“Omsk Design Engineering Institute for petroleum and petrochemical
industries” “OMSKNEFTEKHIMPROEKT” Open Joint Stock Company
• February 17, 1953 Date of foundation
• 1, Еngineers Boulevard, Omsk, 644050, Russian Federation
Legal address
• 1, Еngineers Boulevard, Omsk, 644050, Russian Federation
Mailing address
• +7 (3812) 28-55-34Contact us
• +7 (3812) 28-55-44Fax
• postoffice@onhp.ru E-mail
2
Omsk (Central Office) Belgrade
Astana
Moscow
- currently existing ONHP branch offices
- Branch Offices to be established in 2015
- ONHP Representative Office in Atyrau
Beijing
ONHP branch offices
Nakhodka
3
Share of International Business Projects make 64%Engineering resources – 450 employees
Atyrau
Saint Petersburg
Engineering:
KBR (USA)
Sinopec Engineering(China)
Marubeni (Japan)
Tecnicas Reunidas(Spain)
JGC Corporation (Japan)
Technology Development:Technology Development:Technology Development:Technology Development:
AXENS (France)
CB&I Lummus(Czech Republic )
UOP (Great Britain)
Shell (USA)
Ineos
Foster Wheeler(USA)
ONHP has signed agreements with world leading engineering companies such as KelloggBrown & Root (Great Britain), Sinopec Engineering (China), CB&I Lummus Global (theNetherlands).
ONHP performs the design in accordance with international and European Codes andStandardsв (ASME, API, DIN, ANSI, EN)
Cooperation with International Companies
4
Pre-FEED FEED / “PD”, Detail Design Construction Operation
�Conceptual Project Basis;
�Pre-Feasibility Study;�Bankable Feasibility
Study;�Basic Engineering
(BDEP);�Basic Implementation
(Project Design); �Definitive
Implementaion(Detailed Design)
�FEED / PD Documentation development;
Design and Estimate Documentation expertise support as per local requirements of facility location; ITB/Bid Package Development for Contractor’s Work and Equipment Procurement;Performance of Engineering Survey (all types);Detailed Design Package Development;Optional Equipment Design Development; �Development of Reference
Standards for Construction Method Statements
ЕРСм services for new construction;
Apart:Schedule Control;
Project Budget Management;
Field and Engineering Supervision over Construction
�РМС services for reconstruction and modernization facilities, including field and engineering supervision;
Operation Manuals Development (Emergency Response Plans; Process and Engineering
Procedures)
Pre-Investment Phase Investment Phase Operation Phase
ONHP competence
5
For ЕРС Services ONHP is willing to share it with internat ional companies based on consortium
Equipment procurement
�Equipment procurement;
Equipment procurement
management and control;
�Engineering supervision over equipment manufacturing;
�Equipment forwarding
PreFEED Basic Engineering Design Packages
FEED, Design documentation
Detailed Design Documentation
Procurement Construction, pre-commissioning
Operation
Engineering, Equipment Procurement, Construction, ЕРС (Hard-& Software)
PIMS(AspenTech)
PIMS(AspenTech)
Refinery process diagram optimization based upon linear simulation taking into consideration market researches on product yield maximum increase
Production plan including sales
demands due to options in Plant operation mode
Aspen Icarus(AspenTech)
Economic evaluation of assumed solutions
SmartPlant P&ID
(Intergraph)Process Flow Diagrams for
processes
SmartPlant P&ID
(Intergraph)Process Flow Diagrams
updating at “Project” stage
SmartPlant 3D(Intergraph)
Layout decisions in 3D
SmartPlant P&ID
(Intergraph)Process Flow Diagrams updating
at “Detailed Design” stage
SmartPlant 3D(Intergraph)
Aspen Icarus(AspenTech)
Detalization of economic evaluation
SmartPlant
Materials
(Intergraph)
Orders development and processing
procedures, orders technical part
(requisition), Appendix to Contract (purchase
order)
SmartPlant 3D(Intergraph)
Physical model for all construction and installation assembly unit, isometrics.Control based upon laser
scanning
SmartPlant 3D
(Intergraph)Operating production
3D- Model
SmartPlant P&ID
(Intergraph)Process Flow Diagrams
for all processes
Aspen Icarus(AspenTech)
Analysis based upon construction results (as-built)
Aspen Icarus(AspenTech)
Analysis based upon operation results
Piping classes, equipment correlation in 3D simulation and equipment tags in P&ID
SmartPlant
Foundation
(Intergraph)
SmartPlant
Instrumentaton
(Intergraph)
Facility data storage and systematization
SmartPlant
Electrical
(Intergraph)Detailed Design for
Electrical
Detailed Design for Instrumentation
Facility 3D-Model
ONHP is applying the software products, which allow planning and control implementation of entire project at the very early Project Phase. That meets all current world requirements pertaining to each design phase starting from Justification of Investments and up to Operation.
