Invite your STATE FUND loss control professional or ergonomist to set up a table on health, safety, and ergonomics.
• Organize walking groups. Encourage participation by providing maps of safe walking routes near the office. Provide ways for participants to track their progress. Make it competitive—who walks the furthest in a week, month, quarter, and year.
• Provide fruits and other healthy snacks at meetings.
• Provide better choices in the cafeteria or in vending machines such as 100 calorie snack packs, fruit, and water. Consider offering free fruit as an alternative to sugary snacks.
• Set up friendly competitions and challenges within your facility or with neighboring employers.
• Offer a variety of incentives to encourage employee participation. Consider offering "prizes" when goals are met. This may also encourage individuals to set new and higher goals.
• Contact local gyms or weight clinics as they may be willing to offer discounts to employees.
• Provide employees sufficient time and a place to practice wellness activities. Offer a meeting room for lunch time yoga or stretching classes. For those employees who go to the gym or participate in a walking group during lunch, consider giving them an extra 15 minutes for their lunch after their activity.
• Develop a newsletter or internal web page outlining your program and the benefits to employees.
Advertising
TO ADVERTISE IN THE
WEEKLY BULLETIN
CONTACT—JANET
JANET@MARINBA.ORG
Requesting Sub Bids
E.F. Brett & Company, Inc. is seeking qualified DVBE/SLBE sub contractors
to bid the following project
Bid Due Date: 10/26/2010 - 2:00 pm Project Name: Mission High School PA system/ painting and flooring
Agency Name: San Francisco Unified School District Project City: San Francisco, CA
Hazardous material abatement, Flooring, Drywall, Painting, Electrical, Plumbing and
HVAC.
Plans and specs can be found at: Ford Graphics - San Francisco (415)537.2200 SFPlanwell@FordGraphics.com
Contact: Jim Mazet
E.F. Brett and Company, Inc. - General Contractors PO Box 96, Woodacre Ca 94973
Fax 415.524.8349 Phone 415.524.8351
Email jimm@efbrett.com
To Place an Out Reach Ad Please Contact
janet@marinba.org
Deadline for Outreach Ad is Tuesday for the following Monday publish date.
PROJECT BID SCHEDULE
Bid List Subject to Change Prior To Bid Date, Please Check With Association
Monday, October 25, 2010
SAN FRANCISCO2:00 PM 10/25/2010Bid Date:
Plan#: 929 HUNTERS VIEW PHASE 1 BLOCKS 4, 5 & 6
10-00929
Addenda: 6 10/19/2010
Project Type: CONSTRUCTION/SITE WORK
Contact: NIBBI BROTHERS 415-863-1820
WOODACRE
11:00 AM 10/25/2010Ref #: 1630
Bid Date:
Prebid Conf: MAND 10/15/10 10:00 AM
INSTALLATION OF PROTECTIVE COATING ON CONCRETE AND STEEL, INSTALLATION OF FILTER VALVES AND OTHER MECHANICAL WORK
Plan#: 948
SAN GERONIMO TREATMENT PLANT CLARIFIER #2 COATING PROJECT
10-00948
Addenda: 1 10/6/2010Project Type: INSTALLATION
Contact: MARIN MUNICIPAL WATER DISTRICT 415-945-1557
WINDSOR
5:00 PM 10/25/2010Bid Date:
REQUEST FOR PROPOSALS TO PROVIDE ENGINEERING DESIGN AND CONSTRUCTION MANAGEMENT SERVICES TO PROVIDE A CLASS 2 BICYCLE LANE BETWEEN REIMAN LANE AND THE TOWN CORP YARD
Plan#: 956 WINDSOR ROAD BICYCLE LANE AT POND 7 PROJECT
10-00956
to $250000Addenda: 0Project Type: BIKE LANES
Contact: WINDSOR, TOWN OF/ENGINEERING 707-838-5340
Tuesday, October 26, 2010
DALY CITY
2:00 PM 10/26/2010Bid Date:
Prebid Conf: 10/5/10 10:30 AM
REMOVAL OF EXISTING HVAC EQUIPMENT AND APPUTENANCES AND THE INSTALLATION OF NEW HVAC EQUIPMENT AND APPURTENANCES, ASSOCIATED ELECTRICAL, MECHANICAL AND STRUCTURAL MODIFICATIONS, SYSTEM TESTING, BALANCING AND FEDERAL REPORTING.
Plan#: 907
CIVIC CENTER SOUTH HVAC (ENERGY RETROFIT) REPLACEMENT 271 - 92ND STREET
10-00907
Est. Cost: $680000Addenda: 1 10/14/2010Project Type: HVAC
Contact: DALY CITY -CITY ENGINEER 650-991-8264
FAIRFIELD
2:00 PM 10/26/2010Bid Date:
Prebid Conf: MAND 10/11/10 9:00 AM
LANDSCAPE MAINTENANCE AT 9 LOCATIONSPlan#: 924
LANDSCAPE MAINTENANCE FOR VARIOUS PUBLIC FACILITIES
10-00924
Est. Cost: $120000Addenda: 1 9/29/2010
Project Type: LANDSCAPE MAINTENANCE
SAN FRANCISCO
2:00 PM 10/26/2010Bid Date:A SAN FRANCISCO REDEVELOPMENT AGENCY PROJECTPlan#: 927
VETERANS COMMONS FIRE SPRINKLER AND ELEVATOR
10-00927
Project Type: FIRE SPRINKLER & ELEVATOR
Prebid Conf: 10/12/10 1:00 PMAddenda: 0
Contact: CAHILL CONTRACTORS 415-986-0600
HERCULES
2:00 PM 10/26/2010Ref #: 0904
Bid Date:
Prebid Conf: MAND 10/7/10 1:30 PM
TRADE PACKAGE N: SITE UTILITIES AND EXTERIOR IMPROVEMENTS
Plan#: 928
SYCAMORE DOWNTOWN NORTHSIDE MIXED-USE DEVELOPMENT
10-00928
Est. Cost: $1030000Addenda: 1 10/20/2010Project Type: IMPROVEMENTS
Contact: OLIVER & COMPANY 510-412-9090
SAN RAFAEL
2:30 PM 10/26/2010Ref #: CAP-10008
Bid Date:
Prebid Conf: 10/19/10 11:00 AM
DEMOLITION, REMOVAL AND REPLACEMENT OF PLUMBING FIXTURES, CERAMIC TILE AND BATHROOM ACCESSORIES
Plan#: 931
120 NORTH REDWOOD RESTROOM ACCESSIBILITY MODIFICATIONS
10-00931
Est. Cost: $80000Addenda: 0Project Type: RESTROOMS
Contact: MARIN COUNTY DEPT. OF PUB WORKS 415-499-7877
BOONVILLE
2:00 PM 10/26/2010Ref #: 120298
Bid Date:
Prebid Conf: MAND 10/5/10 10:00 AM
DEMOLITION, CONSTRUCTION OF A NEW REPLACEMENT 2-ENGINE FOREST FIRE STATION INCLUDING A 14-BED BARRACKS/MESS HALL BUILDING, A 3-BAY APPARATUS BUILDING, A DOZER SHED, AN OFFICE BUILDING, A WATER STORAGE TANK, SITE WORK, PAVING, LANDSCAPING AND OTHER RELATED
Plan#: 938
BOONVILLE FOREST FIRE STATION REPLACE FACILITY
10-00938
Addenda: 0Project Type: FIRE STATION
Contact: CALIFORNIA, DOGS-RESD-PSB-CSS 916-376-1688
NOVATO
2:00 PM 10/26/2010Ref #: 209-062-6100-
10
Bid Date:
Prebid Conf: 10/12/10 10:00 AM
DEMOLITION AND CLEARING, EARTHWORK, ASPHALT PAVING AND ASSOCIATED WORK
Plan#: 947
ASPHALTIC CONCRETE PAVING WORK AT THE RANCHO ELEMENTARY SCHOOL
10-00947
Addenda: 2 10/15/2010Project Type: PAVING
Contact: NOVATO UNIFIED SCHOOL DIST 415-885-5873Contact: NOVATO UNIFIED SCHOOL DIST 415-898-2859Contact: MARSHALL/LEE INC ARCHITECTS 415-509-8766
SAN RAFAEL
10:00 AM 10/26/2010Ref #: Proj. No. 11159
Bid Date:
Work includes install of a new tennis and basketball court, new sidewalk curb and gutter, re-grading and paving asphalt pathways and parking lot, and install of a curb ramp to comply with the current ADA requirements.
Plan#: 952
SANTA MARGARITA PARK TENNIS & BASKETBALL COURT RENOVATION (REBID)
10-00952
Addenda: 1 10/15/2010Project Type: PARKS-RECREATION
Contact: SAN RAFAEL, CITY OF, D.P.W. 415-485-3355
DAVIS2:00 PM 10/26/2010
Ref #: 9541400Bid Date:Plan#: 959 VET MED 3B BUILDING
10-00959
Est. Cost: $56156Addenda: 10 10/18/2010
Project Type: SCHOOL
Contact: U.C. DAVIS DESIGN AND CONSTRUCTION MANAGEMENT 530-754-0116
Wednesday, October 27, 2010
MOUNTAIN VIEW
2:00 PM 10/27/2010Ref #: 09-23
Bid Date:
INSTALLATION OF WIRELESS AND SOLAR-POWERED IRWLS, SIGNING, STRIPING, CURB RAMP, MEDIAN ISLAND, INSTALL SOLAR RADAR FEED-BACK SIGNS
Plan#: 941
IN-ROADWAY WARNING LIGHT ON SHOWERS DRIVE AT LATHAM STREET
10-00941
Est. Cost: $70000to $100000
Addenda: 0Project Type: INSTALLATION
Contact: MOUNTAIN VIEW PUB WORKS 650-903-6311
SUISUN CITY