6
Project Management Control ( РМС) (technical resources)
Software complexes integration allows covering all processes within the refinery
Projects planning and control
Project management control
Document flow management
Finances
PS
ControllingSales
managementHuman Resource management
Production management
Procurement
Project Management. Project management including planning and control. Timesheets. Data acquisition on actual working hours and material expenditures.PrimaveraWeb (MyPrimavera). Remote access for internal and external users + additional functions providing visualization at analytical data review.
Document flow and document archives
3D
It allows defining major process and construction blocks, which influence start point of commissioning depending on their readiness state; it also enables to accurately coordinate installation sequence of major equipment and critical construction structures.
It allows performing quality control of critical structures and process equipment installation at early installation stage by scanning implemented works and performing stacking on target model.
3-D Design
Projects system
7
Организация коммуникаций по проекту
ClientGeneral Designer
Coordination & functional organization
chart
Coordination technical resources
Coordination Procedures
Identification of documents to be
submitted
Communication procedure
Ftp-server
Project participants
�Initial data�Design and estimate documentation, including revisions�Letters�MOMs�Accountancy
�Initial data�Design and estimate documentation, including revisions�Letters�MOMs
� Design and estimate documentation, including revisions�Letters�Accountancy
�Initial data�Design and estimate documentation, including revisions�Letters�MOMs
�Initial data�Letters�MOMs�Accountancy
Client
General Designer Vendors General Designer
Licensors
Design companies
Contactors
Communication procedure defines a specialist responsible for carrying on correspondence and providing coordination with other project participants
Communication procedure defines technical resources and access rights of project participants
Communication procedure determines project procedure:�Letters, MOMs, other documents designation procedure;�Addressees and mailing lists;�Format of documents to be submitted;�Electronic documents arrangement rules (uploading onto ftp-server);�Project reporting forms;�Letters reply and reporting submission deadlines.
Communication procedure determines:�Letters, MOMs, other documents designation procedure;�Forms of accompanying documents (Transmittal);�Requirements for design and estimate documentation naming, including revisions and considering automatic processing of document packages based upon attached list (Transmittal);�Applied code numbers for design and estimate documentation
Communication organization for project realization
8
Experience in General Design
Oil Company RefineryCapacity,
MTA Site, ha
OAO Gazpromneft (Russia) OAO Gazpromneft – Omsk Refinery 19,5 1125
NIS a.d. (Serbia) Pančevo Refinery, Novi Sad Refinery 5,7 320
Oil Company “Alliance” (Russia) OAO Khabarovsk Refinery 3,0 90
AO Oil Company “KazMunaiGaz” (Kazakhstan)
TOO Atyrau Refinery 5,0 242
9
Омск (Центральный офис)
Белград
Астана
Москва
Стратегия создания и развития филиалов компании направлена на приближение места разработкирабочей документации к месту строительства для сокращения коммуникации в процессе производства строительно-монтажных работ.
- существующие на сегодняшний день офисы ОАО «Омскнефтехимпроект»
- офисы, открытие которых запланировано в ближайшем будущем
Feed Capacity
Petrochemical Complex at TOO Atyrau Refinery (General Designer)
General contract to perform Project Design Documentation, Basic Design approval.
Catalytic Reforming Plant. Aromatics Plant(benzene, toluene, paraxylene). Off-Site Facilities.
1 MTA
1 MTA
Deep Oil Refining Complex at TOO Atyrau Refiney(General Designer)General contract to perform Project Design Documentation and Basic Design approval. The institute has developed Bid package for ЕРС. Public hearings were held and positive conclusion of the Kazakhstan State Expertise Committee were received.
At present ONHP performs engineering consulting for ЕРС Contractor – Sinopec Engineering.
16 Process Units:1. Fluid Catalytic Cracker2. Non-Saturated Gas Fractionation Section3. LPG Desulphurization Unit.4. Pre-Treatment. Oligomerization Unit. 5. Butene Oligomerization Unit.6. Polybenzine Hydrogenation.7. Cat Naphtha Selective Hydrogeneration Unit8. LCCN (Light Catalytically Cracked Naphtha) Etherification Unit9. Naphtha Hydrotreater10. Gasoil Hydrotreater11. Sulphur Recovery Unit12. Amine Regeneration Unit13. Sulphur Recovery and Forming (Granulation) Unit14. Saturated Gas Fractionation Section15. Isomerization Unit16. Hydrogen Production Plant
2.4 MTA
2.4 MTA
1.2 MTA
1.4 MTA
Work in progress for gas- and petrochemical faciliti es during the last 2 years
10
Feed Feed Feed Feed CapacityCapacityCapacityCapacity
Primorsky Petrochemical PlantIncluding terminal. (General Designer)General design with Subcontractors project activities coordination, BDP acceptance, facilities affixment on General Layout, Off-Site Facilities design. Topographic and geodesic, geological and engineering, engineering hydrometeorological, engineering and ecological investigations, topographic survey performance.Declaration of Intent development.Project Design documentation development.