2:00 PM 10/27/2010Bid Date:
INSTALL AND COMPLETE FOUR SOLAR-POWERED SPEED RADAR SIGN ASSEMBLIES INCLUDING POSTS, FOUNDATIONS, RADAR DETECTION AND SPEED DISPLAY SIGNS, SOLAR PANELS AND BATTERIES WITH ENCLOSURE BOXES
Plan#: 946 SPEED RADAR SIGNS ON PINTAIL DRIVE
10-00946
Est. Cost: $30000to $40000
Addenda: 0Project Type: SIGNAGE
Contact: SUISUN CITY D.P.W. 707-421-7340
PITTSBURG
10:00 AM 10/27/2010
Ref #: 2010-18
Bid Date:
FURNISH TREES, PLANS, SHRUBS, IRRIGATION PIPE, VALVES, SOLENOIDS, BATTERY OPERATED IRRIGATION CONTROLLERS, FIELD TRANSMITTERS, REPLACE CHAIN LINK FENCE AND GATES, HYDROSEED AND ALL INCIDENTALS TO COMPLETE SITE WORK INCLUDING CONSTRUCTION SIGNAGE, PLANTING
Plan#: 949 KIRKER CREEK MITIGATION PROJECT
10-00949
Addenda: 0
Project Type: WATERWAY IMPROVEMENTS
Contact: PITTSBURG, CITY OF, ENGINEERING 925-252-4930
OAKLAND
2:15 PM 10/27/2010Ref #: 07078
Bid Date:
Prebid Conf: MAND 10/12/10 11:00 AM
PRE-QUALIFIED BIDDERS ONLY: SITE WORK FOR PORTABLE PAD, INTRUSION ALARM, FIRE ALARM, WATER/SEWER, PHONE, ELECTRICAL, DATA, DEMO AND BUILD OUT OF AN INTERIOR
Plan#: 957 ELMHURST MIDDLE SCHOOL WELLNESS CENTER
10-00957
Est. Cost: $400000Addenda: 0Project Type: SCHOOL
Contact: OAKLAND U.S.D. FACILITIES PLANNING & MGT. 510-879-8640
OAKLAND
2:00 PM 10/27/2010Ref #: 07075
Bid Date:
Prebid Conf: MAND 10/12/10 10:00 AM
PRE-QUALIFIED BIDDERS ONLY: SITE WORK FOR PORTABLE PAD. RETAINING WALL. INTRUSION ALARM, FIRE ALARM, WATER/SEWER, PHONE, ELECTRICAL, DATA, SETTING/RELOC PORTABLE, DEMO, AND BUILD OUT OF AN INTERIOR
Plan#: 958 SKYLINE HIGH SCHOOL WELLNESS CENTER
10-00958
Est. Cost: $400000Addenda: 0Project Type: SCHOOL
Contact: OAKLAND U.S.D. FACILITIES PLANNING & MGT. 510-879-8640
SAN FRANCISCOPAVING, ELECTRICAL AND RAFFIC ROUTING INCLUDING DEMOLITION, EXCAVATION, CURB RAMPS AWSS CISTERN RING
Plan#: 961 VARIOUS LOCATIONS PAVEMENT RENOVATION #14
10-00961
2:30 PM 10/27/2010Ref #: 1724J
Bid Date:AND OTHER RELATED WORK
Est. Cost: $2600000Addenda: 0Project Type: RENOVATION
Contact: SAN FRANCISCO DPW 415-554-8280
Thursday, October 28, 2010
SALIDA
2:00 PM 10/28/2010Ref #: HH-935B
Bid Date:
Prebid Conf: 9/30/10 1:30 PM
PRE-QUALIFIED BIDDERS ONLY. CONSTRUCT A 78-INCH DIAMETER PIPELINE TOTALING 11 MILES
Plan#: 874 SAN JOAQUIN PIPELINE SYSTEM-WESTERN SEGMENT
10-00874
Est. Cost: $60000000to $70000000
Addenda: 2 10/19/2010Project Type: PIPELINE
Contact: SAN FRANCISCO PUBLIC UTILITIES 415-551-4603
SAN RAFAEL
2:00 PM 10/28/2010Ref #: CAP-10012
Bid Date:
Prebid Conf: MAND 10/18/10 9:00 AM
Remodeling of 3 bathrooms within the detention area of Juvenile Hall, the addition of a toilet sink unit in an existing cell and one restroom remodel in the cafeteria.
Plan#: 922 JUVENILE HALL ACCESSIBILITY UPGRADES
10-00922
to $120000Addenda: 1 10/12/2010Project Type: RESTROOMS
Contact: MARIN, COUNTY OF ,D.P.W. 415-499-7877
LIVERMORE
2:00 PM 10/28/2010Ref #: 11-04
Bid Date:
Prebid Conf: MAND 10/7/10 10:00 AM
PRE-QUALIFIED BIDDERS ONLYPlan#: 925
NEW SCIENCE BUILDING & GENERAL ALTERATIONS TO BUILDING 1800 LAS POSITAS COMMUNITY COLLEGE
10-00925
Est. Cost: $11000200Addenda: 2 10/20/2010Project Type: ALTERATIONS
Contact: CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT 925-485-5287
DAVIS
2:00 PM 10/28/2010Ref #: C.I.P. 8129
Bid Date:
PURCHASE AND INSTALLATION OF A FULLY AUTOMATIC PRESSURE-TYPE MANGANESE REMOVAL FILTRATION SYSTEN AND SITE IMPROVEMENTS
Plan#: 940
MANGANESE TREATMENT SYSTEM PROJECT, WELL NO.32
10-00940
Est. Cost: $2700000Addenda: 1 10/18/2010Project Type: WATER-POWER
Contact: DAVIS PUBLIC WORKS DEPT. 530-757-5686
LARKSPUR
11:00 AM 10/28/2010Ref #: 500-2008-019-
240-010
Bid Date:
Prebid Conf: 10/19/10 10:30 AM
CONSTRUCTION OF A CONCRETE STAIRWAY/PATHWAY WITH RAILINGS, LIGHTING, DRAINAGE AND SIGNAGE BETWEEN LOCUST AND MAGNOLIA AVENUES WITHIN AN EXISTING PATHWAY AND ANCILLARY WORK
Plan#: 954 POST STREET STAIRS
10-00954
Addenda: 1 10/14/2010Project Type: PUBLIC WORKS
Contact: LARKSPUR, CITY OF, D.P.W. 415-927-5017
LARKSPUR
11:30 AM 10/28/2010Ref #: 500-2008-010-
240-002
Bid Date:
Prebid Conf: 10/19/10 11:00 AM
CONSTRUCTION OF A CONCRETE STAIRWAY/PATHWAY WITH RAILINGS, LIGHTING, DRAINAGE AND SIGNAGE WITHIN AN EXISTING PATHWAY AND ANCILLARY WORK
Plan#: 955 ELM AVENUE STAIRS
10-00955
Addenda: 1 10/14/2010Project Type: PUBLIC WORKS
Contact: LARKSPUR, CITY OF, D.P.W. 415-927-5017
Friday, October 29, 2010
MARIN COUNTY
4:00 PM 10/29/2010Bid Date:
CONTRACT PROPOSAL FOR SCADA SYSTEM SERVICES ON AN AS NEEDED BASIS WITHIN A SPECIFIC TIME FRAME AT 20 SITES
Plan#: 970
SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) PROJECT
NEW10-00970
Addenda: 0Project Type: SEWER/SANITATION
Contact: ROSS VALLEY SANITARY DISTRICT 415-259-2949
Tuesday, November 02, 2010
ANAHEIM
2:00 PM 11/2/2010
Ref #: 5930-00
Bid Date:WALMART SUPERCENTER NO. 5930-00
Plan#: 977 ONLINE
WALMART SUPERCENTER NO. 5930-00NEW10-00977
Addenda: 0
Project Type: NEW CONSTRUCTION AND REMODEL
Contact: ROCHE CONSTRUCTORS INC 702-252-3611
Wednesday, November 03, 2010
OAKLAND
2:00 PM 11/3/2010Ref #: #07047-3 &
#07076
Bid Date:
Prebid Conf: MAND 10/13/10 10:00 AM
PRE-QUALIFIED BIDDERS ONLY: CONSTRUCTION OF LA ESCUELITA ELEMENTARY SCHOOL & GREAT ROOM BUILDING AND DOWNTOWN HEALTH CLINIC.
Plan#: 960
DOWNTOWN EDUCATIONAL COMPLEX-PHASE 1, INCREMENT 2
10-00960
Est. Cost: $28000000Addenda: 0Project Type: NEW CONSTRUCTION
Contact: OAKLAND USD FAC. PLANNING & MANAGEMENT 510-879-2959
Thursday, November 04, 2010
PACIFICA
2:00 PM 11/4/2010Ref #: 1116-300
Bid Date:
Prebid Conf: 9/23/10 10:00 AM
CONSTRUCT A RECYCLED WATER PUMP STATION WITH ELECTRICAL AND RECYCLED SOURCE WATER CONNECTIONS TO THE EXISTING CALERA CREEK WASTEWATER TREATMENT FACILITY
Plan#: 886
PACIFICA RECYCLED WATER PROJECT PUMP STATION AND TANK
10-00886
Est. Cost: $3000000Addenda: 3 10/18/2010Project Type: PUMP STATION
Contact: NORTH COAST COUNTY WATER DISTRICT 650-852-2800
SAN FRANCISCO
2:00 PM 11/4/2010Ref #: Contract No.
WW-495
Bid Date:
Prebid Conf: 10/21/10 @ 10:00 a.m.
To replace the existing sewer and street pavement on the subject streets.Plan#: 953
BUSH STREET SEWER REPLACEMENT/REHABILITATION AND PAVEMENT RENOVATION
10-00953
to $1900000Addenda: 0Project Type: REPLACEMENT
Contact: SAN FRANCISCO PUBLIC UTILITIES COMMISSION 415-551-4603
OAKLANDCONCRETE REPAIR OF BRIDGE ABUTMENT, DRILL AND BOND, CLEANING REBARS AND PATCHING DAMAGED CONCRETE BARRIER, REPAIR OF DAMAGED FENCE AND RAILING, REPLACEMENT OF EXPANSION JOINT, SEALING CONCRETE DECK, PAINTING RAILING AND JOINTS AND OTHER MINOR CONCRETE
Plan#: 969 SEISMIC RETROFIT OF PARK BLVD. VIADUCTS
NEW10-00969
2:00 PM 11/4/2010Ref #: C346910
Bid Date:
Prebid Conf: MAND 10/13/10 10:30 AM
WOR
Est. Cost: $1880000Addenda: 0Project Type: SEISMIC RETRO
Contact: OAKLAND PUBLIC WORKS AGENCY, D.E.& C. 510-238-6605
WINDSOR
3:00 PM 11/4/2010Ref #: 49-133
Bid Date:
Prebid Conf: MAND 10/20/10 3:00 PM