Project Design documentation has been performed for 281 fa cilities including 13 Combined Process Units :-Pyrolysis Unit-MEG Plant-LAO Plant-PE Plant -Styrene Unit -Combined Fluid Catalytic Cracking (FCC) Unit-C4 Alkylation Unit -PP Plant -Desalter&CDU&VDU-20 Complex -Aromatics Complex -Hydroprocessing Unit -MDEA and Sulfur Regeneration Unit -Flexicocking Unit
20 MTA
OOO “RN-Tuapse Refinery”Detailed Design Documentation development
Hydrogen Unit (the largest in Russia)LPG Storage and Self-Loading Complex Crude Oil Tank Farm Modernization (3 Spheres + concrete dike with the capacity of 20 000 m3)
236 TTA (hydrogen)
Far-East Petrochemical Complex including terminal. Nakhodka cityEngineering investigations, topographic survey, Project Design documentation development for Plants and Off-Site Facilities, Subcontractors coordination, facilities affixment on General Layout
-Pyrolysis Unit-PP Plant -PE Plant (Gas-phase)- PE Plant (Slurry)-LAO Plant-MEG Plant (monoethyleneglycol)
10 MTA
Work in progress for refinery and petrochemical fac ilities within the last 2 years
11
12
Белград
АстанаFeed Capacity
OOO Tobolsk-NeftekhimBroad Fraction of Light Hydrocarbons Processing
Complex Expansion (min. 5.8 MTPA)(General Designer)
Gas Fractionation Unit – 2.Northern and Southern Bases Project and Detailed Design documentation development, GlavGosExpertiseundergoing and positive conclusion receipt.
3.2 3.2 3.2 3.2 MTAMTAMTAMTA
Feed Capacity
OAO SurgutNefteGasGas Processing and Compression Facilities No.1, 2 for associated gas processing and recovery of broad fractions of light hydrocarbons from such gas and dry stripped gas recovery(General Designer)
Gas Processing and Compression Facility No.1, 2.
Project and Detailed Design documentation development, GlavGosExpertise undergoing and positive conclusion receipt.
4.0 bln. m3 / year
Омск (Центральный офис)Москва
Work performed in regard to gas- and petrochemical f acilities within the last 2 years
12
Feed Capacity
Khabarovsk Refinery Hydroprocess Complex Facilities (General Designer)
Off-Site Facilities for Hydrocracking,Hydrotreating Combined Unit
1 1 1 1 MTAMTAMTAMTA500 500 500 500 TTATTATTATTA
Khabarovsk RefineryVT-Visbreaker Complex (General Designer)
VT Unit; Visbreaker; Off-Site Facilities.
1.8 1.8 1.8 1.8 MTAMTAMTAMTA750 750 750 750 TTATTATTATTA
Feed Capacity
Gazpromneft – Omsk Refinery FCC Naphtha Hydrotreating & Diesel Hydrotreating Complex (General Designer)
FCC Naphtha Hydrotreating. Diesel Hydrotreating. Off-site Facilities
1.2 MTA3 MTA
Gazpromneft – Omsk Refinery Off-site Facilities for Light Naphtha IsomerisationPlant (Isomalk-2) (General Designer)
Off-site Facilities for Isomerisation Plant 800 TTA
Gazpromneft – Omsk Refinery Gasoline Quality Upgrading Complex(General Designer)
Continuous Catalytic Reforming Plant. Off-site Facilities
1 MTA
Hydrogen Plant reconstruction at Gazpromneft Moscow Refinery JSC. (General Designer)
Detailed Design documentation development. 20 500 Nm3/h
13
Омск (Центральный офис)Москва
Work performed in regard to gas- and petrochemical f acilities within the last 2 years
13
Feed Capacity
MHC/DHT Complex at Pan čevo Refinery(General Designer)
Hydrotreater / Hydrocracker (FEED+DD) Sour Water Stripper Gas Fractionation Unit ModernizationOff-Site FacilitiesLPG Storage
3 MTA
14
Complex capacity 10 MTA of hydrocarbon feedstock (HES capacity-685 MW)Finished commodity: Polypropylene, Polyethylene, Monoethyleneglycol, Butadiene, Benzene, PyrolisGasoline, Fuel Oil
Complex area Plant area 620,97 hectare including:Terminal area– 56,43 hectare
Construction term 2013-2017 – Site Engineering Prepa ration and 1 st
term Construction1.Propylene Plant "Innovene PP“ process Ineos Commercia l Services (UK) Limited
2.PE (gas-phase) Plant for "Innovene G“process
Ineos Commercial Services (UK) Limited
3.PE (slurry) Plant for "Innovene S“ process Ineos Comm ercial Services (UK) Limited
4. Pyrolysis Plant Lummus Technology Inc5.LAO Plant “AlphaHexol (TM)”, “AlphaButol
(TM)” processes Axens IFP Group Technologies
6.MEG (monoethyleneglycol) Plant Shell Research Limi tedPE and PP Plants capacity For PP– 800 TTA
For PE (S) – 350 TTAFor PE (G) – 500 TTA
LLI equipment quantity 320 kinds of equipment
General characteristics of Far- East Petrochemical C omplex