CONSTRUCTION OF NEW MUSIC BUILDING AND ADJACENT SITE IMPROVEMENTS TO COMPLY WITH 2007 TITLE 24 ACCESSIBILITY REQUIREMENTS
Plan#: 971
MUSIC CLASSROOM BUILDING AT WINDSOR MIDDLE SCHOOL
NEW10-00971
Addenda: 0Project Type: SCHOOL
Contact: WINDSOR UNIFIED SCHOOL DISTRICT 707-837-7700
Tuesday, November 09, 2010
MARIN COUNTY
2:00 PM 11/9/2010Bid Date:
Prebid Conf: MAND 8/26/10 10:00AM
San Quentin Condemned Inmate Complex - Construction Package 1
Bid Package 1 - Demolition, Hazardous Material Remediation & Site GradingBid Package 2 - Site Utilities and Miscellaneous ImprovementsBid Package 3 - Housing, Guard Towers & Sitewide Har
Plan#: 835
SAN QUENTIN CONDEMNED INMATE COMPLEX - ONLINE ONLY
10-00835
to $165000000Addenda: 5 10/13/2010Project Type: PRISON
Contact: KITCHELL CEM 916-442-6996Contact: CALIFORNIA DEPAT OF CORRECTIONS 999-999-9999Contact: HELLMUTH, OBATA & KASSABAUM 415-243-0555Contact: WINSLOW REPROGRAPHICS 916-921-9311
VALLEJO
2:00 PM 11/9/2010Ref #: 110316
Bid Date:
WORK INCLUDES REPLACING 5 MANHOLES, PROPERTY RESTORATION, TRAFFIC CONTROL AND SURFACE RESTORATION
Plan#: 963 MANHOLE REPLACEMENT PROJECT
10-00963
Est. Cost: $35000to $50000
Addenda: 0Project Type: REPLACEMENT
Contact: VALLEJO SANITATION AND FLOOD CONTROL DISTRICT 707-644-8949
PALO ALTO
2:00 PM 11/9/2010Bid Date:
Project 640-378 - Mental Health Training Center and Project 640-10-208P Relocation of Commemorative Rose Garden VA Palo Alto Health Care System
Plan#: 965-ONLINE
VA PALO ALTO MENTAL HEALTH CARE SYSTEM10-00965
Addenda: 2 10/19/2010Project Type: IMPROVEMENTS
Contact: ROCHE CONSTRUCTORS INC 702-252-3611
SAN FRANCISCO
2:00 PM 11/9/2010Ref #: 11043
Bid Date:
Prebid Conf: MAND 10/28/10 @ 3:00PM
CLEVELAND ELEMENTARY SCHOOL NEW DESIGN BUILD CLASSROOM BUILDING, PROJECT NO: 11043TO ORDER PLANS: FORD GRAPHICS 415-537-2200Design of a new modular classroom building; preparation of documents for DSA review and approval; construction of a new modular
Plan#: 980-ONLINE
CLEVELAND ELEMENTARY SCHOOL NEW DESIGN BUILD CLASSROOM BUILDING-ONLINE ONLY
NEW10-00980
to $400000Addenda: 0Project Type: SCHOOL
Contact: SAN FRANCISCO UNIFIED SCHOOL DISTRICT 415-241-
6152
Wednesday, November 10, 2010
CLOVERDALE
2:00 PM 11/10/2010
Ref #: 120299
Bid Date:
Prebid Conf: MAND 10/19/10 10:00 AM
CONSTRUCT 12-BED BARRACKS/MESSHALL, 3-BAY APPARATUS BUILDING, A STORAGE BUILDING, AND AN EMERGENCY GENERATOR SHELTER. PROJECT TO INCLUDE HAZMAT ABATEMENT, REPAVING, LANDSCAPING, UTILITIES, FENCING AND DEMOLITION OF EXISTING BUILDINGS.
Plan#: 962
CLOVERDALE FOREST FIRE STATION REPLACE FACILITY
10-00962
Addenda: 0
Project Type: DEMOLITION AND RECONSTRUCTION
Contact: CLAIFORNIA D.O.G.S.-R.S.D.-P.M.B. 916-376-1688
NAPA
2:00 PM 11/10/2010Ref #: CIP 5506
Bid Date:
Prebid Conf: MAND 10/27/10 2:00 PM
FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES FOR THE CONSTRUCTION OF IMPROVEMENTS
Plan#: 964
NAPA STATE HOSPITAL RECYCLED WATER PIPELINE PROJECT
10-00964
Est. Cost: $3800000Addenda: 0Project Type: PUBLIC IMPVS
Contact: NAPA SANITATION DISTRICT 707-258-6000
ALAMEDA
2:00 PM 11/10/2010Ref #: P.W. 09-10-22
Bid Date:
Prebid Conf: 10/28/10 9:00 AM
FURNISH ALL LABOR, TOOLS, EQUIPMENT, MATERIALS AND DOING ALL WORK ASSOCIATED WITH THE DELIVERY OF FUEL TO VARIOUS LOCATIONS AS SPECIFIED
Plan#: 966 ANNUAL FUEL DELIVERY
10-00966
Addenda: 0Project Type: FUEL DELIVERY
Contact: ALAMEDA, CITY OF, DEPT. OF PUBLIC WORKS 510-749-5840
SAN FRANCISCO2:30 PM 11/10/2010
Ref #: 2035D-3Bid Date:
Prebid Conf: 10/26/10 10:30 AM
Plan#: 978 AS-NEEDED SIDEWALK INSPECTION AND REPAIR
NEW10-00978
Est. Cost: $1500000Addenda: 0Project Type: REPAIRS
Contact: SAN FRANCISCO, CITY AND COUNTY 415-554-5797
Friday, November 12, 2010
SAN FRANCISCO
2:00 PM 11/12/2010Ref #: WD-2583
Bid Date:
Prebid Conf: 10/21/10 10:00 AM
CEMENT MORTAR LINE AND INSTALL CATHODIC PROTECTION FOR 10,000 LF OF EXISTING STEEL MAIN
Plan#: 950
CEMENT MORTAR LINE AND INSTALL CATHODIC PROTECTION FOR 60-INCH STEEL WATER MAIN IN 28TH AVENUE AND KIRKHAM STREET
10-00950
Est. Cost: $2300000Addenda: 0Project Type: WATER-POWER
Contact: SAN FRANCISCO PUBLIC UTILITIES COMMISSION 415-551-4603
Tuesday, November 16, 2010
VACAVILLE
2:00 PM 11/16/2010Bid Date:DENITRIFICATION IMPROVEMENTSPlan#: 968
REQUEST FOR PREQUALIFICATION OF BIDDERS FOR THE EASTERLY WASTEWATER TREATMENT PLANT TERTIARY PROJECT
NEW10-00968
Est. Cost: $32000000Addenda: 0
Project Type: WATER TREATMENT PLANT
Contact: VACAVILLE DPW ENGINEERING SERVICES 707-449-5170
SONOMA COUNTY
11:00 AM 11/16/2010
Ref #: 0-83-7#01A
Bid Date:
Prebid Conf: MAND 10/26/10 10:00 AM
CONSTRUCTION OF A 4,000 SF MEZZANINE SYSTEM WHICH INCLUDES STRUCTURAL STEEL COLUMNS, BEAMS, FASTENERS, ACCESSORIES, STAIRS AND RAILINGS
Plan#: 972
1315 AIRPORT BOULEVARD TENANT IMPROVEMENTS (MEZZANINE SYSTEM)
NEW10-00972
Est. Cost: $125000to $150000
Addenda: 0
Project Type: TENANT IMPROVEMENTS
Contact: SONOMA COUNTY WATER AGENCY 707-547-1900
SAN FRANCISCO
3:00 PM 11/16/2010Bid Date:
Prebid Conf: 10/28/10 10:30 AM
DEMOLITION, CONCRETE, STRUCTURAL STEEL & METAL STAIRS, ALUMINUM CURTAINWALL & STOREFRONTS, PLUMBING, FIRE PROTECTION, HVAC AND ELECTRICAL
Plan#: 976 METREON MALL RENOVATION
NEW10-00976
Addenda: 0Project Type: RENOVATION
Contact: WESTFIELD CONSTRUCTION, LLC 707-399-1940
Wednesday, November 17, 2010
REDWOOD CITY
2:00 PM 11/17/2010Bid Date:
PORT SECURITY LIGHTING, CLOSED CIRCUIT TELEVISION (CCTV) AND TRANSPORTATION WORKER IDENTIFICATION CREDENTIAL (TWIC) PROJECTPLANS AND SPECS FROM R.A.N. ELECTRIC CO.General Scope of Work: The work consists of*Furnish, install, test and provide a fully
Plan#: 914
PORT SECURITY LIGHTING, CLOSED CIRCUIT TELEVISION (CCTV) AND TRANSPORTATION WORKER IDENTIFICATION CREDENTIAL (TWIC) PROJECT-ONLINE ONLY
10-00914
Addenda: 0Project Type: ELECTRICAL
Thursday, November 18, 2010
OAKLAND
2:00 PM 11/18/2010Ref #: C389410
Bid Date:
Prebid Conf: MAND 10/27/10 10:30 AM
CONSTRUCTION OF NEW ON-STREET BIKEWAYSPlan#: 973 CITYWIDE BIKEWAYS ARRA-DOE 2011
NEW10-00973
Est. Cost: $161097Addenda: 0Project Type: BIKE LANES
Contact: OAKLAND PUBLIC WORKS AGENCY 510-238-7049
VALLEJO
2:00 PM 11/18/2010Bid Date:
Prebid Conf: 11/9/10 2:00 PM
WORK INCLUDES REMOVING AND REPLACING ASPHALT CONCRETE SURFACE, COLD PLANING, TRAFFIC STRIPING, SIDFEWALKS AND HANDICAP CURB RAMP REPLACEMENT, REPLACE STREET LIGHT LUMINARIES
Plan#: 979
COUNTRY CLUB CREST STREET IMPROVEMENT PROJECT
NEW10-00979
Addenda: 0Project Type: STREET IMPVS
Contact: VALLEJO, CITY OF, D.P.W. 707-648-4315
Wednesday, December 08, 2010
SAN FRANCISCOPREQUALIFIED DESIGN-BUILD BIDDERS ONLY.Plan#: 974
SAN FRANCISCO MARINA WEST HARBOR RENOVATION (DESIGN-BUILD)
NEW10-00974
Classified A
ds
EMPLOYMENT
• ESTIMATOR & TAKE-OFF ENGINEER Ghilotti Bros., Inc. seeks an experienced Estimator and Take-off Engi-neer. CM degree desired AGTEK and Hard Dollar a plus. This is an ex-cellent opportunity with an excellent company, competitive pay. Email resume to apply@ghilottibros.com.
FOR SALE
• CABINET SHOP 1200sq foot location in Novato area( Bell Marin Keys), set up with 3 phase electric to handle: Dustvent Cyclone dust collector. AEM 43" All American 4-j wood wide belt Sander,4'x12' Hydrolic Clamping Table, 10" HD Table Saw, Compressor, Chop saw, 4" edge sander, 2 headed drilling tub, 1" Hammer shaper with many custom cutters, and much more. This is GREAT opportunity to start your own Cabinet Making future" All units are installed and were purchased new and have light duty hours. Take over lease ( approx ) $1,000.00 per month and purchase above listed equipment.($12,500) Call Bob Jonsen if interested @ 415-302-6754
FOR LEASE—RENT
• INDUSTRIAL YARD & OFFICE FOR RENT/LEASE +/- 1 acre yard (acreage negotiable) includes +/-550 sq. ft. clean office trailer that is high speed internet capable with bathroom & 2000 sq. ft. asphalt parking area; gravel and asphalt yard zoned M-3 Heavy Indus-trial; full security system including gate & fencing in place; short drive from San Rafael Bridge in Richmond off Castro street on Hensley. $3,970/month. Call Don at 510.215.9338
• OFFICE RENTAL - “EXECUTIVE SUITE” Class A space. Four Offices from 75 to 130 SF Central Downtown San Rafael, Great Views $900 to $1,300 monthly
Included: Supplies storage, file storage. One covered parking space per office Full Service, utilities and janitorial
Shared: Conference Room, 140 SF Building Code Library, 200 Volumes Kitchen / Break Room, 80 SF Central Admin Space, 375 SF High-speed internet and wi-fi
Optional: Admin Services Phones and phone answering Copier, color, 11 x 17 Server, electronic storage, retrieval, backup Office Furniture
Construction professionals preferred. officespace@donleycc.com 415 456 9242
Please advise if position is filled or commodity is sold.
janet@marinba.org
Marin Builders Association Safety Topics
Company: _____________________________________________________ Date: _____________________ Meeting Attended By: ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Special Concerns for Current Site: ______________________________________________________________________________________ Comments: _____________________________________________________________________________________________________ Supervisor’s Signature: ___________________________________________________________________
EXCAVATIONS An excavation is any man-made cut, cavity, hole, trench or depression made in the earth’s surface by the removal of soil. Workers in excavations can be exposed to cave-ins, engulfment, hazardous atmospheres and falls. Excavation safety training and procedures prevent serious injuries and accidents.
Before work on an excavation can begin, surface hazards such as unstable buildings, sidewalks, etc. that could endanger employees must be secured or removed. Hazards below the ground must also be identified and made safe before work can begin. At least 2 days before the excavation, contact private utility companies and USA North / Common Ground Alliance (CGA) at 811 or 1-800-227-2600 to see if there are buried pipes or utilities in the planned work area. Follow work procedures that avoid disturbing these installations during excavation.
Excavations near sewers, landfills, chemical plants, and storage tanks for hazardous materials may have hazardous atmospheres. Excavations require inspection for hazardous atmospheres like low oxygen levels, high chemical concentrations, and/or flammable/explosive gases. Excavations deeper than 4 feet need to have atmospheric testing. If there are atmospheric hazards present or they could be present, ventilation, respiratory protection, and rescue equipment must be provided for worker safety.
Signs of soil distress near an excavation may indicate collapse or cave-in dangers. Fissures, cracks, or sagging/slumping materials from the open face of the excavation can indicate a hazard. Bulges at the excavation bottom, sinking at the edge, and small amounts of dirt and rock falling into the excavation are also signs of instability.
If the excavation is more than 5 feet deep, it needs a permit from Cal/OSHA and there needs to be a protective system (benching, shoring, sloping, etc.) in place to protect the workers inside. For excavations more than 4 feet deep, there needs to be a way to enter and exit the work area at least every 25 feet via a ladder, ramp, or other sturdy device.
Excavation inspections are required before work starts, during work shifts, and after rainstorms. A competent person that is familiar with excavation regulations and safety systems, how to type soils, and how to recognize excavation hazards must do these inspections. Inspectors should look for signs of cave-ins, failing protective systems, and potentially hazardous atmospheres. If hazards are found, workers should exit the excavation until the work area is made safe.
To protect workers from falling soil and rocks during excavation operations, perform maintenance scaling of the open excavation face to remove loose rocks from the excavation face. Use protective shields and retaining fences to hold back loose material. Keep spoils, supplies, equipment, vehicles, and workers at least two feet from the working edge.
Avoid working in excavations that hold or accumulate water. If work MUST be done in this situation, use protective shield systems, pumping devices, and harnesses with safety lines as added protection. The pumping system must be monitored by a competent person. Diversion systems and dikes can be used to re-direct flowing and encroaching water sources
Marin Builders Association Safety Topics
Company: _____________________________________________________ Date: _____________________ Meeting Attended By: ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Special Concerns for Current Site: ______________________________________________________________________________________ Comments: _____________________________________________________________________________________________________ Supervisor’s Signature: ___________________________________________________________________
EXCAVACIONES Una excavación es cualquier corte, cavidad, hoyo, zanja o depresión hecha por el hombre en la superficie de la tierra mediante la extracción de suelo. Los trabajadores en excavaciones pueden estar expuestos a desmoronamientos, quedar sepultados, atmósferas peligrosas y caídas. La capacitación y los procedimientos de seguridad de excavación previenen lesiones y accidentes graves.
Antes de que pueda comenzar el trabajo en una excavación, será necesario asegurar o retirar los peligros en la superficie como construcciones inestables, aceras, etc. que pudiesen poner en peligro a los empleados. También será necesario identificar y asegurar los peligros abajo del nivel de rasante antes de comenzar el trabajo. Al menos 2 días antes de la excavación, comuníquese con las compañías privadas de suministro eléctrico y con USA North / Common Ground Alliance (CGA) llamando al 811 o al 1-800-227-2600 para verificar si existen tuberías o cables eléctricos enterrados en el área de trabajo propuesta. Siga los procedimientos de trabajo que eviten perturbar estas instalaciones durante la excavación.
Las excavaciones cerca de tuberías de drenaje, rellenos, plantas químicas, y tanques de almacenamiento de materiales peligrosos pueden tener atmósferas peligrosas. Las excavaciones requieren inspección para verificar la presencia de atmósferas peligrosas como niveles bajos de oxígeno, concentraciones elevadas de productos químicos, y/o gases inflamables o explosivos. Deben realizarse pruebas atmosféricas en todas las excavaciones mayores de 4 pies. Si existe la presencia o la probabilidad de que existan peligros atmosféricos, será necesario suministrar ventilación, protección respiratoria y equipo de rescate para la seguridad del trabajador.
Los signos de perturbación en el suelo cerca de una excavación pueden ser indicio de peligros de colapso o desmoronamientos. Las fisuras, las grietas, o los materiales con hundimientos/desplomes de la superficie abierta de la excavación pueden indicar un peligro. Los abultamientos en el fondo de la excavación, hundimientos en los bordes y pequeñas cantidades de tierra y roca que caen hacia la excavación son también signos de inestabilidad.
Si la excavación es mayor de 5 pies, es necesario obtener un permiso de Cal/OSHA y es necesario instalar un sistema de protección, rellanos, taludes, ademado, etc. en el sitio para proteger a los trabajadores en el interior. Para excavaciones mayores de 4 pies, deberá haber un medio para entrar y salir del área de trabajo en al menos cada 25 pies a través de una escalera, rampa u otro dispositivo robusto.
Es necesario realizar inspecciones de la excavación antes de que comience el trabajo, durante los turnos de trabajo, y después de las tormentas. Estas inspecciones deberá realizarlas una persona competente que esté familiarizada con las normativas de excavación y con los sistemas de seguridad, con las técnicas de clasificación de suelos, y con la detección de riesgos en las excavaciones. Los inspectores deberán buscar signos de desmoronamientos, sistemas protectores defectuosos y atmósferas potencialmente peligrosas. Si se encuentran peligros, los trabajadores deberán salir de la excavación y no ingresar al área de trabajo antes de que sea seguro hacerlo.
Para proteger a los trabajadores contra el suelo y rocas que caen durante las operaciones de excavación, lleve a cabo labores de rascado en la pared de la excavación abierta para eliminar las rocas sueltas de dicha pared de la excavación. Use pantallas protectoras y cercas de retención para retener el material suelto. Mantenga los trabajadores, las acumulaciones de material, los suministros, los equipos y los vehículos a una distancia mínima de dos pies del borde de trabajo.
Evite trabajar en excavaciones que retengan o acumulen agua. Si es IMPERATIVO trabajar en esta situación, use sistemas de pantallas protectoras, dispositivos de bombeo y arneses con líneas de rescate como protección adicional. El sistema de bombeo debe ser monitoreado por una persona competente. Los sistemas de desviación y diques pueden utilizarse para cambiar el curso y cauce de las fuentes de agua.
WATER WATCH Marin Municipal Water District
Report On Water Levels, Use & Precipitation MMWD, serving Central and Southern Marin, reports on the following
supply sources, reservoir levels, precipitation and temperature for the week ending October 17, 2010
Consumption
Average million gallons/day
Average gallons/**capita/day
For Oct. 11 – Oct. 17, 2010 29.0 156.3
For same week in 2009 21.0 113.2
Storage Acre-feet (AF)* % of capacity
Total capacity of 7 reservoirs 79,566 100 %
Storage as of Oct. 17, 2010 61,453 77 %
Storage for this date last year 47,771 60 %
Average for this date 51,073 64 %
Our current storage (61,453 AF) is 120 % of the average storage (51,073 AF) for this date.
Supply Source
MMWD Reservoirs Average
million gallons/day
Russian River Average
million gallons/day
For Oct. 11 – Oct. 17, 2010 24.6 4.4
For same week in 2009 16.2 4.8
Rainfall At Lake Lagunitas (Rainfall Year Begins July 1)
Total To Date (inches)
Average Rainfall To Date
From July 1, 2010 – Oct. 17, 2010 0.17 2.15
From July 1, 2009 – Oct. 17, 2009 8.21
Temperature (at Corte Madera)
Average High Temperature (ºF)
For Oct. 11 – Oct. 17, 2010 82.9
For same week in 2009 71.1
*One acre-foot equals 325,851 gallons **Population of Fiscal Year 2000-2001 = 185,786